This Government Contract opportunity from Department Of Veterans Affairs was posted on February 19, 2019. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

C--Replace Electrical Substation AE Project 595-19-101

Awarded
36C24418R0152Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 541330
New
SLED
Engineering And Traffic Surveys Supporting The Town's Speed Limits To Continue Radar Enforcement
Solicitation # 27-004
The Town of Los Gatos, through its Parks and Public Works agency, is soliciting proposals for solicitation number 27-004 to conduct engineering and traffic surveys across 65 designated roadway segments and all existing school zones. The primary objective is to renew the surveys supporting prima facie speed limits to ensure continued legal radar enforcement in compliance with the California Vehicle Code and AB 382. The selected consultant, who must be a California-licensed Professional Engineer qualified in traffic engineering, will perform speed data collection on 31 high-volume segments using radar and 34 low-volume segments using 24-hour mechanical counters. The scope also requires a review of three years of accident history, field checks of each segment, and the delivery of a final engineering report in searchable PDF format containing 85th-percentile speeds and a speed-limit recommendation matrix. The contract is for a one-year term beginning in January 2027 with no option for renewal. Proposers must submit electronic bids by November 27, 2026, and will be evaluated through a two-phase process consisting of a pass/fail responsiveness check followed by a 100-point scoring system based on qualifications, work plan, price, and references. Awardees must maintain significant insurance coverage, including 2 million dollars in general liability, 1 million dollars in automobile liability, and 1 million dollars in professional liability. The agreement includes strict non-discrimination requirements with potential liquidated damages of 100 dollars per day for non-compliance and allows for termination by either party with 15 days written notice. Payment is structured as monthly invoicing with net 30-day terms.
Parks and Public Works

POSTED

about 7 hours ago

DEADLINE

in 29 days
NAICS: 541330
New
SLED
On-Call Structural and Seismic/Disaster Engineering Services
Solicitation # FAS 2026-037
The City of Seattle Finance and Administrative Services Capital Development division is seeking to establish two on-call contracts for professional structural and seismic/disaster engineering services under solicitation FAS 2026-037. The selected consultants will provide technical expertise on an as-needed basis for small to medium projects throughout the planning, design, procurement, and construction phases, utilizing delivery methods such as Design-Bid-Build, Job Order Contracting, and the Small Works Roster. The scope of work includes structural engineering studies, seismic evaluations, confidence testing, fall protection design, and the preparation of construction documents stamped by a licensed engineer. All deliverables must adhere to specific CAD standards, including software compatibility with AutoCAD 2025.1.3 and AIA/US National CAD Standard V5. Eligible firms must be licensed to practice in Washington State and the City of Seattle, demonstrate experience with current code compliance, and provide three relevant projects completed within the last seven years. The contract features an initial one-year term with up to four optional one-year renewals, for a maximum duration of five years. Evaluation of proposals is based on relevant technical experience (40 percent), approach and methodology (30 percent), and an inclusion plan (15 percent) focusing on women and minority-owned businesses. Responses are due by December 2, 2026, via the OpenGov portal, with a target contract execution date of December 15, 2026. Consultants are required to maintain Commercial General Liability insurance and comply with various local and federal regulations, including ADA and City of Seattle labor ordinances.
Finance and Administrative Services

POSTED

about 16 hours ago

DEADLINE

in about 1 month
NAICS: 541330
New
International
R.T. Orr Dam Geotechnical Investigations
Solicitation # 2026-05
The Upper Thames River Conservation Authority is soliciting proposals for geotechnical investigations and assessments of the R.T. Orr Dam located in Stratford, Ontario. The project, which initiates in 2026 and must be substantially completed by March 15, 2027, is based on recommendations from a 2023 Dam Safety Review by D.M. Wills Associates Limited. The scope of work includes reviewing existing structural data, conducting a detailed seepage investigation at the downstream left armour stone retaining wall, performing supplementary field investigations for embankment slope stability, installing two nested monitoring wells in both earth embankments, and updating stability analyses for armour stone structures. All work must adhere to the LRIA Technical Bulletin for Geotechnical Design and Factors of Safety and meet Ontario Accessibility Standards for electronic deliverables. Proposals must be submitted electronically via the bids and tenders platform by 3:00 PM Eastern Daylight Time on November 18, 2026. The selection process utilizes a two-envelope system where technical qualifications in Envelope A are evaluated before the cost proposal in Envelope B is opened. Award decisions are based on best value, considering experience, understanding of the work, proposed methodology, schedule, and cost reasonableness. Selected consultants must provide proof of professional licensing, WSIB standing, and required insurance policies, while maintaining strict confidentiality regarding project information.
Upper Thames River Conservation Authority

POSTED

about 17 hours ago

DEADLINE

in 20 days

AI Contract Overview

Show more

The Department of Veterans Affairs is seeking a qualified Architect/Engineer firm to provide comprehensive design and construction period services for the replacement of an electrical substation at the VA Lebanon campus in Pennsylvania. This project includes the production of technical specifications, working drawings, and cost estimates, as well as the renovation and upgrading of the existing central utility plant, Building 10. Key technical requirements involve repairing exterior walls and windows, upgrading generators and boilers, performing asbestos abatement, and ensuring the facility maintains power throughout construction. The estimated construction magnitude is between 1 million and 5 million dollars, with a design duration of 210 days from the Notice to Proceed. This opportunity is strictly set aside for Service-Disabled Veteran-Owned Small Businesses under NAICS code 541310. Interested firms must be certified by VETbiz and registered in the System for Award Management to be considered. The selection process involves the submission of an SF 330, with evaluations focusing heavily on professional qualifications and specialized experience. The government will interview a minimum of three highly qualified firms before requesting a final proposal for a negotiated Firm-Fixed Price Contract. All designs must comply with VA space planning criteria, physical security standards, and reflect LEED Silver practices.

General Info

Contract Value

$414,004.13

NAICS

541330 - Engineering Services

Place of Performance

PA, USA

Set-Aside

NONE

Award Issued Date

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

3 updates
PhaseAwarded
Posted

Sources Sought

Notice updated

Response deadline changed from Sep 20, 2017 to Jan 9, 2018. The point of contact changed.

Notice updated

Response deadline changed from Jan 9, 2018 to Jan 18, 2018. NAICS code changed from 541310 to 541330. The notice description changed. The point of contact changed.

Notice updated

The notice description changed.

Awarded

Contract was awarded

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Veterans Affairs → 244-NETWORK Contract Office 4 (36C244)
ContactsNo contacts available
OfficePITTSBURGH, PA, 15215, USA
Office AddressPITTSBURGH, PA, 15215, USA
ContactsNo contact information available

Full Description

Show more
Request for SF 330 for Project # 595-19-101 at VA Lebanon, PA This announcement is for the selection of an Architect /Engineer Firm to perform, engineering, design services, produce technical specifications, working drawings, and cost estimates, as-built drawings, and provide construction period services, and site visits for the Construction Project: 595-19-101 Replace Electrical Substation. This announcement is set-aside for firms classified as "Service Disabled Veteran Owned Small Business" under NAICS code 541310 Architectural Services. The magnitude of construction for the above referenced project is between $1,000,000.00 and $5,000,000.00. The estimated duration of design is 210 Days from the issuance of the Notice to Proceed. The contract shall remain active through Construction Period Services. This is not a Request for Proposal and an award will not be made with this announcement. This announcement is a request for SF 330s from qualified firms that meet the professional and set aside requirements listed in this announcement. The proposed services will be obtained by a negotiated Firm-Fixed Price Contract Contract Award Procedure: Before a small business is proposed as a potential contractor, they shall be certified by VETbiz and registered in the System for Award Management (SAM) via internet site at http://www.sam.gov. Failure of a proposed SDVOSB to be certified by the CVE at the time the SF 330 is submitted will result in their elimination from further consideration for award. The government will evaluate the SF330s received and a minimum of the three most highly qualified firms shall be called back for interviews. After interviews, the most highly qualified firm will be requested to submit a proposal. The SF330 must address identified capabilities that are summarized in 1) through 8). The Professional Qualification and Specialized Experience/ Technical Competence factors are slightly more important than the other six factors which are listed in descending order of importance. 1) Professional Qualifications necessary for satisfactory performance of required services: This is intended to evaluate the personal experience of firm members who work in the firm's project office and are scheduled to be assigned to the design team. The key positions should include Project Managers, Quality Assurance Managers, Architectural Design, Civil Engineers, Electrical Engineers, Structural Engineers, Mechanical Engineers, Fire Protection Engineers, and Environmental Engineers. Firms may submit any other personnel they feel are significant for the types of work described in Specialized Experience. 2) Specialized Experience and Technical Competence in the type of work required: This factor evaluates the experience of the firm and design team in completing projects requiring skills similar to those anticipated for this contract. The project will be to provide a full set of construction documents for a project that will install an electric substation adjacent to the existing substation located on the LVAMC campus. Major elements of work included, but not limited to: Coordinate with Met-Ed Electric to determine current electric consumption and trends. Determine capacity requirements needed for new substation to ensure current and future demands will be satisfied Design a new electric substation Extra consideration may be given for experience designing projects for Department of Veterans Affairs Facilities. 3) Past performance on contracts with Government agencies (Particularly Department of Veterans Affairs) and private industry in terms of cost control, quality of work and compliance with performance schedules. Note: Project Past Performance information for projects performed shall be evaluated as either Relevant or Not Relevant. Not Relevant projects shall not be evaluated. 4) Capacity to accomplish the work: this factor evaluates the ability of the A-E firm to, given their current projected workload and the availability of their key personnel, to accomplish the project in the required time. 5) Location: This factor evaluates the distance from the A-E firms design office from the location of work (Lebanon VA Medical Center). The personnel identified as the design team staff are expected to work in the design office identified for evaluation of this factor. 6) Reputation and standing of the firm. 7) Record of significant claims 8) Specific Experience and Qualifications of personnel as a team. . GENERAL SCOPE OF WORK: The Architect / Engineer (A/E) firm shall provide all architectural and engineering services to provide a full set of construction documents that will improve the Replacement of the Electric Substation located on the Lebanon PA campus. Existing Building Overview/Specifics: This project involves renovating/upgrading the existing central utility plant, Building 10. Major elements of work include, but are not limited to the following: repair exterior walls, repair/replace exterior windows and lintels, install a fire department Siamese connection to an external standpipe and appropriate signage, wayfinding and signage upgrade throughout interior, replace/upgrade existing generator to provide emergency power for entire building, replace fan coil units and controls, repair/replace boiler stacks and install economizers, replace underground cooling tank for the boiler bottom blowdown, replace the boilers and boiler control systems, perform asbestos abatement, replace the feed water pumps and Variable Frequency Drives (VFD), replace condensate pumps and install VFDs, replace facility wiring (e.g. wires, conduit, panels, breakers, etc.) where necessary, replace piping and insulation where necessary, replace deaerator tank, repair/replace the building roof, perform structural modifications needed to install/remove boilers, replace all exterior windows and doors (some windows to be replaced by remotely operated louvers), repair/replace façade where necessary, replace deteriorated piping, valves and appurtenances throughout where necessary, remove remaining steam piping from old absorption chiller supply and install blank where supply line connects to steam header, construct new office and breakroom above locker room/existing offices, combine operator control station and existing office/breakroom, switch boiler water level control from pneumatic to electronic, seal/paint all floors with epoxy. Provide new finishes throughout interior. Perform life safety analysis and modify as necessary. Services: Provide professional Architect/Engineer services to include: Site investigation - Architectural, Structural, Mechanical, Electric, Plumbing, site surveys, etc. Construction drawings and specifications 3rd Party Cost estimates Estimate of expected construction cost at the end of each phase. Construction period services - review of submissions, provide recommendations regarding contractor change proposals, visit site per VA's request and add to drawings as-built conditions from contractor's record drawings and VA correspondence during construction. A/E shall review all construction change orders and provide an independent cost estimate on each change order request. A/E shall respond on site within a two-hour period when requested and shall provide 15 site visits as requested during construction. Infection Control Risk Assessment (ICRA) including a drawing and specification A pre-construction risk assessment. (PCRA) (Attachment G). Requirements: All designs shall be compliant with the following: All designs shall be compliant with space criteria referenced in VA space planning criteria: http://www.cfm.va.gov/til/space.asp Volume 1 Steam, Heating Hot Water, and Outside Distribution Systems Design Manual https://www.cfm.va.gov/til/dmanual/dmsm01.pdf Volume 2 Steam, Heating Hot Water, and Outside Distribution Systems Design Manual https://www.cfm.va.gov/til/dmanual/dmsm02.pdf ASME International Boiler and Pressure Vessel Codes Ensure patient privacy criteria are met (i.e. computerized information, patient privacy, HIPPA). The design shall meet all VA Physical Security Standards. The area in this design is considered Mission Critical and the appropriate guide shall be followed. If a section of the manual cannot be met, the A/E shall notify the VA immediately, and assist the VA in the security waiver process. The Physical Security Guidelines can be found at this link: http://www.cfm.va.gov/til/spclRqmts.asp#PHS Design and construction work shall be coordinated with other construction projects on-going at the hospital. A list of current projects will be provided upon approval of the 35% submission. This project shall be done so that power to the hospital is maintained throughout construction and installation. A phasing plan must be submitted at the 35% submission. Phasing must work within budget and allow the VA to continue operations at minimal interference. The A/E shall build activation time into the construction schedule and documents. A/E shall use most current healthcare delivery processes, and the VA design criteria as a guide. The direction that fits the situation the best will be used in the design. If shutdowns are required during construction, a full shutdown plan shall be included in the design. Shutdowns plan shall include what particular energy source to shut off (breaker, valve, etc.) and what area, outlets, utilities and/or equipment the shutdown affects. The specific name of the shut off of the energy source shall be identified, for example: panel H1L1, breaker 2 for electric or Valve 3-f for a water source, etc. Drawings and a written narrative shall be required. A LEED Silver Rating is desired with the construction. A rating will not be sought, but practices will reflect LEED Silver requirements. Proof of possible LEED credits shall be provided. Bid Alternates/Deducts shall be designed into the project to decrease the price of the project 20%. A/E shall be responsible for providing certified industrial hygiene services to perform asbestos survey investigations, bulk sampling, development of specifications and drawings, and construction period services. All designs shall be accomplished in accordance with VA guidelines and specifications, and program guides PG-18-1 thru PG-18-17, which are available on the Internet at http://www.cfm.va.gov/til/. A/E shall pay particular attention to OSHA, NFPA, BOCA, EPA and VA guidance, and VA space criteria - http://www.cfm.va.gov/til/space.asp SPECIAL NOTE: Be reminded that the VA guidelines are just a guide, and the project is not bound by them. If current healthcare trends dictate a different design approach is needed, we will follow that approach. A/E shall be responsible for providing all services necessary for design of this project i.e. structural, industrial hygiene, mechanical, electrical, etc. TIME SCHEDULE DESIGN REVIEW AND SUBMITTAL REQUIREMENTS: This is a summary and specifies documents and contents required to be submitted by the A/E consultant to the Department of Veterans Affairs (VA) for each scheduled review and the each submission. The A/E shall provide completed bid documents within 210 days of Initial Project Design team (PDT) meeting. EXPECTATION: Required to submit review package so they are received on the day indicated after Notice to Proceed (NTP) or concurrence from Project manager and Contracting Officer. Initial Project Design Team (PDT) meeting Schematic Submission Design Development 35% Design Construction Documents 1 - 65% Design Construction Documents 2 - 95% Design Bid documents (4 Sets of Drawings and specifications shall be furnished by the A/E) Additional detailed information will be included for A/E firm chosen to submit a proposal. Note: The issue of the Notice To Proceed (NTP) will be the first PDT Meeting. A/E shall attend and take minutes of each PDT Meetings. Minutes shall be submitted electronically to the Project Manager and Contracting Officer within three calendar days of each meeting. CONSTRUCTION PERIOD SERVICE REQUIREMENTS: Review of Contractor's and Sub Contractor s Qualifications: Assist the VA to determine whether the contractor or subcontractor meets qualification requirements, support by written recommendations of any problems or litigation encountered in past based on first-hand knowledge. Review of Submittals: Review all submissions and provide recommendations to the VA within five calendar days upon request. Review of Change Order Requests and Requests for Information (RFI): Review contractor's cost estimates and provide recommendations to the VA. Review contractor's cost estimates and provide recommendations to the VA Site Visits: The A/E shall make 15 site visits on requests of the VA and prepare written reports that shall include agreed upon changed in design as determined necessary during the construction. Visits made based on errors and omissions in design shall be at no cost to the VA. (Please include price for additional site visits should they be desired by the COR). Written meeting minutes and recommendations shall be provided to the VA by the COB (Close of Business) on the following workday. E-mail copies of digital photographs from site visits when requested by the COR. Punch List: Participate in partial/final acceptance inspections as scheduled and generate punch list items for completion. "As-Built" Document Requirements: Prepare as-built drawings on original set with A/E s stamp, based on record drawings that the contractor kept during construction and with correspondence performed during construction. Transpose contractor s as-builts to AutoCAD 2000 and provide a set of updated as-builts and specifications on CD within 30 days to the COR. SUBMITTAL REQUIREMENT: Who May Submit: This project is set aside for FAR 852.219-10, Notice of Total Service-Disabled Veteran-Owned Small Business Set-Aside (Dec 2009). The NAICS for this project is 541310 Architectural Services. Where to Submit: Interested firms shall submit one (1) hard copy of the SF330 and one (1) copy on CD or DVD-R (NO USB FORMAT ACCEPTED) to: Butler VA Medical Center, 325 New Castle Road Butler, PA 16001 ATTN: Contracting (Jeffrey Zbezinski) contact@example.gov AND In addition the interested firms shall submit three (3) hard copies of the SF330 and one (1) copy on CD or DVD-R (NO USB FORMAT ACCEPTED) to Lebanon VA Medical Center 1700 South Lincoln Avenue Lebanon, PA 17042 ATTN: Facilities Engineering Service (Jon Schaeffer) contact@example.gov All SF 330s shall be clearly marked with the subject line displaying the solicitation number. 36C24418R0152 Replace Electrical Substation Project# 595-19-101 All A/E firms interested in submitting an SF 330 must comply with the information listed below: (i) Interested firms having the capabilities to perform this work shall submit to be considered for this contract shall submit hard copies of their Standard Form 330 (Parts I & II) and a CD copies of their Standard Form 330 (Parts I & II) to addresses listed above not later than 2:00 p.m. (Eastern Daylight Time) on the response date in announcement. (ii) Late proposal rules found in FAR 15.208 will be followed for late submittals. The A-E shall not include company literature with the SF 330. Personal visits to discuss this announcement will not be allowed. SOLICITATION: A solicitation will only be issued to the most highly qualified firm. The Point of Contact: Contracting Jeffrey Zbezinski, +1 (555) 000-0000 E-mail any questions to Jeffrey. contact@example.gov End of Document

More opportunities from Department Of Veterans Affairs → 244-NETWORK Contract Office 4 (36C244)

Same awarding agency

NAICS: 561730
New
Federal
S218--Snow Removal Services Wilmington VAMC
Solicitation # 36C24427Q0O12
Solicitation 36C24427Q0012 is a combined synopsis and request for quote for snow removal and deicing services at the Wilmington VAMC in Delaware. This is a five-year Indefinite Delivery/Indefinite Quantity (IDIQ) contract with an anticipated period of performance from December 1, 2026, through November 30, 2031. The contract has a minimum guarantee of 5,000 dollars and an estimated maximum value of 500,000 dollars, with funds obligated via individual task orders. The procurement is a total set-aside for certified Service-Disabled Veteran-Owned Small Businesses (SDVOSB) under NAICS code 561730. The scope of work includes clearing all levels of a multi-level parking garage, stairwells, entrances, and exposed ramps, with a requirement that all areas be cleared by 6:00 AM EST following overnight snowfall. Specific chemical restrictions are in place, prohibiting rock salt in the garage and requiring the use of garage-friendly chemicals such as sodium acetate, potassium acetate, or calcium magnesium acetate. The contractor must provide an on-site supervisor for every operation and ensure personnel wear OSHA-required PPE and high-visibility vests. Performance will be evaluated based on a Quality Assurance Surveillance Plan, and the award will be based on a comparative evaluation of technical capability and past performance, as well as price. Offerors must be registered in the System for Award Management and submit their quotes via email to the designated contract specialist. Submissions must include a technical document not exceeding 20 pages, firm fixed pricing for all line items, and three examples of past performance for similarly scoped work. Invoices are to be submitted electronically in arrears upon job completion and are due within 30 days. Compliance with applicable wage and hour laws and limitations on subcontracting are mandatory for the prime contractor.
Landscaping Services

POSTED

2 days ago

DEADLINE

in 4 days
View Details
NAICS: 811210
New
Federal
J065--Notice of Intent to Sole Source Maintenance of Alaris Infusion Pumps
Solicitation # 36C24427Q0040
The Department of Veterans Affairs has issued a notice of intent for a single, Firm-Fixed Price contract to provide annual maintenance and support services for the Alaris System software and components at the Butler Healthcare Care Center in Butler, Pennsylvania. The primary objective is to secure a post-warranty, full maintenance agreement for the Guardrails software package and to update the network configuration by adding a new range of IP addresses via the VA Altoona server. The period of performance consists of a one-year base period after receipt of order, with four additional one-year option periods available at the government's discretion. The scope of work includes the installation of the latest software versions for Guardrails Suite MX and Alaris Systems Manager, as well as comprehensive technical support and clinical services. Key deliverables include quarterly infusion analytics reports, technical telephone support, monthly web-based training, and annual on-site visits from both technical service and RN clinical consultants. The contractor must ensure compliance with Federal Information Processing Standards (FIPS) 140-2 for the Alaris Packet Control Unit wireless module and adhere to BD's federal terms and conditions. Financial administration will be handled through monthly invoicing for maintenance and support fees.
Electronic and Precision Equipment Repair and Maintenance

POSTED

2 days ago

DEADLINE

in 4 days
View Details
NAICS: 236220
New
Federal
Z1DA--642-22-104 | Upgrade Substation Building 2 Phase 1 for Philadelphia VAMC
Solicitation # 36C24426R0088
Solicitation 36C24426R0088 is a firm fixed price request for proposal issued by the Department of Veterans Affairs for the Upgrade Substation Building 2 Phase 1 project at the Corporal Michael J. Crescenz Medical Center in Philadelphia, Pennsylvania. This project is a 100 percent set-aside for Service-Disabled Veteran-Owned Small Businesses under NAICS code 236220, with an estimated value between 5 million and 10 million dollars. The primary objective is to replace two 29 year old electrical substations with new 480/277V substations, each featuring a 1500 kVA transformer, to increase electrical capacity for current and future facility needs. To ensure continuous medical center operations and minimize service outages, the contractor must install a temporary 480/277V substation with a 1500 kVA transformer, which will remain on site as a spare upon project completion. The period of performance has been extended to 1,000 calendar days from the Notice to Proceed. Proposals are due by November 20, 2026, at 4:00 PM EST and must be submitted in separate administrative/price and technical volumes. Award will be based on a Best Value Tradeoff evaluation focusing on technical approach, past performance in occupied hospitals, key personnel qualifications, safety and risk management, quality control, and procurement strategy. Key requirements include strict adherence to Infection Control Risk Assessment protocols, the provision of 100 percent performance and payment bonds, and compliance with the Davis-Bacon Act and Buy American requirements.
Commercial and Institutional Building Construction

POSTED

2 days ago

DEADLINE

in 22 days
View Details
NAICS: 236220
New
Federal
Z2DA--FY26 NRM 460-20-004 | Tuckpointing FY26 | NCO 4 Construction East (VA-26-00060656)
Solicitation # 36C24426B0018
Solicitation 36C24426B0018 is an Invitation for Bid issued by the Department of Veterans Affairs Network Contracting Office 4 for professional tuckpointing and masonry repair services at the Wilmington VA Medical Center in Delaware. This project is a 100% set-aside for Service-Disabled Veteran-Owned Small Businesses (SDVOSB) under NAICS code 236220. The scope of work involves the repair, replacement, and rework of deteriorated exterior masonry and caulking systems across ten buildings on the campus while the medical center remains fully operational. The estimated magnitude of construction is between 2,000,000 and 5,000,000 dollars, with a required period of performance of 270 calendar days from the Notice to Proceed. The contract will be awarded to the responsive and responsible bidder offering the lowest price. Bidders must provide a bid guarantee and are required to submit unit prices for repointing per linear foot and individual brick replacement. Key compliance requirements include adherence to the Davis-Bacon Act, the Buy American Act, and ADA standards, as well as the submission of a site-specific safety plan and performance and payment bonds. The government will conduct pre-final and final acceptance inspections to verify that all work meets federal, state, and local codes and VA specifications. Payment will be processed electronically through the VA Electronic Invoice Presentment and Payment System.
Commercial and Institutional Building Construction

POSTED

2 days ago

DEADLINE

in 7 days
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS