Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Government Contract opportunity from Department Of Defense was posted on April 15, 2008. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

C--Indefinite Delivery Professional Services Contract forMuli Disciplinary Servie for Southwester Divison Boundaries primarly for Fort Hood TX

Awarded
W9126G-07-R-0090Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 541330
New
SLED
2026 CPRG NCD SOQ
Solicitation # 2026-SOQ-004
The City of Rogers is soliciting Statements of Qualifications (SOQ) under solicitation number 2026-SOQ-004 for Natural Channel Design services to restore approximately 4,200 linear feet of stream in an urban setting. The scope of work includes engineering, plan design, hydrologic and hydraulic modeling, and the procurement of all necessary local, state, and federal regulatory permits, including potential Letter of Map Revision submissions to FEMA. This project is funded by the Climate Pollution Reduction Grant (CPRG) subaward CPRG-NWA-001 and EPA award 02F75801, requiring compliance with EPA nondiscrimination regulations, Title VI of the Civil Rights Act of 1964, and 40 CFR Parts 5 and 7. Key milestones include the completion and approval of construction plans and permit applications by May 1, 2027, with final construction completion targeted for December 31, 2027. Selection is based on a ranking of qualifications rather than price, with the highest-ranked firm invited to negotiate a contract. Evaluation criteria focus on professional staff expertise, past performance, understanding of the scope, and the quality of the work plan. Interested firms must submit a PDF via OpenGov or hard copy to Colt Craig by November 10, 2026. Submissions are limited to 25 pages and must include Standard Form 330 Part II, an Equal Employment Opportunity policy, the Arkansas DFA Illegal Immigrant Contractor Disclosure Form, and EPA certifications regarding debarment and lobbying for contracts exceeding 100,000 dollars. Additionally, firms must maintain active registration in SAM.gov and demonstrate a commitment to DBE goals through six good faith efforts in subcontracting per 40 CFR 33.301.
Community Development

POSTED

about 3 hours ago

DEADLINE

in 12 days
NAICS: 541330
New
International
Pump Optimisation and Aeration Efficiency Analysis
Solicitation # FA2253
Thames Water Utilities Limited is establishing a single-lot, sole-supplier framework agreement under solicitation FA2253 for pump optimisation and aeration efficiency services. The contract focuses on the monitoring, testing, and analysis of pumping and aeration systems across approximately 60 operational sites, encompassing roughly 200 tests during the AMP period. The primary objective is to reduce whole-life costs and improve operational performance through a structured delivery model that includes site identification, efficiency studies, and performance monitoring. The agreement will feature fixed pricing structures based on an agreed rate card and will be managed through key performance indicators to ensure strategic partnership and continuous improvement. The contract is scheduled for an initial three-year term starting May 10, 2027, with potential extensions up to a maximum of eight years, ending May 9, 2035. Eligible suppliers must demonstrate a proven track record of delivering measurable savings and innovation and must have the capacity to operate within London, the Thames Valley, and the Home Counties. Award selection is based on a 50% technical and 50% commercial weighting. The procurement process is a multi-stage procedure requiring a Pre-Selection Questionnaire via SAP Ariba by October 19, 2026, followed by an Invitation to Negotiate stage. Successful providers must also meet stringent insurance requirements, including 15 million pounds for public and products liability and 10 million pounds for professional indemnity.
Thames Water Utilities Limited

POSTED

about 3 hours ago

DEADLINE

N/A
NAICS: 541330
New
SLED
Request for Qualifications - Conn Dam Stability Assessment, Spillway Improvements, and Feasibility Alternatives Study
Solicitation # 2026-RFQL-054
The City of Napa Utilities Department is seeking a qualified consulting team through Request for Qualifications 2026-RFQL-054 to perform a stability assessment, spillway improvements, and a feasibility alternatives study for the Conn Dam. The project is driven by requirements from the California Department of Water Resources Division of Safety of Dams (DSOD), which identified that the existing spillway does not meet current Probable Maximum Flood (PMF) design criteria and raised concerns regarding the long-term geotechnical stability of the dam embankment. The selected consultant will be responsible for conducting comprehensive subsurface explorations, performing static and seismic slope stability evaluations, and recommending alternatives to mitigate spillway deficiencies. Additionally, the scope includes evaluating options to increase reservoir storage capacity to enhance water supply reliability and flood protection, while supporting future U.S. Army Corps of Engineers (USACE) feasibility studies. This procurement follows a Qualifications-Based Selection process per the Brooks Act, where the award is based on technical capability and experience rather than cost. Evaluation is a two-step process consisting of a Statement of Qualifications weighted at 70 percent and optional oral interviews weighted at 30 percent. A critical project milestone is the submission of a comprehensive geotechnical investigation report to the DSOD by December 31, 2028. The contract requires strict adherence to federal and state regulations, including 2 CFR Part 200 Uniform Guidance, the Build America Buy America Act, and various civil rights and accessibility certifications. Statements of Qualifications are due by October 29, 2026, via the City's Opengov procurement portal.
Utilities Department

POSTED

about 4 hours ago

DEADLINE

in about 5 hours

General Info

Contract Value

$0

NAICS

541330 - Engineering Services

Place of Performance

TX

Set-Aside

NONE

Award Issued Date

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

1 update
PhaseAwarded
Posted

Presolicitation

Notice updated

Response deadline changed from Sep 5, 2007 to Oct 11, 2007. The notice title changed. The notice description changed.

Awarded

Contract was awarded

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → W076 Endist Ft Worth
Contacts1 person available
OfficeFORT WORTH, TX, 76102-6124, USA
Office AddressFORT WORTH, TX, 76102-6124, USA
Contacts

Full Description

Show more
PART: U.S.GOVERNMENT PROCUREMENT SUBPART: SERVICES CLASSCOD: C-Architect and Engineering Services - Construction OFFADD: U.S. Army Corps of Engineers, Fort Worth District, P.O. Box 17300, 819 Taylor Street, Attn: CESWF-CT, (MAJ Gerard Henry) Forth Worth, TX 76102-0300 SUBJECT: INDEFINITE DELIVERY FOR MULTIDISCIPLINE DESIGN/PROFESSIONAL SERVICES WITHIN THE SOUTHWESTERN BOUNDARIES, PRIMARILY AT FORT HOOD, TEXAS SOL W9126G-07-R-0090 DUE: (30 days from publish date) 1.0 CONTRACT INFORMATION: a. General. UNRESTRICTED COMPETITION: Up to two (2) contracts may be awarded from this announcement. These indefinite delivery AE design or other related services contracts are being procured in accordance with PL-582 (Brooks A -E Act) and implemented in FAR Part 36.6. Firms will be selected for negotiation based on demonstrated competence and qualifications for the required work. North American Industrial Classification System (NAICS) Code applicable to this project is 541330, Engineering Services, which has a size standard of $4,500,000 in average annual receipts and corresponds to SIC Code 8711. This announcement is open to all businesses regardless of size. Each contract is anticipated to be awarded on or about mid-December 2007 for a total value not to exceed $3 million with a term not to exceed 3 years with a minimum guaranteed amount of $5,000. Before a small business is proposed as a potential subcontractor, they must be registered in the Central Contractor Registration database. Failure of a proposed small business to be registered in CCR at the time of the SF 330s are submitted, will result in their elimination as a proposed subcontractor. The wages and benefits of service employees (see FAR 22.10) performing under th is contract must be at least equal to those determined by the Department of Labor under the Service Contract Act. The proposed services will be obtained by a Negotiated Firm-Fixed Price Contract. Projects outside the primary area of responsibility may be added upon approval of all parties and at the Option of Fort Worth District, Corps of Engineers, Task Orders issued against contracts awarded under this announcement may be by or for other government agencies. To be eligible for contract award, a firm mus t be registered in the DoD Central Contractor Registration (CCR). Register via the CCR Internet site at http://www.ccr.gov or by contacting the DoD Electronic Commerce Information Center at +1 (555) 000-0000. This is considered part of a multiple award alon g with Solicitation No. W9126G-07-R-0091, the Contracting Officer will consider the following factors in deciding which contractor will be selected to negotiate an order: (1) uniquely specialized experience, (2) performance and quality of deliverables und er any current Indefinite Delivery Contracts, (3) current capacity and ability to accomplish the order in the required time, (4) familiarity with design criteria/codes and construction methods used at the locality, and (5) equitable distribution of work am ong the contractors. Price will not be used as a criterion. If a large business is selected for this contract, it must comply with FAR 52.219-9 regarding the requirement for a subcontracting plan on that part of the work it plans to subcontract. The subc ontracting goals for the Fort Worth District which will be considered in the negotiation of this acquisition are: (1) at least 51.2% of a contractors intended subcontract amount be placed with small business (SB); (2) at least 8.8% of a contractors inten ded subcontract amount be placed with small disadvantaged businesses (SDB); (3) at least 7.3% of a contractors intended subcontract amount be placed with women-owned SB (WOSB); (4) at least 1.5% of a contractors intended subcontract amount be placed with service-disabled veteran-owned SB; and (5) at least 3.1% of a contractors intended subcontract amount be placed with HUBZone SB. The plan is not required with this submittal. 2 .0 PROJECT INFORMATION: No specific projects are identified at this time. Projects are received for execution, use of this contract awarded under this announcement will be considered if A-E services are to be utilized. Projects are anticipated to be in support of primarily operations & maintenance and other miscellaneous funded designs but will not be used for major military construction funded designs at Fort Hood Army Reservation as executed by Fort Worth District. Designs may be fully design-build p ackages. The work may involve design, drafting, planning, studies, site investigations, survey for hazardous, toxic or regulated materials, topographic and/or boundary surveys, on site construction surveillance/ contractor submittal review, and subsurface geotechnical investigations/testing. Design projects are expected to include new construction, communication and data design, maintenance/repair or alterations to existing facilities, utility systems and demolition of existing facilities. Work may also i nclude engineering studies or value engineering services. Design considerations also include landscaping, architectural hardware, electronic communications, environmental or EPA regulatory considerations including storm water pollution prevention plans. Project deliverables may include engineering studies, environmental surveys (asbestos, lead based paint, soil, etc.), CADD produced plans, specifications based on UFC guidelines and UFGS, detailed construction cost estimates, design analysis, and weekly st atus reports. All deliverables are required in hard copy and as electronic files on compact disks. All work must be done by or under the direct supervision of licensed professional engineers or architects. Work and deliverables may also include engineer ing studies, environmental studies, reports and recommendations, formulation of facility sustainment programs, CADD produced plans, specifications prepared utilizing Specsintact (Government furnished software). All CAD files used for the creation of the co nstruction documentation plan set will be delivered in AutoCADD (latest version) or MicroStation (latest version) as required and prepared in conformance with the CADD/GIS Technology Center A/E/C CADD Standard Release 2.0 (available at https://tsc.wes.army .mil/products/standards/aec/aecstdweb.asp). The design will be prepared using English system of measurement. Construction cost estimates will be prepared using Corps of Engineers MII Computer Estimating System. Software will be provided by the Government. Building Information Modeling (BIM) software will be utilized during the Design phase and will also be developed for use by the General Contractor and subcontractors during construction. The AE design firm is to use a BIM application certified in the IFC Coordination View (2X2 or better) for Design Development, Design Analysis, Interference Checking, Design Coordination & Review, Specification Coordination, Contract Document Production, Visualization/Renderings, Quantities Take-off/Cost Estimation, Constr uction Data Management, Modifications, RFIs, and Asbuilts. The IFCs provide a standard format for BIM to allow sharing of information between domain and discipline software systems. Design considerations may include landscaping, architectural evaluations, hardware, electronic and communications systems, environmental and EPA regulatory considerations for storm water and site drainage pollution prevention plans, and construction site requirements. The specifications will be produced in SPECSINTACT using Uni fied Facilities Guide Specifications. Responses to design review comments will be provided using Corps of Engineers DR Checks system. All deliverables will be required in hard copy form and electronic files  electronic files may be required to be provided on CD-ROM, DVD, or compact disk. (For more information on Specsintact, M-CACES, electronic advertising process, etc. go to http://www.swf.usace.army.mil//links /e&c/ec-a. 3.0 SELECTION CRITERIA: Selection criteria in descending order of importance are as follows (Criteria (a)-(e) are primary criteria; items (f)-(i) are secondary and are used as tie-breakers among technically equal firms): (a) Specialized Experience and Te chnical Competence (Ensure that all special experience requirements are reflected on appropriate personnel resumes in the SF330. (1) The selected team must demonstrate recent (within the past 5 years)and significant experience in the design of existing fa cilities and utility infrastructure and renovations, paying particular attention to area architecture and conditions, utility systems, landscaping, interior design, service/command and unique requirements, value engineering and environmental issues. (2) F irms must demonstrate the capability to design projects incorporating the latest DoD force Protection/ Anti-Terrorism criteria, UFC codes, and LEED certification criteria. (3) Firms must have personnel with at least three years experience in Fire Protecti on and Life Safety Design that are familiar with the use and application of NFPA codes 70 and 101 and UFC 3-600-01, Design: Fire Protection engineering for facilities, which has replaced MIL-HDBK 1008C. (4) Firm must demonstrate past designs, which comply with Uniform Federal Accessibility Standards(UFAS) and Americans with Disabilities Act (ADA) requirements (5) Firms must demonstrate experience in evaluating contractors submittals and performing construction surveillance. (6) Firms must demonstrate the ability to prepare specifications based on edited (UFGS), and detailed construction cost estimates based on RS Means. (7) Firms must demonstrate the ability to submit drawings in AutoCad , Bentley Microstation and utilizing their respective BIM features utilizing current versions. (8) Firms must demonstrate the ability to provide data files on CD-ROM discs, and create PDF files of specifications, drawings and other documents. (9) All narrative text, including specifications, shall be furnished in Micro station Word and Excel for windows XP format. MS-Access capability or a database which can be imported into MS-Access (XP) is also required; the selected firm may be required to upgrade versions of these and other commonly used programs during the duratio n of the contract. Firms must demonstrate the capability to comply with these requirements. (b) Professional Capabilities: The indefinite Delivery Contract will require for the A-E Contractor (either in-house or through consultant) as a minimum, the foll owing :one project manager, two registered professional civil engineers, two registered structural engineers, two registered architects, one landscape architect, one architectural hardware specialist, one interior designer, one registered electrical engine er, one registered mechanical engineer, one qualified fire protection engineer (A qualified fire protection engineer is defined as an individual meeting one of the following conditions: An engineer having a Bachelor of Science or Master of Science Degree I n fire Protection Engineering from an accredited university engineering program, plus a minimum of 5 year of work experience in fire protection engineering; a registered professional engineer (P.E.) who has passed the fore protection engineering written e xamination administered by the National council of Examiners for Engineers and Surveys (NCEEES); or a registered P.E. in a related engineering discipline with a minimum of 5 years experience, dedicated to fire protection engineering that can be verified wi th documentation), one life safety specialist, one environmental survey personnel (asbestos, mold, lead based paint, soil, etc.), one environmental design personnel (asbestos, mold, lead based paint, soil, etc.), one value engineer, one cost estimator, one registered surveyor and survey crew, and a testing lab (geotech and environmental-asbestos, lead -based paint, soil, etc.). None of the required personnel can be dual disciplined, i.e. a separate employee must be provided for each stated requirement above to meet the number required. Ensure that resumes are provided for each of the required architects, engineers, and other personnel specifically required (Resumes for the surveying crew are not required). Repeat resume page as needed to provide all required resumes. (c) Firms must demonstrate adequate team capacity to design three task orders concurrently meeting all schedules. (d) Knowledge of locality: Firms must demonstrate familiarity with the Central Texas areas and their applicable architecture, building codes, environmental regulations, soil conditions, seismic requirements, and regulatory agencies. (e) Demonstrate past performance with respect to cost control, quality of work, and compliance with performance schedules. The following, item (f) through (i), are secondary criteria: (f) Demonstrate past performance in preparing DoD, preferably Corps of Engineers design-build solicitations a nd full designs thru the Corps of Engineers. (g) Volume of DoD contract awards. In Section H, Part I of the SF 330, firms must show their last 12 months DoD contract awards stated in dollars. (h) In Section H, Part 1 of the SF 330, include a draft de sign quality control (DQC) Plan. It should include a brief presentation of internal controls and procedures that you can use to insure that a quality design is produced. (i) Geographic proximity of firm to Fort hood, TX. 4.0 SUBMITTAL REQUIREMENT: Submittals shall be sent to: US Army Corps of Engineers, Fort Worth District, Attn: MAJ Gerard Henry, 819 Taylor Street, Suite 2A19, Fort Worth, Texas 76102-0300 (P.O. Box 17300). GENERAL INSTRUCTIONS: (a) Interested firms (single firms or joint ventures) having the capabilities to perform this work must submit one copy of the SF 330 (6/2004 Edition), to the above address not later than 2:00 p.m. (Central Time) on the response date indicated above. Late proposal rules foun d in FAR 15.208 will be followed for late submittals. Submission by telephonic facsimile or electronic mail will not be accepted. Personal visits to discuss this announcement will not be allowed; (b) Submit a compiled SF 330, Part I from the prime for th e design team, completed in accordance with the SF 330 instructions and additional instructions herein. It must contain information in sufficient detail to identify the team (prime, other offices of the prime firm and sub-consultants) proposed for the con tract. Do not include company literature with the SF 330; (c) Use no smaller than 10 font type using standard English. Front and back side use of a single page will count as 2 pages. Pages in excess of the maximums listed will not used in evaluation of the selection criteria. Foldouts are not allowed and shall not be considered. SF 330, PART 1 ADDITIONAL INSTRUCTIONS: (a) In Section C, identify the discipline/service to be supplied by each consultant; (b) In Section E, provide brief resumes of the on -staff or sub-consultant employees you intend to use to perform the work. Resumes must be submitted for each employee required to meet the minimums stated above in paragraph 3b; (c) In Section F, a maximum of 10 projects including the prime and sub-consu ltants will be reviewed. Use no more than one page per project; (d) In Section G, block 26, include the firm and location the person is associated with. The names of all individuals included in the resumes in Section E shall be listed in Block G-26 alon g with their firm location and their roles even if example project experience in Block G-28 is not applicable. Also include Team Project Organization Chart indicating how each firm on the proposed team (prime and each subcontractor as identified in part I, Section C) integrates into the composite team; (e) In Section H, provide a narrative to address each of the requirements, including subparagraphs, of items listed in Section 3, Selection Criteria, of this synopsis. When addressing team capabilities, clarify planned capability, existing capability, and prior experiences, if any. Include any other relevant information including a short discussion of why the firm is especially qualified ba sed upon the specific selection criteria listed in Section 3 herein. Under paragraph 3g, above, provide an itemized summary of DOD awards to include Agency, Contract Number/Task Order No., and Project Title and amount. Note that award of Indefinite Deliv ery Contracts should not be counted as award amounts; only actual Task Orders (This information will be used as a primary selection factor for specialized experience and secondary selection factor, volume of award. Generally, describe the firms over all Design Quality Management Plan (DQMP). (A project-specific design quality control plan must be prepared and approved by the Government as a condition of contract award, but is not required with this submission.) Indicate the estimated percentage invo lvement of each firm on the proposed team. Do not exceed 20 pages for Block H. SF 330, PART II ADDITIONAL INSTRUCTIONS: (a) Responding firms must submit a copy of a current and accurate SF 330, Part II for the specific prime, other offices of the prime and subcontractor offices proposed to perform the work even if one is already on file. All Part IIs MUST be signed (signed within the past 12 months) and dated either by an original handwritten signature or a cut and pasted facsimile of an original signa ture. Indicate in Block 5b of each Part II if the firm is a Large Business, Small Business, HUBZone, Service Disabled Veteran-Owned Small Business, or Woman-Owned Small Business. To be classified as a small business, a firms average annual receipts or s ales for the preceding three fiscal years must not exceed $4.5 million; (b) In Block No. 4 Part II, provide the Data Universal Numbering system (DUNS) number issued by Dun and Bradstreet Information System (1/+1 (555) 000-0000) for the prime A-E or Joint Ventur e. The DUNS number must be for the firm or joint venture performing the work (i.e., not the parent company DUNS number, but a DUNS number specifically for the office performing the work. Each branch office and/or joint venture must have their own DUNS nu mber); and (c) Solicitation packages are not provided for A-E contracts and no additional project information will be given to firms during the announcement period. 5.0 Points of Contact: Contracting  MAJ Gerard Henry, +1 (555) 000-0000, Technical  Ron Bradney +1 (555) 000-0000, e-mail your questions to US Army Engineer District, Fort WorthMilitary at: contact@example.gov. This is not a request for proposal .

More opportunities from Department Of Defense → W076 Endist Ft Worth

Same awarding agency

NAICS: 237130
New
Federal
B21 Utilities & Site Improvements, Communications & Electrical Infrastructure, Dyess AFB OT Feasibility & Business Feedback
Solicitation # W9126G27R1CSY
The U.S. Army Corps of Engineers, Fort Worth District, is conducting market research via a Sources Sought notice for the B-21 Utilities and Site Improvements project at Dyess Air Force Base, Texas. This initiative aims to establish high-reliability primary electrical power distribution and dedicated fiber-optic communications infrastructure to support the bed-down of the B-21 weapons system. The scope includes the installation of single-mode fiber optic cables, telephone system expansion, power cabling in concrete encased ducts, pole-mounted conductors, and associated transformers and switchgear. The project also encompasses site improvements such as earthwork, grading, and erosion control. The estimated Construction Cost Limitation is $28,550,000, though an $8 million electric substation and specific end-user network equipment are expressly excluded from this contract. The government is currently evaluating whether to utilize a traditional Federal Acquisition Regulation based contract or an Other Transaction Agreement under 10 U.S.C. section 2808a. If a collaborative procurement framework is chosen, a two-phase selection process will be implemented, focusing first on technical capability, past performance, and collaborative execution history, followed by an evaluation of final technical and price proposals. The project must adhere to strict Department of Defense standards, including UFC 1-200-01 for general building requirements, UFC 4-010-01 for antiterrorism, and UFC 4-010-06 for cybersecurity of facility-related control systems. The anticipated period of performance is 690 calendar days from the notice to proceed, with a required beneficial occupancy date of March 8, 2030.
Power and Communication Line and Related Structures Construction

POSTED

about 6 hours ago

DEADLINE

in 14 days
View Details
NAICS: 561720
New
Federal
Janitorial Contract Eagle Pass, TX
Solicitation # W9126G27QA003
Solicitation W9126G27QA003 is a combined synopsis and request for quotes for commercial janitorial services for a Department of Defense administrative office located at 140 N. Adams Street, Eagle Pass, Texas. This acquisition is a total set-aside for small business concerns, including HUBZone, SDVOSB, WOSB, and EDWOSB categories. The selected contractor will provide all necessary personnel, equipment, and supplies to perform cleaning services on a two-day per week schedule for a period of performance lasting 12 months from the date of award. The government will award the contract to the responsible offeror whose proposal is most advantageous, considering price and other factors. Evaluation criteria include past performance, with a requirement for up to five references, and risk assessments via the Supplier Performance Risk System regarding item, price, and supplier risk. Awardees must provide a written Quality Control Plan within 30 calendar days of award and utilize a weekly signed janitorial service checklist to verify completion. Payment requests must be submitted electronically through the USACE Resident Management System rather than WAWF/iRAPT. Offerors must be registered in the System for Award Management with a valid Unique Entity Identifier and CAGE code. Proposals must include the solicitation number, offeror details, and a statement of agreement with all terms and conditions. Prices must remain firm for 60 calendar days from the submission deadline of November 5, 2026. The contract requires compliance with Service Contract Labor Standards, safety standards under 29 CFR Part 1925, and the designation of a qualified Contract Manager with full operational authority.
Janitorial Services

POSTED

1 day ago

DEADLINE

in 7 days
View Details
NAICS: 339950
New
Federal
Piney Woods Region, Lake O the Pines Park Signs
Solicitation # W9126G27QA002
Solicitation W9126G27QA002 is a total small business set-aside for the procurement of 187 custom aluminum signs for the USACE Lake O the Pines project in Jefferson, Texas. The requirement is a firm-fixed-price contract to provide signage for offices, boat ramps, and campgrounds. All signs must be fabricated in strict accordance with USACE Sign Program Manuals EP 310-1-6a and EP 310-1-6b, as well as the Corps Graphic Standards Manual EP 310-1-6. Key technical requirements include the use of specific aluminum substrates, Diamond Grade retroreflective sheeting where specified, and adherence to approved USACE colors and Helvetica typography. The government will award the contract to a responsible offeror based on best value, utilizing a GO/NO GO technical evaluation to ensure product specifications are met. Deliverables include the signs and required artwork proofs for approval prior to shipping. The revised delivery schedule is 30 to 45 business days following artwork and color match approval, with an estimated final delivery date of December 1, 2026. Shipping is FOB Destination and is the responsibility of the contractor. Offerors must submit their quotes electronically via the PIEE Solicitation Module by November 12, 2026, at 10:00 A.M. CST. Submissions must include a price volume, a technical volume detailing each sign and the estimated delivery timeframe, a completed vendor information sheet, and signed acknowledgments of all amendments. Payment will be processed electronically through Wide Area WorkFlow.
Sign Manufacturing

POSTED

2 days ago

DEADLINE

in 14 days
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS