Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Government Contract opportunity from Department Of Veterans Affairs was posted on June 13, 2018. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

C--Replace Steam & Condensate System - Oval 1 and Outlying Branches, Project No. 542-18-104

Awarded
36C24418R0052Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 541330
New
SLED
Engineering And Traffic Surveys Supporting The Town's Speed Limits To Continue Radar Enforcement
Solicitation # 27-004
The Town of Los Gatos, through its Parks and Public Works agency, is soliciting proposals for solicitation number 27-004 to conduct engineering and traffic surveys across 65 designated roadway segments and all existing school zones. The primary objective is to renew the surveys supporting prima facie speed limits to ensure continued legal radar enforcement in compliance with the California Vehicle Code and AB 382. The selected consultant, who must be a California-licensed Professional Engineer qualified in traffic engineering, will perform speed data collection on 31 high-volume segments using radar and 34 low-volume segments using 24-hour mechanical counters. The scope also requires a review of three years of accident history, field checks of each segment, and the delivery of a final engineering report in searchable PDF format containing 85th-percentile speeds and a speed-limit recommendation matrix. The contract is for a one-year term beginning in January 2027 with no option for renewal. Proposers must submit electronic bids by November 27, 2026, and will be evaluated through a two-phase process consisting of a pass/fail responsiveness check followed by a 100-point scoring system based on qualifications, work plan, price, and references. Awardees must maintain significant insurance coverage, including 2 million dollars in general liability, 1 million dollars in automobile liability, and 1 million dollars in professional liability. The agreement includes strict non-discrimination requirements with potential liquidated damages of 100 dollars per day for non-compliance and allows for termination by either party with 15 days written notice. Payment is structured as monthly invoicing with net 30-day terms.
Parks and Public Works

POSTED

about 7 hours ago

DEADLINE

in 29 days
NAICS: 541330
New
SLED
On-Call Structural and Seismic/Disaster Engineering Services
Solicitation # FAS 2026-037
The City of Seattle Finance and Administrative Services Capital Development division is seeking to establish two on-call contracts for professional structural and seismic/disaster engineering services under solicitation FAS 2026-037. The selected consultants will provide technical expertise on an as-needed basis for small to medium projects throughout the planning, design, procurement, and construction phases, utilizing delivery methods such as Design-Bid-Build, Job Order Contracting, and the Small Works Roster. The scope of work includes structural engineering studies, seismic evaluations, confidence testing, fall protection design, and the preparation of construction documents stamped by a licensed engineer. All deliverables must adhere to specific CAD standards, including software compatibility with AutoCAD 2025.1.3 and AIA/US National CAD Standard V5. Eligible firms must be licensed to practice in Washington State and the City of Seattle, demonstrate experience with current code compliance, and provide three relevant projects completed within the last seven years. The contract features an initial one-year term with up to four optional one-year renewals, for a maximum duration of five years. Evaluation of proposals is based on relevant technical experience (40 percent), approach and methodology (30 percent), and an inclusion plan (15 percent) focusing on women and minority-owned businesses. Responses are due by December 2, 2026, via the OpenGov portal, with a target contract execution date of December 15, 2026. Consultants are required to maintain Commercial General Liability insurance and comply with various local and federal regulations, including ADA and City of Seattle labor ordinances.
Finance and Administrative Services

POSTED

about 16 hours ago

DEADLINE

in about 1 month
NAICS: 541330
New
International
R.T. Orr Dam Geotechnical Investigations
Solicitation # 2026-05
The Upper Thames River Conservation Authority is soliciting proposals for geotechnical investigations and assessments of the R.T. Orr Dam located in Stratford, Ontario. The project, which initiates in 2026 and must be substantially completed by March 15, 2027, is based on recommendations from a 2023 Dam Safety Review by D.M. Wills Associates Limited. The scope of work includes reviewing existing structural data, conducting a detailed seepage investigation at the downstream left armour stone retaining wall, performing supplementary field investigations for embankment slope stability, installing two nested monitoring wells in both earth embankments, and updating stability analyses for armour stone structures. All work must adhere to the LRIA Technical Bulletin for Geotechnical Design and Factors of Safety and meet Ontario Accessibility Standards for electronic deliverables. Proposals must be submitted electronically via the bids and tenders platform by 3:00 PM Eastern Daylight Time on November 18, 2026. The selection process utilizes a two-envelope system where technical qualifications in Envelope A are evaluated before the cost proposal in Envelope B is opened. Award decisions are based on best value, considering experience, understanding of the work, proposed methodology, schedule, and cost reasonableness. Selected consultants must provide proof of professional licensing, WSIB standing, and required insurance policies, while maintaining strict confidentiality regarding project information.
Upper Thames River Conservation Authority

POSTED

about 17 hours ago

DEADLINE

in 20 days

General Info

Contract Value

$818,996

NAICS

541330 - Engineering Services

Place of Performance

PA

Set-Aside

NONE

Award Issued Date

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

PhaseAwarded
Posted

Presolicitation

Awarded

Contract was awarded

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Veterans Affairs → 244-NETWORK Contract Office 4 (36C244)
ContactsNo contacts available
OfficePITTSBURGH, PA, 15215, USA
Office AddressPITTSBURGH, PA, 15215, USA
ContactsNo contact information available

Full Description

Show more
Page 7 of 8 ACQUISITION INFORMATION: The VA Medical Center (CVAMC) in Coatesville, PA is seeking professional Architect and Engineering (A/E) services for Project No. 542-18-104, Replace Steam & Condensate System Oval 1 & Outlying Buildings. This announcement is being issued in accordance with the Selection of Architects and Engineering firms (Public Law 92-582) and implemented in the Federal Acquisitions Regulations (FAR) Part 36. Architectural and Engineering (A/E) firms permitted by law to practice the professions of architecture or engineering are requested to send two copies of an SF 330 (8/2016 Edition) and CD from qualified and eligible firms classified as 100% SERVICE DISABLED VETERAN OWNED SMALL BUSINESS CONCERNS. Firms will be selected for negotiation based on demonstrated competence and qualifications for the required work. This is not a Request for Proposal and an award will not be made with this announcement. This announcement is a request for SF 330s from qualified firms that meet the professional and set aside requirements listed in this announcement. GENERAL SCOPE OF WORK: The consultant shall provide all architectural and engineering services as defined to accomplish complete contract drawings, specifications, technical reports and cost estimates for the scope of work. Existing Systems Overview: The existing steam system consists of four water-tube boilers (Building 14 Boiler House) generating 110 psig steam and distribution throughout the campus at 60 psig to PRV and steam-to-water converters located in each building. The current boilers were installed in 1968 and the underground steam distribution was replaced in 1979. Various segments have been replaced since. The system distributes approximately 30,000 pounds per hour during the winter to 34 buildings. Existing steam and condensate piping between buildings is run underground. Most of the underground pipes are run between manholes in vitrified clay tile conduit, some of the underground piping runs through buried concrete vaults. The underground steam and condensate generally enter each building in a pit and run under the floor slab to the mechanical service room. Steam traps in manholes are generally not maintained due to limited accessibility and manhole conditions. The original system had vacuum returned condensate, although vacuum return is no longer used and condensate mains are gravity drained back to the boiler plant. The existing steam distribution system has had multiple leaks and is generally considered to be in failing condition. Insulation around underground pipes is largely ineffective due to leaks and groundwater accumulation in manholes and vaults. Many of the steam system heat exchanger and valves are not readily accessible. There are other distribution system problems as well which will be discussed during the A/E site investigation. Scope of Work: This project will comprehensively redesign the entire steam distribution system from the boiler plant to the mechanical service rooms in all Oval 1 and outlying buildings. Underground drip leg locations and pipe pitches must be fully evaluated for efficient condensate evacuation with steam drip stations in more accessible locations. New routing should be considered. The redesign must include relocation of service room equipment, or installation of platforms to facilitate appropriate accessibility. The redesign must also evaluate down-sizing of the system by removing some outlying buildings from the system and reserving those buildings with other means of heating, such as gas-fired boilers or geothermal heat pumps. The goal of the project is to minimize steam and heat losses and to maximize energy savings and long term maintainability. This project will include any associated work necessary to implement the selected corrections. This project must be designed to have minimal downtime during construction and shall be in accordance with the Department of Veterans Affairs (VA) requirements, industry standards and all applicable code requirements. The scope of work includes but is not limited to the following: Sizing calculations of all steam and condensate mains. Reconfiguration of the distribution system where appropriate. Redesign of condensate removal and return systems for effective operation with ease of maintenance. Evaluation of restrictions due to existing underground utilities and structures. Involve a subsurface utility locating service as required. Involve a certified industrial hygienist (CIH) to incorporate the necessary guidance in the construction documents as applicable. Provide submittals and final documents as indicated below. The Following Investigative Work shall also be included Within the Scope of this Project: Perform a Code analysis to insure that the applicable Codes are being applied. Provide any civil, structural, architectural, electrical and mechanical and underground utility investigative work of existing systems necessary to insure the accuracy of your design. Prepare any measured drawings of existing systems or facility required to insure the accuracy of your design. Take digital photos of site major features and connection points. Digital format must be compatible with VA software. VAMC Coatesville photo ID badges are required to be worn by all A/E personnel during all project site visits. Other: Complete review and analysis of contractor's project cost proposals. The A/E shall check Government furnished and/or the Construction Contractor's shop drawings, detail drawings, schedules, descriptive literature and samples, testing labor atory reports, field test data and review the color, texture and suitability of materials for conformity with the design concept and construction documents. The A/E shall recommend approval, disapproval, or other suitable disposition. The A/E shall evaluate the submittals with reference to any companion submittals that constitute a system. When necessary, the A/E shall, through the Contracting Officer's Representative (COR), request the Contractor to submit related components of a system before acting on a single component. The A/E may be required to hold joint reviews with the VA technical staff on complicated system submittals. The A/E shall notify the COR in writing of any and all deviations from the requirements of the construction documents that he has found in the Construction Contractor's submittals. Such responsibility shall be carried out with reasonable promptness as to cause no delay. Site visits as required. Include ten (10 full-day site visits for budget purposes. (Please include the price for additional site visits should they be desired.) Reproduction costs - The cost of reproducing contract documents (drawings and specifications) and delivery to the VA Contracting Officer. Specifications should be spiral-bound (as made by GPC) with a clear plastic front cover and a back cover. Infection Control: The "Pre-Construction Risk Assessment (PCRA)", located at the end of this Attachment, shall be completed and incorporated into the final construction documents. The A/E shall update all AutoCAD Drawings to reflect as-built conditions, based upon mark-ups provided by the Contractor. The A/E shall provide to the COR a complete set of mylar as-built drawings and compact disks (CD) of electronic contract documents as described in Article III, CONSTRUCTION PERIOD SERVICE REQUIREMENTS. Drawing Requirements: Submitted drawings must be completed in accordance with VA Design and Construction Procedures. Media submission CD compact disk requirements include: Drawings in AutoCAD 2014 format: font selection limited to "Bold.SHX" and "ROMANS.SHX", menu must be set to "ACAD.MNU" and drawing must be layered and named in accordance with approved VA layering guidelines. II. TIME SCHEDULE REVIEW AND SUBMITTAL REQUIREMENTS: This article specifies documents and contents required to be submitted by the A/E consultant to the Department of Veterans Affairs (VA) for each scheduled review and the due dates for each submission. Available reference materials pertinent to the design and submittal requirements are indicated in Article IV, AVAILABLE REFERENCE MATERIALS. The A/E shall complete the design within 200 days. Refer to the Contract clauses for application of delivery dates. Schematic Documents Review The objective of this submission is to provide the VA with an overview of the A/E design approach, to present any fundamental design options for consideration and selection by the VA, and to insure that the design development of the project is properly focused, aligned with VA requirements and within the scope of the contract. Provide complete sets of documents as outlined and in quantities as required. 50% Construction Documents Review The objective of this submission is to provide the VA with project documents in sufficient detail to evaluate the design, its adherence to the project scope and the A/E's ability to interpret the design criteria and prepare biddable documents. Provide complete sets of documents as outlined and in quantities as required. 95% Construction Documents Review The objective of this submission is to provide the VA with construction documents which are substantially and technically complete, in the proper format, biddable, constructible, coordinated between all disciplines and adhering to the project scope for final review by the VA. Provide complete sets of documents as outlined and in quantities as required. 100% Construction Documents Review The objective of this submission is to for the VA to verify that all previous comments have been properly addressed prior to issuance of final bid documents. (This submission may be waived by the VA if the 95% submission is substantially and technically complete and the VA has confidence that the remaining comments will be effectively addressed by the A/E for the final construction documents submission.) Provide complete sets of documents as outlined and in quantities as required. Final Submission of Construction Documents Provide complete sets of documents as outlined and in quantities as required. Final construction documents are due 10 days after the 100% (or 95% if applicable) design review meeting. III. CONSTRUCTION PERIOD SERVICE REQUIREMENTS. Review of Contractor's Cost Proposal: Review and evaluate cost proposals submitted by selected construction contractor(s) prior to contract award when requested by the Contracting Officer. The A/E shall provide written analysis of the cost proposal(s), specifically citing areas of excess cost (labor, materials, etc.) or omissions of key requirements of the contract. The A/E should reference and compare costs for items as listed in the A/E's final cost estimate. Review of Submittals: The A/E shall review all submittals (material submittals, shop drawings and test reports (if required), etc.) and return them to the Contracting Officer's Representative (COR) within 10 working days, or as otherwise required by the Contract. Review of Change Order Requests and Requests for Information (RFI): The A/E shall respond promptly to all Change Order Requests and Requests for Information as required by the contract. Site Visits: The A/E shall provide up to ten (10) half-days; four (4) hours each Construction Phase site visits including the final inspection when requested by the COR. (Please include price for additional site visits should they be desired by the COR). Written meeting minutes and recommendations shall be provided to the VA by the COB (Close of Business) on the following workday. E-mail copies of digital photographs from site visits when requested by the COR. "As-Built" Document Requirements: Drawings: The A/E shall update all AutoCAD Drawings to reflect as-built conditions, based upon mark-ups provided by the Contractor. The A/E shall provide a complete set of mylar as-built drawings and two compact disks (CD) to the COR, each containing a complete set of as-built drawings in Adobe PDF format and a copy of all of the AutoCAD as-built files with "xrefs" bound and A/E title block information erased per A/E requirements. Specifications: The A/E shall update the complete set of specifications to reflect all changes issued. The A/E shall provide two compact disks (CD) to the COR, each containing this complete set of the final specifications in Adobe PDF format. IV. AVAILABLE REFERENCE MATERIALS: Prints of the station site, utility drawings and building floor plans may or may not be available. The accuracies of these drawings are not guaranteed and shall be used only for general information. Actual conditions must be field verified by the A/E. A/E Submission Instructions for Minor and NRM Construction Program: Program Guide PG-18-15 Volume C, November 2008 available on-line at http://www.cfm.va.gov/contract/aeDesSubReq.asp. Otherwise, navigate as follows: Office of Construction and Facility Management Web Site (http://www.cfm.va.gov/) Contracting and A/E Info (from menu on left side of screen) "A/E Design Submission Requirements" link under "A/E Information" of outline on screen "Volume C - Minor and NRM Projects" link under "Design Submission Instructions (PG-18-15C)" Additionally, the A/E Submission Instructions for Major New Facilities, Additions, & Renovations: Program Guide PG-18-15 Volume B, March 2009 has good information regarding the levels of documentation suitable for each submission. It is available on-line from the same web page. Download from the Technical Information Library (TIL) copies of the Master Construction Specifications list and unedited copies of each specification section applicable to this project as determined by the A/E. The VA unedited master Specifications are available on line from the Technical Information Library at http://www.cfm.va.gov/til/spec.asp. Otherwise navigate as follows: Office of Construction and Facility Management Web Site (http://www.cfm.va.gov/) Tech Info Library (from menu on left side of screen) "PG-18-1 Master Construction Specifications" link under the "VA Standards for Construction by Number" heading near the bottom of the web page Drawing Requirements Overview: Refer to "Topic 02 Drawings" from the VA Program Guide PG-18-3, available on line in the TIL (Technical Information Library) at http://www.cfm.va.gov/TIL/cPro.asp. Otherwise navigate as follows: Office of Construction and Facility Management Web Site (http://www.cfm.va.gov/) Tech Info Library (from menu on left side of screen) "PG-18-3 Design and Construction Procedures" link under the "VA Standards for Construction by Number" heading near the bottom of the web page "Topic 02 Drawings" link from the list on the web page CADD deliverables must conform to the current VHA National CAD Standard Application Guide, available on line at http://www.cfm.va.gov/til/sDetail.asp. Otherwise navigate as follows: Office of Construction and Facility Management Web Site (http://www.cfm.va.gov/) Tech Info Library (from menu on left side of screen) "CAD Standards" link under "PROJECT DOCUMENT REQUIREMENTS" near the bottom of the outline menu at the right side of the screen "VA National CAD Standard Application Guide" link in the first paragraph under "CAD Standards" in the middle of the screen Additionally, the plot style table (NCS.ctb) and the linetype definition file (NCS.lin) associated with the VHA National CAD Standard Application Guide may be accessed by link under "CAD Standards" on the same web page as this Guide. One copy of the legal documents and bidding forms applicable to this project, contact Contracting Officer. Metric Requirements: Construction Subcommittee of the Interagency Council on Metric Policy Metrication Operating Committee. Metric Guide for Federal Construction First Edition. Washington: National Institute of Building Sciences, 1993. Available on line in the TIL (Technical Information Library) at http://www.cfm.va.gov/CFM/TIL/metric/metricGuide.doc. Otherwise navigate as follows: Office of Construction and Facility Management Web Site (http://www.cfm.va.gov/) Tech Info Library (from menu on left side of screen) "Metric" link under "DESIGN CRITERIA Special Requirements" in the outline menu at the right side of the screen "Metric Guide for Federal Construction" link under "Metric" in the middle of the web page Cost Estimates: VA Form HO-18B is available on-line at http://www.cfm.va.gov/cost/cost_ws.doc. Otherwise navigate as follows: Office of Construction and Facility Management (CFM) web site (http://www.cfm.va.gov/) Cost Estimating (from menu on left side of screen) "Cost Estimate Worksheet" link in the middle of the web page Labor Rates: Current Construction Wage Rate Requirements labor rates are available on-line at http://www.access.gpo.gov/davisbacon/index.html. This link can be accessed through the CFM web site as follows: CFM web site (http://www.cfm.va.gov/) Contracting and A/E Info (from menu on left side of screen) "Wage Rate Determination" link under "Construction Document Information" I. Energy, Water Efficiency and Renewable Energy: The A/E shall specify in the construction design specifications the use of the maximum practicable amount of recovered materials consistent with the performance requirements, availability, price reasonableness, and cost-effectiveness. The A/E shall also consider energy conservation, pollution prevention, and waste reduction to the maximum extent practicable in developing the construction design specifications. Energy-consuming products must comply with the following applicable requirements. When acquiring energy-consuming products listed in the ENERGY STAR® Program or Federal Energy Management Program (FEMP): Agencies shall purchase ENERGY STAR® or FEMP-designated products; and For products that consume power in a standby mode and are listed on FEMP s Low Standby Power Devices product listing, agencies shall Purchase items which meet FEMP s standby power wattage recommendation or document the reason for not purchasing such items; or If FEMP has listed a product without a corresponding wattage recommendation, purchase items which use no more than one watt in their standby power consuming mode. When it is impracticable to meet the one watt requirement, agencies shall purchase items with the lowest standby wattage practicable; and Information is available via the Internet about ENERGY STAR® at http://www.energystar.gov/index.cfm?fuseaction=find_a_product.; and FEMP at http://www1.eere.energy.gov/femp/technologies/eep_purchasingspecs.html Page 8 of 8 V. Evaluation Criteria: The A/E selection criteria for this acquisition is listed in descending order of importance. Sub-elements are of equal importance. Team Proposed for this Project Background of personnel Project manager Other Key Personnel Consultants Previous Experience of Proposed Team Project Experience ( Psychiatric Unit, Hospital, VA Medical Center) At least two similar projects in size and scope Proposed Management Plan Design Phase Construction Phase Project Control Techniques planned to control the schedule and cost Personnel responsible for schedule and cost control Estimating Effectiveness a. Ten most recently bid projects Response Time (RFI, Submittals, Change Orders - Percentage in relation to total amount.) Prime Firm Consultants Proposed Design Approach a. Architectural b. Structural c. Environmental d. Electrical e. Plumbing f. Mechanical Miscellaneous Experience and Capabilities Experience in NFPA 70E and 101 Life Safety Code b. Industrial Hygienist I. Contract Award Procedure: Interested A/E firms shall submit two (2) copies of SF330 (8/2016 Edition) and CD with appropriate documentation and information to Elizabeth Morin, Contracting Officer (542/90C), VAMC, Building 19S, 1400 Black Horse Hill Rd., Coatesville, PA 19320 by close of business (4:30 PM, EST), November 22, 2017. A/E firms shall be registered at www.sam.gov and www.vetbiz.gov. If available, please include your firm's VetBiz.gov SDVOSB status verification. Failure of a proposed SDVOSB A/E firm to be certified by the CVE at the time of the SF330 is submitted shall result in elimination from further consideration for award. Following an evaluation of the qualifications and performance data submitted, three or more firms considered to be the most highly qualified firms to provide the type of services required will be chosen for interviews. After interviews, the most highly qualified firm will be issued the solicitation and requested to submit a proposal. The Government will not pay, nor reimburse, any costs associated with responding to this announcement. The Government is under no obligation to award a contract as a result of this announcement. A/E firms will be selected based on demonstrated competence and qualifications for the required work. NAICS 541330 and size standard $15M apply. The award of a Firm Fixed-Price contract is contemplated and is subject to the availability of FY 18 funding. Disclosure of the magnitude of construction project estimate is between $5,000,000 and $10,000,000. (End of Document)

More opportunities from Department Of Veterans Affairs → 244-NETWORK Contract Office 4 (36C244)

Same awarding agency

NAICS: 561730
New
Federal
S218--Snow Removal Services Wilmington VAMC
Solicitation # 36C24427Q0O12
Solicitation 36C24427Q0012 is a combined synopsis and request for quote for snow removal and deicing services at the Wilmington VAMC in Delaware. This is a five-year Indefinite Delivery/Indefinite Quantity (IDIQ) contract with an anticipated period of performance from December 1, 2026, through November 30, 2031. The contract has a minimum guarantee of 5,000 dollars and an estimated maximum value of 500,000 dollars, with funds obligated via individual task orders. The procurement is a total set-aside for certified Service-Disabled Veteran-Owned Small Businesses (SDVOSB) under NAICS code 561730. The scope of work includes clearing all levels of a multi-level parking garage, stairwells, entrances, and exposed ramps, with a requirement that all areas be cleared by 6:00 AM EST following overnight snowfall. Specific chemical restrictions are in place, prohibiting rock salt in the garage and requiring the use of garage-friendly chemicals such as sodium acetate, potassium acetate, or calcium magnesium acetate. The contractor must provide an on-site supervisor for every operation and ensure personnel wear OSHA-required PPE and high-visibility vests. Performance will be evaluated based on a Quality Assurance Surveillance Plan, and the award will be based on a comparative evaluation of technical capability and past performance, as well as price. Offerors must be registered in the System for Award Management and submit their quotes via email to the designated contract specialist. Submissions must include a technical document not exceeding 20 pages, firm fixed pricing for all line items, and three examples of past performance for similarly scoped work. Invoices are to be submitted electronically in arrears upon job completion and are due within 30 days. Compliance with applicable wage and hour laws and limitations on subcontracting are mandatory for the prime contractor.
Landscaping Services

POSTED

2 days ago

DEADLINE

in 4 days
View Details
NAICS: 811210
New
Federal
J065--Notice of Intent to Sole Source Maintenance of Alaris Infusion Pumps
Solicitation # 36C24427Q0040
The Department of Veterans Affairs has issued a notice of intent for a single, Firm-Fixed Price contract to provide annual maintenance and support services for the Alaris System software and components at the Butler Healthcare Care Center in Butler, Pennsylvania. The primary objective is to secure a post-warranty, full maintenance agreement for the Guardrails software package and to update the network configuration by adding a new range of IP addresses via the VA Altoona server. The period of performance consists of a one-year base period after receipt of order, with four additional one-year option periods available at the government's discretion. The scope of work includes the installation of the latest software versions for Guardrails Suite MX and Alaris Systems Manager, as well as comprehensive technical support and clinical services. Key deliverables include quarterly infusion analytics reports, technical telephone support, monthly web-based training, and annual on-site visits from both technical service and RN clinical consultants. The contractor must ensure compliance with Federal Information Processing Standards (FIPS) 140-2 for the Alaris Packet Control Unit wireless module and adhere to BD's federal terms and conditions. Financial administration will be handled through monthly invoicing for maintenance and support fees.
Electronic and Precision Equipment Repair and Maintenance

POSTED

2 days ago

DEADLINE

in 4 days
View Details
NAICS: 236220
New
Federal
Z1DA--642-22-104 | Upgrade Substation Building 2 Phase 1 for Philadelphia VAMC
Solicitation # 36C24426R0088
Solicitation 36C24426R0088 is a firm fixed price request for proposal issued by the Department of Veterans Affairs for the Upgrade Substation Building 2 Phase 1 project at the Corporal Michael J. Crescenz Medical Center in Philadelphia, Pennsylvania. This project is a 100 percent set-aside for Service-Disabled Veteran-Owned Small Businesses under NAICS code 236220, with an estimated value between 5 million and 10 million dollars. The primary objective is to replace two 29 year old electrical substations with new 480/277V substations, each featuring a 1500 kVA transformer, to increase electrical capacity for current and future facility needs. To ensure continuous medical center operations and minimize service outages, the contractor must install a temporary 480/277V substation with a 1500 kVA transformer, which will remain on site as a spare upon project completion. The period of performance has been extended to 1,000 calendar days from the Notice to Proceed. Proposals are due by November 20, 2026, at 4:00 PM EST and must be submitted in separate administrative/price and technical volumes. Award will be based on a Best Value Tradeoff evaluation focusing on technical approach, past performance in occupied hospitals, key personnel qualifications, safety and risk management, quality control, and procurement strategy. Key requirements include strict adherence to Infection Control Risk Assessment protocols, the provision of 100 percent performance and payment bonds, and compliance with the Davis-Bacon Act and Buy American requirements.
Commercial and Institutional Building Construction

POSTED

2 days ago

DEADLINE

in 22 days
View Details
NAICS: 236220
New
Federal
Z2DA--FY26 NRM 460-20-004 | Tuckpointing FY26 | NCO 4 Construction East (VA-26-00060656)
Solicitation # 36C24426B0018
Solicitation 36C24426B0018 is an Invitation for Bid issued by the Department of Veterans Affairs Network Contracting Office 4 for professional tuckpointing and masonry repair services at the Wilmington VA Medical Center in Delaware. This project is a 100% set-aside for Service-Disabled Veteran-Owned Small Businesses (SDVOSB) under NAICS code 236220. The scope of work involves the repair, replacement, and rework of deteriorated exterior masonry and caulking systems across ten buildings on the campus while the medical center remains fully operational. The estimated magnitude of construction is between 2,000,000 and 5,000,000 dollars, with a required period of performance of 270 calendar days from the Notice to Proceed. The contract will be awarded to the responsive and responsible bidder offering the lowest price. Bidders must provide a bid guarantee and are required to submit unit prices for repointing per linear foot and individual brick replacement. Key compliance requirements include adherence to the Davis-Bacon Act, the Buy American Act, and ADA standards, as well as the submission of a site-specific safety plan and performance and payment bonds. The government will conduct pre-final and final acceptance inspections to verify that all work meets federal, state, and local codes and VA specifications. Payment will be processed electronically through the VA Electronic Invoice Presentment and Payment System.
Commercial and Institutional Building Construction

POSTED

2 days ago

DEADLINE

in 7 days
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS