This Sources Sought opportunity was posted on July 24, 2019. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

C--BUILDING 29 SEAL ATTIC PARAPET AND TUCKPOINT

Awarded
36C24219R0170Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 541330
New
SLED
Dam Safety Engineering Services – Southern California
Solicitation # 10221501
The California Department of Water Resources, Division of Operations and Maintenance and Dam Safety Services Branch, is soliciting Statements of Qualification for as-needed engineering and related services to support the review, inspection, evaluation, analysis, and oversight of structures associated with the State Water Project. With an estimated total contract range between 30 million and 40 million dollars, the work primarily focuses on the Southern Field Division, Castaic Field Division, and FERC Project Nos. 2426 and 2100, with potential backup support for the Oroville, Delta, and San Luis Field Divisions. Key services include dam performance surveillance, the development of monitoring plans and technical information documents, and specialized inspections involving drones, ROVs, and rope access for various appurtenances such as hydropower plants, spillways, and gates. The contract period is estimated to run from March 2, 2027, to March 1, 2030, with awards based on a most qualified selection process involving panel scoring and interviews. Qualified firms must submit their SOQs by November 17, 2026, and are required to provide a new Generative AI disclosure. Selected contractors must comply with Department of Industrial Relations prevailing wage requirements and provide comprehensive quality control and worker safety programs. Administration is managed by the DWR Contract Manager, with payments issued within 45 days of receiving undisputed invoices following verbal notice of work acceptance.
California Department of Water Resources

POSTED

about 2 hours ago

DEADLINE

in 18 days
NAICS: 541330
New
SLED
Construction, Engineering And Inspection (CEI) Services For The Sands Boulevard And Surfside Boulevard Bridge Repair Projects
Solicitation # 2026-RFP-PW-070-KR
The City of Cape Coral is soliciting proposals for Construction Engineering and Inspection (CEI) services for two federally funded bridge repair projects: the Sands Boulevard Bridge over Eternity Canal and the Surfside Boulevard Bridge over Maxine Canal. The selected engineering firm will provide construction contract administration to restore resiliency to bridge approaches, bulkheads, and shoreline protection. These projects are funded through the FDOT Local Agency Program and must adhere to FDOT manuals, FHWA requirements, and federal-aid compliance standards. The contract duration is 300 calendar days from the Notice to Proceed, and the consultant must be capable of supporting both projects concurrently or independently. The procurement follows a Qualifications-Based Selection process, with proposals due by November 5, 2026. To be responsive, firms must be FDOT prequalified and provide evidence of professional licensure in Florida. Evaluation is conducted by a Selection Advisory Committee based on personnel qualifications, team management, and prior experience. Awarded consultants must provide payment and performance bonds and meet comprehensive insurance requirements for professional and general liability. Compliance mandates include the Davis-Bacon Act, Build America Buy America Act, and specific environmental protections for threatened burrowing owls.
Public Works

POSTED

about 3 hours ago

DEADLINE

in 7 days
NAICS: 541330
New
SLED
Engineering Services for the Community Center HVAC Upgrades
Solicitation # RFP 2418
The Township of Wayne, New Jersey, is soliciting proposals under RFP 2418 for professional engineering services to manage HVAC upgrades at the Wayne Township Community Center. The project scope involves the replacement of all existing HVAC equipment, including 22 air handling units, a pool air handler, 19 exhaust fans, and one dedicated outdoor air system, as well as various other units throughout the facility. All new equipment must be integrated into a new Building Management System installed separately by the Township. The selected firm will be responsible for three primary phases: preliminary design, including field verification and cost estimation; final design, consisting of construction documents and a phased bidding plan; and construction administration, which includes bidding support, shop drawing reviews, and final punch list development. Proposals must be submitted electronically via the ProcureNow portal by November 5, 2026, at 11:00 am. The evaluation process uses a points-based system weighted toward cost (40 percent), general technical responsiveness and methodology (30 percent), and management experience and qualifications (30 percent). Bidders are required to provide lump sum pricing for each project phase and a schedule of hourly rates for unforeseen services. The contract duration is up to two years, with the possibility of two one-year extensions. Mandatory submission documents include a statement of interest, firm qualifications, key personnel resumes, a project approach, a W-9, and notarized non-collusion and ownership disclosure affidavits. Awarded contractors must provide a performance bond, certificate of insurance, and EEO compliance documentation within 14 days of receipt.
Purchasing Division

POSTED

about 3 hours ago

DEADLINE

in 13 days

General Info

Agency

N/A

Contract Value

$174,196.27

NAICS

541330 - Engineering Services

Place of Performance

Montrose VA Medical Center;2094 Albany Post Road;Montrose, New York 10548 12590 United States

Set-Aside

SDVOSBC

Award Issued Date

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

PhaseAwarded
Posted

Sources Sought

Awarded

Contract was awarded

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyN/A
ContactsNo contacts available
OfficeN/A
Organization / Agency
N/A
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
THIS ANNOUNCEMENT IS NOT A REQUEST FOR PROPOSAL. THE GOVERNMENT WILL NOT PAY NOR REIMBURSE ANY COSTS ASSOCIATED WITH RESPONDING TO THIS REQUEST. THE GOVERNMENT IS UNDER NO OBLIGATION TO AWARD A CONTRACT AS A RESULT OF THIS ANNOUNCEMENT. The Department of Veterans Affairs is seeking a qualified Architect-Engineering (AE) firm to provide Schematics, Design Development, Construction Documents, Technical Specifications, Construction Period Services, Site Visits, Cost Estimates, As-Built Documentation, and all other related information for Project 620-14-104 Seal Attic Parapet and Tuckpoint at Building 29. This Project will provide for a an investigation of the existing roof system at building 29 at the Hudson Valley Health Care System, Montrose Campus, 2094 Albany Post Road, Montrose, NY 10548. This requirement is being procured in accordance with the Brooks Act as implemented in FAR Subpart 36.6. Applicable NAICS code is 541310 and small business size standard of $15 Million. Magnitude of Construction is between $1,000,000.00 and $5,000,000.00. This is a 100% Service Disabled Veteran-Owned Small Business Set Aside. The anticipated award date of the proposed A-E Contract is on or before November 15, 2019. Potential contractors must be registered in SAM (www.sam.gov) and visible/certified in Vet Biz (www.vetbiz.gov) at time of submission of their qualifications in order to be considered for an award. As a prospective offeror or bidder for this Service Disabled Veteran-Owned Small Business (SDVOSB) set aside, you are verifying your company meets the status requirements of a VOSB concern as established by 38 CFR Part 74. NOTE - Offerors are referred to 48 CFR 852.219-10(c) (1): Services (except construction) at least 50 percent of personnel for contract performance will be spent for employees of the concern or employees of other eligible service disabled veteran-owned small business concerns . In order to assure compliance with this clause, all firms submitting a SF 330 for this Sources Sought Notice are required to indicate what percentage of the cost of contract performance will be expended by the concerns employees and in which discipline(s) and percentage of cost of contract performance to be expended (and in what disciplines) by any other subcontracted or otherwise used small or large business entity(s). Any subcontracted or otherwise business entity(s) used must be identified by name, office location and size/type of business (i.e. SDVOSB, VOSB, 8(a), large, etc). SCOPE OF SERVICE REQUIRED PROJECT NO. 620-14-104 Seal Attic Parapet and Tuckpoint at Building 29. Provide all Contract Drawings, Specifications and Estimates in accordance with the design submission phases of the seal attic parapet and tuckpoint project at building 29. The construction documents shall provide sufficient information and detail to illustrate, describe and clearly delineate the design intent of the AE Firm and enable all Contractors to uniformly bid the project. Provide all construction period services including the review and approval all of product and shop drawing submittals for the project, change orders, and all field site visits & reports. . This Scope of Work is intended as a guide for the AE to understand the overall basic design requirements of the project and is not intended to identify each specific design component related to code and construction items. The AE shall provide those details during the design phase of the project ensuring that they are in compliance with all applicable codes, regulating authorities, and the guidelines. Codes required for compliance in this project include but are not limited to: NFPA New York State Fire Prevention and Building Code ADAAG ASHREA NEC AISC ACI The latest edition of code as of the time of contract being signed shall be used. In addition, any governing requirements that are scheduled to take effect on or before April 30th, 2019 are to be included in the design. The Architect-Engineering (AE) firm shall be responsible for communication with, submission to, review with, and satisfaction of all necessary reviews with regulatory bodies. There shall be a preliminary engineering report supplied to all governing regulatory agencies with the 95% preliminary submission, and approval of this preliminary report must be received before the 100% preliminary design is considered complete. There shall also be a final engineering report supplied to all governing regulatory agencies with the 65% contract drawing submission, and approval of this preliminary report must be received before the 95% contract drawing design is considered complete. 100% complete contract submission package shall be submitted to the VA 14 days after 95% contract drawing design is approved. The AE firm is responsible for all other submissions required by these agencies for review, and for any corrections or adjustments required as a result of these reviews. X. LOCATION This Project will replace the building roof system at building 29 at the Hudson Valley Health Care System, Montrose Campus, 2094 Albany Post Road, Montrose, NY 10548. COST RANGE Estimated Construction Cost Range: Between $1,000,000 and $5,000,000. TYPE OF CONTRACT CONTEMPLATED The Department of Veterans Affairs is contemplating awarding a firm fixed price contract. ESTIMATED START AND COMPLETION DATES The Department of Veterans Affairs requires design and contract support services. The estimated start and end dates for the design and start and end dates for the construction are as follows: ITEM - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - DATE Receive Notice to Proceed from (NTP) - - - - - - - - - - - - - - - - - - TBD - - - - - - - - - - - - - - - - - - - - - - - - Deliver 100% Preliminary Design - - - - - - - - - - - - - - - - - - - - - - 45 calendar days from NTP 100% Preliminary Design Review - - - - - - - - - - - - - - - - - - - - - 60 calendar days from NTP Deliver 65% Working Drawings - - - - - - - - - - - - - - - - - - - - - - 105 calendar days from NTP 65% Design Review - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - 120 calendar days from NTP Deliver 95% Working Drawings - - - - - - - - - - - - - - - - - - - - - - - 165 calendar days from NTP 95% Design Review - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - 186 calendar days from NTP Deliver 100% Working Drawings - - - - - - - - - - - - - - - - - - - - - - 231 calendar days from NTP 100% Design Review - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - 252 calendar days from NTP Deliver Construction Drawings and Bid Docs - - - - - - - - - - - - - 282 calendar days from NTP Review Construction Drawings and Bid Docs - - - - - - - - - - - - - 296 calendar days from NTP AE Submits final complete package to contracting 318 calendar days from NTP The A/E shall perform the work required within the limits of the following schedule. Professional architects, engineers and related design disciplines familiar with the work shall be provided, as directed by the Contracting Officer, to attend the VA reviews. Construction: Number of calendar days to complete construction is to be determined by the AE firm after the design is complete. SELECTION CRITERIA/DESCRIPTIONS The selection criteria descriptions are provided below. PROFESSIONAL QUALIFICATIONS NECESSARY FOR SATISFACTORY PERFORMANCE OF REQUIRED SERVICES. Provide brief resumes of proposed team members who will specifically serve as the Project Managers and Designers of Record. The Designers of Record shall perform and direct the design within their respective discipline and shall sign and seal the drawings. All Designers of Record must be professionally registered in their discipline. Each resume shall include a minimum of two (2) specific completed projects that best illustrate the individual team members experience relevant to this contract scope; SPECIALIZED EXPERIENCE AND TECHNICAL COMPETENCE Specialized experience and technical competence required for this specific project, including, where appropriate, experience in energy conservation, pollution prevention, waste reduction, and the use of recovered materials. CAPACITY This factor evaluates the ability of the firm, given their current projected workload and the availability of their key personnel, to accomplish the possible myriad of design projects in the required time. The general workload and staffing capacity of the design office will be evaluated. List current projects with a design fee of greater than $20,000 being designed in the firms office. Indicate the firms present workload and the availability of the project team (including sub-consultants) for the specified contract performance period; Describe experience in successfully delivering projects per performance schedule, providing timely construction support, and successfully completing multiple projects with similar delivery dates PAST PERFORMANCE: VISN2 will evaluate past performance on recent and relevant contracts with government agencies (emphasis on VA work) and private industry in terms of cost control, quality of work, compliance with performance schedules and a record of significant claims against the firm due to improper or incomplete engineering services (references required). Recent is defined as performance occurring within 5 years of the date of this Sources Sought, except that ongoing projects must have begun no less than one (1) year prior to the issuance of this Sources Sought. Relevancy is defined as performance of work on projects that are similar in scope to the types of projects anticipated under the resultant contracts. Respondents with no previous past performance shall state this when addressing the selection criteria. Where there is no record of past performance, the proposal will be evaluated neither favorably nor unfavorably. Superior performance ratings on relevant projects may be considered more favorably in the evaluation. Submission Requirements: Submit a minimal of three (3) references; any of the following evaluations are acceptable: Contractor Performance Assessment Report System (CPARS), or Past Performance Questionnaire (PPQ) evaluation for each project submitted under Criterion 2. If a completed CPARS evaluation is available, it shall be submitted with the completed SF330 package. If there is not a completed CPARS evaluation, the PPQ included with this notice is provided for the Offeror or its team members to submit for each project included in criterion (2). If a PPQ is submitted, but an official CPARS evaluation is found for that project in government databases, the official evaluation will take precedence. If a CPARS evaluation is not available, ensure correct phone numbers and email addresses are provided for each contract customer/reference. Completed PPQs should be submitted with your SF330. If the A-E is unable to obtain a completed PPQ from a contract customer/reference for a project before the response date set forth in this notice, the A-E should complete and submit with their response the first page of the PPQ (Attachment #1), including contract and point of contact information for the respective projects. A-Es should follow-up with references to ensure timely submittal of questionnaires. At the reference s request, questionnaires may be submitted directly to the Governments point of contact, Attn: Daniel Barone, via email at contact@example.gov, prior to the response date. A-Es shall not incorporate by references into their response CPARS or PPQ evaluations previously submitted in response to other A-E services procurements. However, this does not preclude the Government from utilizing previously submitted PPQ information in the past performance evaluation. Submitted CPARS and PPQ evaluations will not be counted as part of the 30 page limitation and shall be attached to the SF330, behind the SF330 Part II document LOCATION The A/E Firm proximity to the Franklin D. Roosevelt VA Medical Center, Montrose, New York 10548 is an evaluation criteria. This distance is determined according to http://maps.google.com/ This factor evaluates the distance the AE firm's design office or offices lies from the location of work. Please provide the address (es) and distance of your closest office to the address listed below. (6) Reputation and standing of the firm and its principal officials with respect to professional performance, General Management, and cooperativeness. (7) Record of significant claims against the firm because of improper or incomplete architectural and engineering services. (8) Specific Experience and Qualifications of personnel proposed assignment to the project and their record of working together as a team. PLEASE NOTE: The AE Evaluation Board must be provided with complete and accurate information for ALL eight (8) evaluation factors above in order to rank as qualified and eligible firms. Therefore, the AE firm must expand upon, as it deems necessary, on any evaluation factor not well demonstrated or addressed with Part 1A to Part IG and Part II of the SF330. The AE firm shall use Part IH and/or use additional sheets to supplement/address all evaluation factors to clearly demonstrate its qualifications. LIMITATIONS VA NOTICE OF TOTAL SERVICE-DISABLED VETERAN-OWNED SMALL BUSINESS SET-ASIDE (JUL 2016) (DEVIATION)(a) Definition. For the Department of Veterans Affairs, Service-disabled veteran-owned small business concern or SDVSOB :(1) Means a small business concern: (i) Not less than 51 percent of which is owned by one or more service-disabled veterans or, in the case of any publicly owned business, not less than 51 percent of the stock of which is owned by one or more service-disabled veterans or eligible surviving spouses (see VAAR 802.201 Surviving Spouse definition); (ii) The management and daily business operations of which are controlled by one or more service-disabled veterans (or eligible surviving spouses) or, in the case of a service-disabled veteran with permanent and severe disability, the spouse or permanent caregiver of such veteran; (i) The business meets Federal small business size standards for the applicable North American Industry Classification System (NAICS) code identified in the solicitation document; (iv) The business has been verified for ownership and control pursuant to 38 CFR 74 and is so listed in the Vendor Information Pages database, (https://www.vip.vetbiz.gov); and (v) The business will comply with subcontracting limitations in 13 CFR 125.6, as applicable (2) Service-disabled veteran means a veteran, as defined in 38 U.S.C. 101(2), with a disability that is service-connected, as defined in 38 U.S.C. 101(16). (b) General. (1) Offers are solicited only from verified service-disabled veteran-owned small business concerns. Offers received from concerns that are not verified service-disabled veteran-owned small business concerns shall not be considered. (2) Any award resulting from this solicitation shall be made to a verified service-disabled veteran-owned small business concern. (c) Agreement. A service-disabled veteran-owned small business concern agrees that in the performance of the contract, the concern will comply with the limitation on subcontracting requirements in 13 CFR §125.6. (d) A joint venture may be considered a service-disabled veteran owned small business concern if the joint venture complies with the requirements in 13 CFR 125.15, provided that any reference therein to SDVO SBC is to be construed to apply to a VA verified SDVOSB as appropriate. (e) Any service-disabled veteran-owned small business concern (non-manufacturer) must meet the requirements in FAR 19.102(f) of the Federal Acquisition Regulation to receive a benefit under this program. SUBMISSION REQUIREMENTS Qualified Service Disabled Veteran Owned Small Business firms are required to submit three (3) hard copies of the SF 330 (which can be downloaded from www.gsa.gov/forms ) and one (1) Compact Disc (CD) which contains digital copies of the SF 330. All packages shall be submitted no later than August 29, 2019 including Past Performance (CPARS) evaluations or Questionnaires (attachment 1). All submittals must be sent to the attention of Daniel Barone, 2094 Albany Post Road, Building 29, Montrose, New York 10548. The submission must include an insert detailing the following information: 1. Dun & Bradstreet Number; 2. Tax ID Number; 3. The e-mail address and phone number of the Primary Point of Contact and; 4. A copy of the firms CVE verification The Contracting Officer is not responsible for not receiving submissions due to the offeror misaddressing the package or illegibility of the information. NOTE: Any request for assistance with submission or other procedural matters shall be submitted via email only to Daniel Barone telephone inquiries will not be honored. THIS ANNOUNCEMENT IS NOT A REQUEST FOR PROPOSAL. THE GOVERNMENT WILL NOT PAY NOR REIMBURSE ANY COSTS ASSOCIATED WITH RESPONDING TO THIS REQUEST. THE GOVERNMENT IS UNDER NO OBLIGATION TO AWARD A CONTRACT AS A RESULT OF THIS ANNOUNCEMENT.

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS