Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Government Contract opportunity was posted on August 23, 2013. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

C--Construct Stand Alone Community Living Center VA Medical Center, Fayetteville, NC 100% SDVOSB Set Aside

Awarded
VA24613R0565Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 541330
New
SLED
Road Asset Management
Solicitation # FY27-ENGCP-002-6
The Bulloch County Board of Commissioners is soliciting Statements of Qualifications for project FY27-ENGCP-002-6, focused on Road Asset Management. The selected consultant will be responsible for collecting and analyzing field data, creating a road asset inventory, and developing a Capital Improvement Plan with an outlook extending to FY 35. The scope includes GIS database development, web-based mapping, and the identification of structural hazards and drainage failures to minimize safety risks and legal liability. All prime and sub-consultants must be GDOT Prequalified Contractors as of the submission deadline on November 20, 2026, at 3:00 PM EDT. Proposals are evaluated based on a composite scoring system that weights prime consultant experience and technical approach at 20% each, GIS capabilities at 20%, asset prioritization methodology at 15%, workload capacity at 15%, and past references at 10%. The highest-ranked consultant will be invited to negotiate a contract. Key requirements include a Principal-in-Charge with at least 10 years of industry experience and comprehensive insurance coverage, including professional malpractice and general liability of at least 1 million dollars per occurrence. Submissions are limited to ten pages, excluding mandatory forms and charts, and must include a Non-Collusion Affidavit and Bidder Declaration. Either party may terminate the resulting agreement with 30 days written notice.
Bulloch County Board of Commissioners

POSTED

about 5 hours ago

DEADLINE

in 22 days
NAICS: 541330
New
International
CoT RFP Event Q30-01-2026-27
Solicitation # Q30-01-2026-27
The City of Tshwane is soliciting a service provider for professional engineering services to support town planning subdivision application processes on city-owned properties. The scope of work is divided into three primary categories: Civil Services Reports, Geotechnical Investigations, and Route Determination Reports. All services must be led by a Professional Engineer registered with the Engineering Council of South Africa and must comply with the Gauteng Transport Infrastructure Act, National Building Regulations SANS 10400, and various SANS and SANRAL standards. The project follows a strict timeline, requiring an inception meeting within one month, draft reports within three months, final reports within five months, and project close-out within six months of appointment. The solicitation, numbered Q30-01-2026-27, closes on November 12, 2026, at 10:00. Awards are based on an 80/20 preferential point system in accordance with the Preferential Procurement Policy Framework Act and 2022 Regulations, with specific goals including points for women-owned, youth-owned, and disability-owned enterprises, as well as local economic participation. Evaluation occurs in four stages, starting with administrative responsiveness and a functionality score of at least 70 out of 100. Successful bidders must enter into a Service Level Agreement, with payment terms set at 30 days following the receipt of an invoice. Required submission documents include company registration, tax clearance or a CSD unique pin, and B-BBEE certification.
City of Tshwane

POSTED

about 8 hours ago

DEADLINE

in 13 days

General Info

Agency

N/A

Contract Value

$885,289

NAICS

541330 - Engineering Services

Place of Performance

Not specified

Set-Aside

NONE

Award Issued Date

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

1 update
PhaseAwarded
Posted

Sources Sought

Notice updated

The notice title changed. The notice description changed.

Awarded

Contract was awarded

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyN/A
ContactsNo contacts available
OfficeN/A
Organization / Agency
N/A
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
General Information The Department of Veterans Affairs Medical Center (VAMC), 2300 Ramsey Street, Fayetteville, North Carolina 28301 is seeking a qualified Service-Disabled Veteran-Owned Small business (SDVOSB) A/E firm to provide Schematics, Design Development, Construction Documents, Technical Specifications, Construction Period Services, Site Visits, Cost Estimates, As-Built Documentation, and all other related information for project 565-131, Construct Stand Alone Community Living Center (CLC), to be located on the north side of campus where exiting administrative services are housed and on undeveloped land on the medical center grounds. The current site location has 3 historical buildings and 1 non-historical building that could potentially be removed. This procurement is restricted to Service-Disabled Veteran-Owned Small Business (SDVOSB) firms. This requirement is being procured in accordance with the Brooks Act as implemented in FAR Subpart 36.6. Applicable NAICS code is 541330 and small business size standard of $14 Million. Magnitude of Construction is between $5,000,000 and $10,000,000.00. This is a 100% Service-Disabled Veteran-Owned Small Business Set Aside. The anticipated award date of the proposed A-E Contract is on or before June 30, 2013. Potential contractors must be registered in SAM (www.sam.gov) and visible/certified in Vet Biz (www.vetbiz.gov) at time of submission of their qualifications in order to be considered for an award. As a prospective offeror or bidder for this Service-Disabled Veteran-Owned Small Business (SDVOSB) set aside, you are verifying your company meets the status requirements of a SDVOSB concern as established by 38 CFR Part 74. NOTE - Offerors are referred to VAAR Clause 852.219-10(c)(1): "Services (except construction) at least 50 percent of personnel for contract performance will be spent for employees of the concern or employees of other eligible service-disabled veteran-owned small business concerns". In order to assure compliance with this clause, all firms submitting a SF 330 for this Sources Sought Notice are required to indicate what percentage of the cost of contract performance will be expended by the concerns employees and in which discipline(s) and percentage of cost of contract performance to be expended (and in what disciplines) by any other subcontracted or otherwise used small or large business entity(s). Any subcontracted or otherwise business entity(s) used must be identified by name, office location and size/type of business (i.e. SDVOSB, VOSB, 8(a), large, etc). Scope of Work Construct Stand Alone Community Living Center Architectural/Engineering Design Services Project: 565-131 VAMC Fayetteville, NC Statement of Work I. General Intent II. Scope of Work III. Materials Provided to AE after Award IV. Design Requirements V. Review Requirements and Time Frames A. 25% Review B. 50% Review C. 99% Review D. Final Submission VI. Schedule VII. Construction Services VIII. CAD Requirements I. GENERAL INTENT: Provide professional engineering services to include conceptual drawings, investigative surveys and reports, planning, consultation and visits, design work, preparation of contract drawings and specifications, preparation of cost estimates and provision of construction period services as necessary for all demolition, modification, construction, inspection, testing and certification for all construction components for project 565-131, Construct Stand Alone Community Living Center (CLC), to be located on the north side of campus where exiting administrative services are housed and on undeveloped land on the medical center grounds. The current site location has 3 historical buildings and 1 non-historical building that could potentially be removed. The construction budget is $ 9,000,000. The intent of this project is to work under review authority of the VAMC Staff to design and prepare a set of complete construction documents for all architectural, civil, mechanical, plumbing, electrical, and other applicable components of this project for phase 1 of a new Community Living Center. II. SCOPE OF WORK: This project will engage an Architectural Engineering (AE) firm to provide Conceptual Drawings, Contract Drawings, Functional Layouts, Specifications, Construction Cost Estimates, Engineering Calculations, and subsequent Construction Period Services for the above referenced project. The Design team is responsible for coordinating with the Contracting Officers Technical Representative (COR) and appropriate VA personnel to determine a plan for the new building. Part 1: For the first part of this effort, AE shall identify and present at least two, but no more than three, feasible options for the placement of a 69 bed Community Living Center (CLC) on the existing campus. The selected site for the CLC could possibly result in the demolition of three historical buildings (#4, #5, and #7) and one non-historical (#6) building. The CLC will consist of a one or two story community building and five to seven single story residential buildings with parking located in close proximity to all of the residential buildings. The AE shall also develop at least three concepts for the new structure and provide recommendations for location. The AE shall give an on-site presentation of the conceptual designs and recommendations to VA personnel. The VA will review designs and provide feedback in a timely manner to the AE in order to incorporate in final reports. Options and concepts shall include magnitude cost estimates, renderings, pros and cons, pictures, and the impact to the existing historical buildings. VA will choose one location option and concept and the AE shall move on to Part II. Part I shall be completed in 3 months from the Notice to Proceed (NTP). Part II: Under Part II of this effort, AE shall develop a detailed design for the community building and the residential buildings which will house no less than 30 beds. The AE shall provide, as necessary, site-utility surveys, geo-technical services, environmental assessments, traffic studies, and any other studies that may be required to facilitate the design. In accordance with VA criteria and PG-18-15, the RFP documents shall include complete narratives for each discipline, performance specifications, final cost estimates, and incorporation of comments received during the interactive review process. A Kick-off meeting shall be held on site at the issuance of the task order, to include the AE, VA Project Manager, and VAMC personnel. Part II shall be completed within 4 months of completing Part I. Note: The VA Certification and Accreditation (C&A) requirements for the AE's computer system do not apply to this procurement, and a computer Security Accreditation Package is not required. Note to CO: Please insert provisions of VAAR 852.273-75 into procurement instructions for this solicitation. A. DEMOLITION: In the event the historical buildings cannot be saved, the design will include a complete demolition of the existing building(s) interior & exterior walls, ceiling, flooring, utilities, etc. in its entirety. B. NEW WORK: Provide Conceptual Drawings for a pod like, 69 bed community living center. The community building (central hub) will be connected to each pod (housing approximately 10 private living quarters). This project is part of the cultural transformation for our veterans and will permit individual private bedrooms with private bathing areas that meet personal comfort with adequate space, a kitchen/dining environment that encourages socialization, a variety of comfortable areas for socialization and relaxation, healing gardens, outdoor lounges and dining and other nature oriented respites. Once the design is selected, construction documents for all architectural, civil, mechanical, plumbing, electrical, and other applicable components will be required. The design must include utilities for the new buildings (separate steam/chilling/cooling tower, & emergency generators) which will include connections. III. MATERIALS PROVIDED TO AE AFTER AWARD: A. PLANS: 1. The facility record drawings and AutoCAD files are available for the AE's use. NOTE: Not all record drawings are available on AutoCAD. Additionally, it is emphasized that the accuracy of facility record drawings must be field verified by the AE. Prints of any current as-built drawings shall be made available to the AE during any of his site visits if requested. The VA Engineering Department drawing files, large size copier and paper will be made available for use by the AE for this purpose. B. SPECIFICATIONS, STANDARDS, ETC: The project design shall be completed in accordance with this AE scope and all appropriate Department of Veterans Affairs (VA) standards, specifications, and other criteria otherwise required by the VA. The AE shall retrieve all VA design information and standards from the VA Facilities Web Site (http://www.va.gov/facmgt/standard). These documents and all national, state and local codes adopted and used by the VA shall be incorporated in the design of this project and reflected in the construction cost estimate. The following references, as applicable, shall be utilized for planning and design purposes: A. June 2011 Design Guide for Community Living Centers (VA Office of Construction & Facilities Mgmt.) B. National CAD Standard Details PG-18-4 C. VHA Program Guide PG-18-3 D. VA Master Construction Specifications E. Structural Design Manual F. National Electric Code G. PG-18-13 Barrier Free Design Handbook H. Life Safety Codes I. Electrical Design Manual J. HVAC Design Manual PG-18-10 K. Government-furnished Record Drawings (AE to field verify conditions) L. PG-18-15 AE Submission Requirements. IV. DESIGN REQUIREMENTS: A. GENERAL: 1. The project shall be designed with viable deductive alternates equal to approximately 10 percent of the construction funding limitation to ensure construction award within program budget limitations. The number of deductive alternates shall be between three and seven. 2. Estimate of construction project costs and duration including simplified schedule to include progress and final inspections and all work required for the base bid and the bid alternatives. Cost estimates and schedules shall be revised for each design submittal. 3. Meeting Minutes: The AE shall take minutes of all meetings, conferences, site visits, etc. A copy of the minutes shall be provided to the Contracting Officer for a concurrence signature. 4. Contract Drawings: Provide fully developed Contract Drawings on AUTOCAD Version 2010 and provide DWG and PDF drawings via email and CD. Hard copy drawings shall be plotted at 1/8" or 1/4" scale, minimum. A larger, more appropriate scale shall be used for sections and details. The final contract drawings (as-builts) shall be black ink on E size (30" x 42") paper. (See also CADD requirements Section V.). 5. Specifications: Provide fully developed and edited specifications in a MICROSOFT WORD 2007 format. Specifications shall be printed on 8 ½" x 11" bond paper, font type Times New Roman, 12 pt. 6. Statement of Work: Provide fully developed executive summary of the construction work required with an estimated construction period MICROSOFT WORD 2007 format. Specifications shall be printed on 8 ½" x 11" bond paper, font type Times New Roman, 12 pt. 7. Construction Cost Estimate: Construction cost estimate shall be organized using the fifty (50) division format developed by the Construction Specifications Institute (C.S.I.). The Engineer shall use MICROSOFT EXCEL 2007 in preparation of the cost estimates. The cost estimate shall include various categories of work involved, quantities, and unit cost. The estimate shall also be based on the anticipated start date for construction, plus an inflation allowance for the Fayetteville, NC area for the anticipated time of bidding. B. DEMOLITION: 1. Show on the plans all walls, plumbing lines, drain lines, mechanical and electrical components to be demolished. 2. Show demolition of any abandon utilities in the construction area. ? C. ARCHITECTURAL: 1. Show structures, doors, equipment, mechanical shafts and exterior spaces impacted by the project and within 32' (in scale) of the surrounding context. Label each room or space with a room title and room number. Room titles on drawings shall be the same as those used in the Space Planning Criteria. 2. Provide all necessary plan, detail, and section views as necessary to convey necessary construction work involved. D. PLUMBING AND SANITARY: 1. Show on the plans the locations and sizes of all new supply and drain lines. 2. Show on the plans the locations and sizes of all new roof drain lines. 3. Show on the plans the locations and sizes of all new fire sprinkler lines. E. MECHANICAL: 4. Show on the plans the locations of all new HVAC equipment including air handler units, chilled water and steam pre-heat coils. 5. Show on the plans the locations and sizes of all new ductwork, dampers, and vents. 6. Show on the plans the locations and sizing of all new piping and ductwork insulation. F. ELECTRICAL: 1. On the plans indicate all new electrical systems and components. 2. On the plans indicate all new connections to the existing electrical systems both normal and emergency. 3. Show on the plans all new fire alarm devices. 4. On plans indicate the locations and sizes of all new HVAC control systems components and connections to the existing Energy Management and Control System. V. REVIEW REQUIREMENTS A. CONCEPTUAL DESIGN REVIEW B. 25% REVIEW: Schematic Contract Drawings, and Specification Sections 1. Two (2) full size Xerox copies or blue line prints of work completed to date. Indicate work remaining to be done and/or information yet to be incorporated. 2. One copy of proposed specification sections to date. Indicate work remaining to be done and/or information yet to be incorporated. 3. CD(s) and email AUTOCAD Version 2010 drawings, and specification sections. C. 50% REVIEW: Design Development Contract Drawings, Specifications, and Construction Cost Estimates 1. Three (3) full size Xerox copies or blue line prints of work completed to date. Indicate work remaining to be done and/or information yet to be incorporated. 2. Two copies of edited specifications to date. Indicate work remaining to be done and/or information yet to be incorporated. 3. CD(s) and email with AUTOCAD Version 2010, drawings, specifications, and construction cost estimates. D. 99% REVIEW: 1. Three (3) full size Xerox copies or blue line prints of work completed to date. The drawings shall be complete in every respect and shall have been checked. 2. CAD drawing files shall be complete in every respect and shall be reviewed by the AE of record. File format and delivery shall be as outlined in CAD requirements Paragraph V. 3. Provide DWG and PDF drawings via email and CD. 4. One set of indexed and unbound specifications. Specs shall be complete in every respect and shall have been checked. 5. Two copies of construction cost estimate. Estimate shall be complete in every respect and shall have been checked. E. FINAL SUBMISSION: Issue 100% contract documents to VA: 1. Three full size Xerox copies or blue line prints of final drawings. Sheet size and title block shall be the same as the sample provided by COTR. 2. 1 set original reproducible plans plus a copy of CD ROM in AUTOCAD Version 2010 format 3. Two sets of final indexed and bound specifications double sided and one copy of the specification sections in one document on the CD ROM in MICROSOFT WORD 2007, not individual documents. 4. On set of electronic PDF format drawings and specifications. 5. 2 copies of the final description of work including base bid and all deduct alternates. Each item shall have cost and time included for that item of work. 6. Final submittal register plus a copy on CD ROM in Excel format 7. 2 copies of typed Final cost estimate, plus a copy on CD ROM in Excel format. VI. SCHEDULE 1. Part I, Layout alternatives submission due 91 calendar days (3 months) from receipt of the Notice to Proceed. 2. Review and selection of alternative due 7 calendar days from receipt of alternatives analysis. 3. Part II, design for the community building and the residential buildings is to be completed 122 calendar days (4 months) after the completion of Part I. 4. 25% design submission due 36 calendar days from the Notice to Proceed. 5. 25% design review comments due 7 calendar days from receipt of 25% design submission. 6. 50% design submission due 18 calendar days from return of 25% review comments. 7. 50% review comments due 14 calendar days from receipt of 50% design submission. 8. 99% design submission due 46 calendar days from return of 50% review comments. 9. 99% review comments due 7 calendar days from return of 99% review comments. 10. 100% Final design submission due 22 days from receipt of 99% review comments. VII. CONSTRUCTION SERVICES (starts once construction notice to proceed is issued) A. PRECONSTRUCTION MEETING: Participate and facilitate this meeting in conjunction with the Contracting Officer and COR, contractor, and representatives of the Building Committee as needed. At this meeting the staging area and work site rules shall be discussed again with the contractor (these should already be included in the specifications). Contract specifications should require a construction schedule submitted within 5 working days from the Notice to Proceed. B. BIWEEKLY SITE INSPECTIONS: Designer shall meet on a minimum of biweekly with the contractor, COR and others needed to inspect the progress of the construction and report any deficiencies to the same. C. CONSTRUCTION CHANGE ORDERS: Designer shall prepare the Statement of Work and Cost estimates (returned within 10 working days) as needed. D. SUBMITTTAL REVIEW AND LOGS: Designer shall prepare and maintain a log of key submittals and also of RFIs and provide the same to the Contracting Officer and COR. Reviewed submittals are to be returned within 10 working days to the COR. Designer is fully responsible for review of all submittals, retaining a record copy of submittals for turn over to the owner upon project completion, and communication with the contractor regarding any deficiencies or changes required to the submittals. E. MONTHLY PROGRESS MEETINGS: Designer shall hold formal progress meetings with contractor, contracting officer, and COR. At these meetings the agenda shall contain a narrative of work completed the previous month, work upcoming, submittals or RFIs outstanding, schedule update, any special coordination items requiring actions, and discussion of change orders or time extension requests. Again, minutes of this meeting shall be issued within 3 working days of the meeting. F. PROJECT CLOSEOUT: Designer shall receive notice of intent for final inspection from the contractor, and contractor shall propose a time and place for this to occur in conjunction with the Contracting Officer and the COR. Following the final inspection, the designer shall issue a punch list. Contract documents shall specify that the contractor has 15 working days to complete the punch list, and notify the designer for re-inspection. Following re-inspection and project acceptance the closeout phase will occur. Release of Claims for Design Project: Prior to the final payment under this design contract or prior to settlement upon termination of the design contract, and as a condition precedent thereto, the AE shall execute and deliver to the Contracting Officer a release of all claims against the Government arising under or by virtue of this contract, other than such claims, if any, as may be specifically excepted by the AE from the operation of the release in stated amounts to be set forth therein G. PROJECT DOCUMENTATION: Designer shall coordinate with the contractor to gather record copies of submittals, as-built documents, mechanical test and balance reports, maintenance manuals, coordinate owner training sessions, and provide the same to the owner. Upon completion of construction and incorporation of all revisions required to complete the record drawings, the following items shall be submitted: A. 1 set of original reproducible as-built plans (30" X 42") plus a copy on CD-ROM in AUTOCAD Version 2010 format. VIII. CAD REQUIREMENTS: A. DRAWINGS: Full size two-dimensional drawings, electronically submitted. The completed drawing files shall be fully operational in AUTOCAD Version 2010; a PDF copy will additionally be needed. B. DELIVERY FORMAT: Media and archive procedure for transfer of all drawing files to the office of Engineering Project Section shall be CD Read/Write Disk. No "thumb drives" will be accepted. C. NAMING CONVENTIONS: Files will be unique and use a maximum of 8 alphanumeric characters, the file name and extension will be separated by a period. The file layer structure will follow the VA approved standard "CAD LAYER GUIDELINES" Recommended Designations for Architecture, Engineering, and Facility Management Computer-Aided Design as prepared by The Task Force on CAD Layer Guidelines. Place of Performance: VA Medical Center located at 2300 Ramsey Street Fayetteville, NC 28301 Point of Contact: David Bullerwell Contracting Specialist +1 (555) 000-0000 contact@example.gov Evaluation Criteria Qualifications (SF330) submitted by each firm will be reviewed and evaluated based on the following criteria (listed in no particular order of importance) as required by Federal Acquisition Regulation (FAR) Part 36.602-1 and VA Acquisition Regulation (VAAR) Part 836-602-1: 1. Professional Qualifications necessary for satisfactory performance of required services; 2. Specialized Experience and Technical Competence in the type of work required including, where appropriate, experience in electrical, plumbing & mechanical design, experience in healthcare/medical facility design, energy conservation, pollution prevention/waste reduction, LEED and the use of recovered materials, ADA, NFPA 101 Life Safety, Interior Design, and Value Engineering & Life Cycle Cost Analysis; 3. Capacity to Accomplish the Work in the required time; 4. Past Performance: the past performance of the firm on contracts relevant in scope to the advertised project that were accomplished with Government agencies and private industry in terms of cost control, quality of work, and compliance with performance schedules; 5. Location in the general geographical area of the project and knowledge of the locality of the project; provided, that application of this criterion leaves an appropriate number of qualified firms, given the nature and size of the project; 6. Implementation of the Design Quality Control Program and Program Management; 7. Estimating Effectiveness 8. Reputation and standing of the firm and its principal offices with respect to professional performance, general management, and cooperativeness; 9. Record of significant claims against the firm because of improper or incomplete architectural and engineering services; 10. Specific experience and qualifications of personnel proposed for assignment to the project and their record of working together as a team. Submission Requirements Qualified SDVOSB firms are required to submit two (2) hard copies of the SF 330s (which can be downloaded from www.gsa.gov/forms) and Supplemental Information (see Attachment 1), and one (1) CD which contains digital copies of the SF 330s and Supplemental Information. All packages shall be submitted no later than 3:30 PM, EST on March 6, 2013. All submittals must be sent to the attention of David Bullerwell (90C/Contracting), VA Medical Center, 508 Fulton Street, Building 3, Room 105, Durham, NC 27705. The submission must include an insert detailing the following information: 1. Dun & Bradstreet Number; 2. Tax ID Number; 3. The e-mail address and phone number of the Primary Point of Contact and; 4. A copy of the firms VetBiz Registry. The Contracting Officer is not responsible for not receiving submissions due to the offeror misaddressing the package or illegibility of the information. NOTE: Any request for assistance with submission or other procedural matters shall be submitted via email only (contact@example.gov), telephone inquires will not be honored. ATTACHMENT 1 SF 330 Supplemental Information Evaluation Criteria for AE Services Contract In addition to the submission of the SF 330, firms are required to provide the following supplemental information as part of total submission package. Submitting firms are to provide two (2) bound hard copies with tabs and one (1) CD which contain the SF 330s and the following documents. 1. Professional qualifications necessary for satisfactory performance of required services. a) Submission requirements: o Submit personal resumes that best demonstrate the firm's professional qualifications, including specific licenses and registrations relevant to the project requirements. o Complete and submit a summary disclosure for each discipline, principal, project manager, and other support personnel, for up to 10 employees covering disciplines offered, that will handle work for this project. Each resume package may not be longer than two (2) pages in length. b) Basis of Evaluation: o Evaluation of professional qualifications will include but is not limited to the subjective assessment of the firm's individual resumes as required in the sources sought. o Firms unable to demonstrate required qualifications necessary to perform designs may be considered non-responsive. Failure to provide requested data may negatively impact a firm's rating. o Higher ratings for this criterion may be given when the firm's specific personnel demonstrate excellent or very good credentials, above and beyond those usually expected. 2. Specialized Experience and Technical Competence in the type of work required including, where appropriate, experience in electrical, plumbing & mechanical design, experience in healthcare/medical facility design, energy conservation, pollution prevention/waste reduction, LEED and the use of recovered materials, ADA, NFPA 101 Life Safety, Interior Design, and Value Engineering & Life Cycle Cost Analysis. Specialized experience pertains to the types and volume of work previously or currently being performed by a firm that is comparable to the types of work covered by this requirement. a) Submission requirements: o Submit up to three (3) relevant projects, accomplished within the past five (5) years that best demonstrate your relevant experience to the sources sought requirements. Firm is at risk of receiving a lower rating if fewer than three (3) relevant projects are submitted. o Complete and submit a data summary sheet for each project. Each project data package may not be longer than two (2) pages in length and may include verbiage, graphics and photos. o Projects may include Federal, State, or local Government, as well as private industry projects. Firms are responsible for providing project description and applicable experience in sufficient detail to permit evaluation of project relevancy. b) Basis of Evaluation: o Evaluation of specialized experience will include but is not limited to the subjective assessment of the firm's resume of the type of work required in the sources sought. o Firms unable to demonstrate proven competence to perform this type of project may be considered non-responsive. Failure to provide requested data may negatively impact a firm's rating. o Higher ratings for this may be given when a proposal demonstrates project examples of excellent or very good examples of projects relevant to the sources sought. 3. Capacity to accomplish the work in the required time of 300 days. Identify the firm's past and present workload, and convey the understanding of being able to handle all work concurrently and within prescribed deadlines/constraints. a) Submission Requirements o Provide a narrative, (maximum of one 8 ½" x 11" page) that discusses the firm's approach to accomplishing multiple projects with emphasis on meeting prescribed deadlines. b) Basis of Evaluation: o Evaluation of this factor will be a subjective assessment of the firm's ability to clearly demonstrate an understanding of project goals and requirements set for the completion of this project and any additional work within prescribed deadlines. 4. Past performance of the firm on contracts relevant in scope to the advertised project that were accomplished with Government agencies and private industry in terms of cost control, quality of work, and compliance with performance schedules. Past performance relates to how well a firm has performed on substantially completed projects, within the past five years. a) Definitions: o Past performance is a measure of the degree to which a firm satisfied its customers in the past and complied with applicable laws and regulations. o Government agencies are defined as local, state, and federal entities. Higher ratings may be given for work performed on VA Medical Center campuses. o Private industry is defined as non-governmental clients. o The term "substantially complete" shall mean a fully designed project with construction of the facility/project more than 80% complete. b) The sources sought will require the following: o Firms shall have customers complete Past Performance Questionnaires (format to be left up to the firm submitting the SF 330) and submit directly to the Government. o Past Performance Questionnaires shall include specifics for each project submitted, but not be limited to, the following information: o Project description, Contract amount, Dates, and Client information; o Providing a dialogue and a resulting rating for the areas of Quality, Professionalism, Cooperativeness, Problems, Adherence to schedule, Cost control, and Customer satisfaction, and o Answer the question - "Would you award this firm another contract?" o Firms shall have previous clients submit design and construction projects Past Performance Questionnaires that are the same as the projects included in its proposal for Relevant Experience. Ensure correct phone numbers and email addresses are provided for the client point of contact. Failure to provide requested data or to provide an accessible point of contact may negatively impact a firm's rating. NOTE: Past Performance Questionnaires that were completed for previous submissions can be re-used so long as they reference the projects that have been submitted in the firms' proposal for Relevant Experience. o Completed Past Performance Questionnaires are to be emailed or faxed directly to the Government Contracting Officer. In order for the client evaluation to be considered, the Past Performance Questionnaires must be received no later than the due date/time of the SF 330 packages. o The design firm shall have a minimum of three (3) past performance questionnaires submitted by their clients. o Firm to submit Past Performance Questionnaire to clients that: o Are knowledgeable of the firm's past performance. o Are willing to be interviewed by the Government using the past performance questionnaire. o Firms are encouraged to describe problems encountered on projects submitted for past performance and describe the corrective action taken to resolve the issue(s). c) Submission requirements: o Submit up to three (3) relevant projects design complete or substantially construction complete within the past five (5) years and best demonstrates your relevant experience to the sources sought requirements. Firm is at risk of receiving a lower rating if fewer than three (3) relevant projects are submitted. o Questionnaires. Firm is at risk of receiving a lower rating if fewer than three (3) Past Performance Questionnaires are received. d) Basis of Evaluation: o Failure to provide requested data or to provide an accessible point of contact (POC) may negatively impact a firm's rating. o The evaluation of pa...

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS