Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Combined Synopsis/Solicitation opportunity from Department Of Defense was posted on June 30, 2025. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

C135 NDT, ET Data Acquisition Cal/Std. Base + Diesel Heat Exchanger ET Standards, Sole Source Zetec

Closed
N3904025Q1044Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

AI Contract Overview

Show more

The contract involves Zetec, Inc. being awarded a sole source task to produce prefabricated defect standards using the same material as specified, which will undergo Non-Destructive Testing (NDT) through the Eddy Current method in accordance with the detailed Statement of Work (SOW 1). Additionally, Zetec is tasked with manufacturing Diesel Heat Exchanger ET Standards as outlined in SOW 2. The Portsmouth Naval Shipyard will provide Government Furnished Property (GFP) to Zetec for the calibration standards, which must be returned to the Navy within 8 to 10 weeks after receipt. The work is to commence immediately upon award and receipt of GFP, with the performance site located at Zetec’s facility in Snoqualmie, Washington. The contract includes several attachments such as detailed SOWs, GFP documentation, contract data reporting requirements, wage determinations, and other relevant documentation. The solicitation was posted on June 30, 2025, with a response deadline of July 9, 2025. The project is managed under the Department of the Navy, with primary contact Lisa A. Fielding. The contract is classified under NAICS code 334515, which pertains to electronic and precision equipment manufacturing, and is conducted without any set-aside restrictions.

General Info

Zetec sole-source contract to fabricate eddy current calibration standards using Government Furnished Property.

NAICS

334515 - Instrument Manufacturing for Measuring and Testing Electricity and Electrical Signals

Place of Performance

Snoqualmie, WA, USA

Set-Aside

NONE

Documents

8

C135 Diesel Heat Exchanger ET Standards SOW

PDF, High priority: read this firstsow
High

C135 Eddy Current (ET) Data Acquisition Calibration Standards SOW

PDF, High priority: read this firstsow
High

N3904025Q1044 - C135 NDT, ET Data Acquisition Cal/Std

DOCX, High priority: read this firstrfq
High

N3904025Q1044 - GFP Attachment (C135 NDT Eddy Testing)

PDF, High priority: read this firstgfp-list
High

Wage Determination No. 2015-5535 (Revision 25)

PDF, High priority: read this firstwage-determination
High

SAP Limited Source Justification - Zetec Inc. Calibration Standards

PDF, Low priorityjustification-and-authorization
Low

Attachment+4+DD1423+CDRL+1.pdf

PDF

Attachment+5+DD1423+CDRL+2+Diesel+Heat+Exchanger.pdf

PDF

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseClosed
Posted

Combined Synopsis

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → Portsmouth Naval Shipyard Gf
Contacts1 person available
OfficePORTSMOUTH, NH, 03801-5000, USA
Office AddressPORTSMOUTH, NH, 03801-5000, USA
Contacts

Full Description

Show more

The Portsmouth Naval Shipyard requests the following:


Zetec (Sole Source) to provide the service of having prefabricated defects placed in a standard of the same material, that will be NDT inspected using the Eddy Current method of NDT Inspection in accordance with Statement of Work (SOW) 1. (Ref S15851_Rev06). In addition, C135 has a second requirement for Diesel Heat Exchanger ET Standards in accordance with SOW 2. (Ref S16947)


The Government will send the Government Furnished Property (GFP) to Zetec to manufacture ET calibration standards in accordance with each SOW. Zetec to return GFP to Portsmouth Naval Shipyard after completion.


  • Required Period of Performance: Shall start immediately following the award & Receipt of Government Furnished Property (GFP). Return GFP to Government NLT 8-10 Weeks after receiving.
  • Place of Performance: Zetec, Inc. 8226 Bracken Place SE; Suite 100, Snoqualmie, WA 98065

Attachments:


  • Attachment 1 SOW 1
  • Attachment 2 SOW 2
  • Attachment 3 GFP 1
  • Attachment 4 DD1423 CDRL 1
  • Attachment 5 DD1423 CDRL 2
  • Attachment 6 Wage Determination
  • Attachment 7 LSJ

More opportunities from Department Of Defense → Portsmouth Naval Shipyard Gf

Same awarding agency

NAICS: 532490
New
Federal
Rental- 800 LPAC System- Naval Base Point Loma, San Diego, CA (PLOMA) Amendment 0001
Solicitation # N3904027Q0010
Portsmouth Naval Shipyard is soliciting quotes for the rental of one electric, oil-free 800 CFM Low Pressure Air Compressor (LPAC) system to be located at Naval Base Point Loma in San Diego, California. The required equipment package must include a 200 HP compressor, a 1000-gallon air receiving tank, a desiccant air dryer, and associated manifolds and hoses. The system must maintain a minimum working pressure of 150 PSI and comply with CGA G-7-1-2018, ISO 8573-12:2000, OSHA 29 CFR 1910.169, and NEMA 3 standards. The contractor is responsible for making final electrical connections to government-provided power sources and must be prepared to route up to 1500 feet of emergency-stop cabling. The period of performance consists of a five-week base period from November 2, 2026, to December 6, 2026, with a two-week optional extension from December 7, 2026, to December 20, 2026. This is a Total Small Business Set-Aside under NAICS 532490, with award based on the Lowest Price Technically Acceptable (LPTA) criteria, though the government may prioritize the soonest mobilization. Key deliverables include equipment technical manuals, a personnel roster, a maintenance support plan affixed to the machine in a waterproof case, and maintenance service reports. Proposals must be submitted via email by October 21, 2026, at 12:30 PM EST, and vendors must be registered in the System for Award Management (SAM).
Other Commercial and Industrial Machinery and Equipment Rental and Leasing

POSTED

1 day ago

DEADLINE

in about 11 hours
View Details

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS