Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Pre-Solicitation opportunity from Department Of Defense was posted on June 7, 2018. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Rpr South Ramp Entrance T39A

Closed
FA500418RD010Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 541330
New
SLED
On-Call Structural and Seismic/Disaster Engineering Services
Solicitation # FAS 2026-037
The City of Seattle Finance and Administrative Services Capital Development division is seeking to establish two on-call contracts for professional structural and seismic/disaster engineering services under solicitation FAS 2026-037. The selected consultants will provide technical expertise on an as-needed basis for small to medium projects throughout the planning, design, procurement, and construction phases, utilizing delivery methods such as Design-Bid-Build, Job Order Contracting, and the Small Works Roster. The scope of work includes structural engineering studies, seismic evaluations, confidence testing, fall protection design, and the preparation of construction documents stamped by a licensed engineer. All deliverables must adhere to specific CAD standards, including software compatibility with AutoCAD 2025.1.3 and AIA/US National CAD Standard V5. Eligible firms must be licensed to practice in Washington State and the City of Seattle, demonstrate experience with current code compliance, and provide three relevant projects completed within the last seven years. The contract features an initial one-year term with up to four optional one-year renewals, for a maximum duration of five years. Evaluation of proposals is based on relevant technical experience (40 percent), approach and methodology (30 percent), and an inclusion plan (15 percent) focusing on women and minority-owned businesses. Responses are due by December 2, 2026, via the OpenGov portal, with a target contract execution date of December 15, 2026. Consultants are required to maintain Commercial General Liability insurance and comply with various local and federal regulations, including ADA and City of Seattle labor ordinances.
Finance and Administrative Services

POSTED

about 15 hours ago

DEADLINE

in about 1 month
NAICS: 541330
New
International
R.T. Orr Dam Geotechnical Investigations
Solicitation # 2026-05
The Upper Thames River Conservation Authority is soliciting proposals for geotechnical investigations and assessments of the R.T. Orr Dam located in Stratford, Ontario. The project, which initiates in 2026 and must be substantially completed by March 15, 2027, is based on recommendations from a 2023 Dam Safety Review by D.M. Wills Associates Limited. The scope of work includes reviewing existing structural data, conducting a detailed seepage investigation at the downstream left armour stone retaining wall, performing supplementary field investigations for embankment slope stability, installing two nested monitoring wells in both earth embankments, and updating stability analyses for armour stone structures. All work must adhere to the LRIA Technical Bulletin for Geotechnical Design and Factors of Safety and meet Ontario Accessibility Standards for electronic deliverables. Proposals must be submitted electronically via the bids and tenders platform by 3:00 PM Eastern Daylight Time on November 18, 2026. The selection process utilizes a two-envelope system where technical qualifications in Envelope A are evaluated before the cost proposal in Envelope B is opened. Award decisions are based on best value, considering experience, understanding of the work, proposed methodology, schedule, and cost reasonableness. Selected consultants must provide proof of professional licensing, WSIB standing, and required insurance policies, while maintaining strict confidentiality regarding project information.
Upper Thames River Conservation Authority

POSTED

about 16 hours ago

DEADLINE

in 20 days
NAICS: 541330
New
SLED
Oso Parkway/Pacific Park Drive/Glenwood Drive Regional Traffic Signal Synchronization Project
Solicitation # 20261026016
The City of Aliso Viejo is soliciting proposals for a professional licensed consultant to provide regional traffic signal synchronization services for the Oso Parkway, Pacific Park Drive, and Glenwood Drive corridor. The project involves coordinating traffic signals across multiple jurisdictions, including the Cities of Aliso Viejo, Laguna Hills, Mission Viejo, Laguna Niguel, the County of Orange, and Caltrans, extending from Moulton Parkway to the SR-241 Northbound On-Ramp. The projected period of performance is from April 1, 2027, to September 30, 2030. The selected consultant will be responsible for providing all necessary labor, materials, and equipment to implement optimized signal timing in accordance with the Regional Traffic Signal Synchronization Master Plan and the City's Local Signal Synchronization Plan. Proposals are due by December 2, 2026, and must be submitted as one hard copy and one electronic PDF on a USB drive, with the cost proposal in a separate sealed envelope. Award decisions will be based on a weighted evaluation of the consultant's ability and skills, character and reputation, cost reasonableness, ability to meet time requirements, financial resources, and previous experience with the vendor. The contract is governed by the laws of the State of California with venue in Orange County. Key requirements include compliance with California prevailing wage laws, adherence to the City's Minority Business Enterprise program, and the submission of annual political contribution disclosures.
City of Aliso Viejo

POSTED

about 17 hours ago

DEADLINE

in about 1 month

General Info

NAICS

541330 - Engineering Services

Place of Performance

EIELSON AFB, AK, 99702, USA

Set-Aside

SBA

Documents

6

Evaluation Factors - FTQW 07-2014 Repair South Ramp Entrance Taxiway T39A

PDF, High priority: read this firstspecifications
High

FTQW 17-2014 Attachment 1 Instructions to Offerors

PDF, High priority: read this firstinstructions-to-offerors
High

SOW FTQW 17-2014 - Repair South Ramp Entrance Taxiway T39A

PDF, High priority: read this firstsow
High

Standard Form 330 (SF330) - Architect-Engineer Qualifications

PDF, High priority: read this first14 pages · past-performance
High

AMRDEC SAFE Getting Started Guide

PDF, Low priorityother
Low

Repair South Ramp Entrance Taxiway T39A (B8021) - Past Performance Questionnaire

PDF, Low prioritypast-performance
Low

AI Contract Breakdown

Uniform Contract Format

Contract not broken down yet

CLEATUS splits the solicitation into Uniform Contract Format (UCF) sections: scope, pricing, deliverables, and evaluation criteria.

Timeline

PhaseClosed
Posted

Presolicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → FA5004 354 Cons Pk
Contacts2 people available
OfficeEIELSON AFB, AK, 99702-2200, USA
Office AddressEIELSON AFB, AK, 99702-2200, USA
Contacts
Sonia O RiveraContracting Specialist
Tanya L. GutkaContracting Officer

Full Description

Show more
ARCHITECT-ENGINEERING (A-E) SERVICES AT EIELSON AFB, AK. "Notice to Offeror(s)/Supplier(s): Funds are not presently available for this effort. No award will be made under this solicitation until funds are available. The Government reserves the right to cancel this solicitation, either before or after the closing date for receipt of proposals. In the event the Government cancels this solicitation, the Government has no obligation to reimburse an offeror for any costs." The 354th Contracting Squadron is seeking qualification packages and past performance information from vendors interested in providing professional architect and engineering services at Eielson AFB, AK to design the repair of the South Ramp Entrance Taxiway T39A (B8021). BACKGROUND: Eielson Air Force Base (EAFB) is located approximately 23 miles southeast of Fairbanks, AK. Due to the nature of the airfield operations, it is assumed there is a high risk of contaminated soil, of soil sit SS086 (DRO, GRO, Benzene, PFOS PFOA). The AC pavement was constructed for the inbound/outbound traffic for the adjacent South Ramp, which is an apron used for heavy aircraft year round. It is a loop taxiway with one entrance to Taxiway Echo, with two connections into South Ramp, with one for inbound and the other outbound. The AC shows many significant stresses due to arctic conditions and possibly poor construction. It therefore shows thermal cracking, longitude/transverse/block cracking and significant pavement movement. There are many areas where fine sediment, water/ice, and other debris has penetrated to the base course, possibly lower. This is a competitive selection process in which competing offerors' qualifications will be evaluated in accordance with (IAW) FAR Part 36.6 to determine the most highly qualified firms. The Government intends to award one Firm Fixed- Price contract. This is a competitive selection process in which competing offerors' qualifications will be evaluated in accordance with (IAW) FAR Part 36.6 to determine the most highly qualified firms. The Government intends to award one Firm Fixed-Price contract. IAW FAR 36.603(b): To be considered for architect-engineer contracts, a firm must file with the appropriate office or board the Standard Form 330, "Architect-Engineer Qualifications," Part II and when applicable, SF 330, Part I. Responders are advised that the Government will not pay for any information or administrative costs incurred in response to this posting; all costs associated with responding will be solely at the interested parties' expense. Failure to respond to this post does not preclude participation in the subsequent technical evaluation so long as a firm's SF 330 is currently on file with the 354th Contracting Squadron. It is the responsibility of the potential offerors to monitor these sites for additional information pertaining to this requirement. This acquisition will be solicited as a 100% Small Business Set-Aside. The NAICS 541330 (Engineering Services) applies to this acquisition, with a small business size standard of $15M The Disclosure of Magnitude for the subsequent construction project is between $5,000,000 and $10,000,000 IAW FAR 36.204(g). The work to be performed shall include but is not limited to: 1. Attending a pre-investigation meeting 2. Investigating site conditions, options, etc. 3. Collecting and reviewing project data and records 4. Developing design concepts and cost estimates 5. Submitting an investigation report 6. Attending review meetings 7. Making the revisions requested by the Government 8. Submitting intermediate design documents 9. Producing a complete design (35%, 95%, and 100% submissions) The scope of the investigation and design shall include, but not be limited to the repair by replacement of the AC pavement of the South Ramp Entrance Taxiway at Eielson AFB, AK. A-E EXPERIENCE REQUIREMENTS: A-E's experience shall include that which is commensurate with the requirements specific to the scope of design. The A-E shall demonstrate that they have experienced personnel with Alaska Registrations, and adequate capacity and depth in the following disciplines: Civil Engineer Geotechnical Engineer The A-E shall also demonstrate that they have experienced personnel with certification and adequate capacity and depth in the following disciplines: 1. Project/ Program Management 2. Contaminated Soil 3. Civil Engineer 4. Industrial Hygienist (certified) 5. Cost Estimator The Air Force requires complete and functional designs that are appropriate for the sub-arctic environment of interior Alaska and that meet all applicable Federal, State, Local, Industry, U.S. Air Force and Eielson AFB requirements. The A-E shall be responsible for all travel and lodging arrangements and expenses involved in the performance of work under this contract. The A-E shall furnish the Air Force with complete and usable products to include: planning documents, investigative reports, study reports, design analyses, project drawings, technical provisions (specifications), equipment layouts, cost estimates, submittal registers, quality assurance plans, constructability review reports, construction bidding amendments, construction contract modifications, and other documents. QUESTIONS: All questions regarding this synopsis must be submitted in writing no later than 21 June 2018. Primary POC email: contact@example.gov Alternate POC email: contact@example.gov The following documents are considered Attachments to this Synopsis/Solicitation: Attachment 1 - Instructions to Offerors Attachment 2 - Evaluation Criteria Attachment 3 - Statement of Work Attachment 4 - SF 330 Attachment 5 - Past Performance Questionnaire Attachment 6 - AMRDEC Guide

More opportunities from Department Of Defense → FA5004 354 Cons Pk

Same awarding agency

NAICS: 811310
Federal
Central Heat and Power Plant (CHPP) Boiler Maintenance and Repair Services
Solicitation # FA500427
The Department of the Air Force, specifically the 354th Fighter Wing at Eielson Air Force Base, Alaska, is conducting market research through a Sources Sought notice to identify qualified contractors for on-call, critical emergency and scheduled maintenance and repair services for the Central Heat and Power Plant. The scope of work involves six coal-fired high-pressure power boilers, consisting of four Springfield Boiler Co. Model 1951 and two Indeck Keystone Energy Model 2013 units. Due to the extreme sub-arctic conditions at the installation, the requirement emphasizes rapid response, requiring a qualified technician to be physically on-site within 24 hours of notification and a Letter of Recommended Repair submitted within one business day following inspection. To be eligible, contractors must hold an active National Board R Stamp Certificate of Authorization and ensure all welding personnel are certified under ASME Section IX. All repairs must be inspected and accepted by a certified State of Alaska Boiler Inspector, with the contractor responsible for both scheduling and funding these inspections. The contractor must provide all necessary tooling, transportation, and equipment, as the government will provide no furnished property. Additionally, personnel must be vetted through the Defense Biometric Identification System and comply with all base HAZMAT and safety regulations. This is an informational notice to determine market capabilities and procurement strategy, and it does not constitute a formal solicitation.
Commercial and Industrial Machinery and Equipment (except Automotive and Electronic) Repair and Maintenance

POSTED

7 days ago

DEADLINE

in 1 day
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS