Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Government Contract opportunity from Department Of Transportation was posted on February 21, 2018. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

CA FLAP SR89(2), Meeks Bay Trail

Awarded
DTFH6817B00002Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237990
New
SLED
Carlson Field Athletic Complex: Construction of new Pickleball Courts
Solicitation # BCP-REC-26
The Town of Hingham, Massachusetts, is soliciting sealed bids for the construction of eight new pickleball courts at the Carlson Field Athletic Complex, with an estimated project cost of $1,300,000. The scope of work includes site preparation such as the removal of trees and shrubs, re-grading, and the installation of the courts, posts, nets, walkways, benches, shade shelters, and ADA pathways. Additionally, the project requires a new asphalt parking lot and the installation of solid AF-6 Acoustifence Panels around the entire perimeter for sound attenuation. The contractor is responsible for maintaining construction fencing and erosion control, coordinating closely with the Town and the demolition contractor, Pasquazzi Bros, Inc. The contract will be awarded to the lowest responsible and eligible bidder who possesses at least seven years of experience constructing sports courts or similar athletic facilities. Bidders must provide a statement of qualifications, including three similar public project examples and three references, one of which must be a Massachusetts municipality from the last two years. This is a lump sum, fixed-price contract with no escalation for fuel, labor, or materials. Compliance with Massachusetts prevailing wage laws, OSHA regulations, and the Massachusetts Building Code is mandatory. Bids must be submitted electronically via the OpenGov portal by November 3, 2026, at 9:00 am, and must include a 5% bid security.
Recreation

POSTED

about 8 hours ago

DEADLINE

in 5 days

AI Contract Overview

Show more

The Meeks Bay Trail and Tahoe City Sidewalk and Bike Trail Project involves the construction of pedestrian and bicycle infrastructure in El Dorado County, California. The primary scope consists of a 0.7-mile Class 1 Bike Path from Meeks Bay Resort and Marina to Sugar Pine Point State Park, featuring a 65-foot prefabricated weathering steel pedestrian bridge, rockeries, and water quality features. Additional work under Option X includes 0.4 miles of bike path and 0.25 miles of sidewalk construction in Tahoe City, along with lighting improvements along West Lake Boulevard. Managed by the Department of Transportation's Central Federal Lands Division, the project is valued between 1 and 5 million dollars and is set aside for HUBZone Small Business Concerns. Key technical requirements include significant roadway excavation, the installation of 1,700 feet of pedestrian railing, and the application of asphalt concrete pavement across both project segments. The contract falls under NAICS code 237990.

General Info

Contract Value

$5,110,822.67

NAICS

237990 - Other Heavy and Civil Engineering Construction

Place of Performance

Lake Tahoe Basin National Forest, El Dorado County, CA, USA

Set-Aside

NONE

Award Issued Date

Documents

16

A001.pdf

PDF

A002.pdf

PDF

A003.pdf

PDF

A004.pdf

PDF

CA_FLAP_SR89%282%29_Bid_Opening_Summary.pdf

PDF

CA_FLAP_SR89%282%29_MeeksBayBikeTrail_DrainageReport_v2.pdf

PDF

CA_FLAP_SR89%282%29_OptionX_Plans_Final.pdf

PDF

CA_FLAP_SR89%282%29_OptionX_Plans_Final.pdf

PDF

CA_FLAP_SR_89%282%29_Schedule_A_Plans_Final.pdf

PDF

DTFH6817B00002.pdf

PDF

Meeks_Bay_BikeBridge-Final_GeotechReport.pdf

PDF

Meeks_Bay_Hydraulics_Report.pdf

PDF

QnA_1.16.18.pdf

PDF

QnA_1.25.18.pdf

PDF

QnA_1.30.18.pdf

PDF

QnA_1.9.18.pdf

PDF

AI Contract Breakdown

Uniform Contract Format

Contract not broken down yet

CLEATUS splits the solicitation into Uniform Contract Format (UCF) sections: scope, pricing, deliverables, and evaluation criteria.

Timeline

9 updates
PhaseAwarded
Posted

Presolicitation

Notice updated

Response deadline added: Feb 1, 2018. The notice description changed.

Notice updated

Notice details unchanged. Attachments may have changed.

Notice updated

Notice details unchanged. Attachments may have changed.

Notice updated

Notice details unchanged. Attachments may have changed.

Notice updated

Notice details unchanged. Attachments may have changed.

Notice updated

Notice details unchanged. Attachments may have changed.

Notice updated

Notice details unchanged. Attachments may have changed.

Notice updated

Notice details unchanged. Attachments may have changed.

Notice updated

Notice details unchanged. Attachments may have changed.

Type Changed

Presolicitation → Solicitation

Awarded

Contract was awarded

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Transportation → 6982AF Central Federal Lands Divisi
Contacts2 people available
OfficeLAKEWOOD, CO, 80228, USA
Office AddressLAKEWOOD, CO, 80228, USA
Contacts
Ryan Phillips
Jeremiah Rogers

Full Description

Show more
PROJECT NUMBER: CA FLAP SR 89(2) PROJECT NAME: Meeks Bay Trail and Tahoe City Sidewalk and Bike Trail Project PROJECT DESCRIPTION: The Meeks Bay Trail (Schedule A) is located on the west shore of Lake Tahoe approximately 10 miles south of Tahoe City and 18 miles northwest of South Lake Tahoe in eastern El Dorado County, California. The project includes construction of a 0.7-mile long Class 1 Bike Path on a new alignment. The bike path will start at the Meeks Bay Resort & Marina and end at the existing path near Sugar Pine Point State Park. Project improvements include a bike/pedestrian Geosynthetic Reinforced Soil-Integrated Bridge System (GRS-IBS) over a drainage channel, bicycle railings, rockeries, and water quality features to treat runoff from the SR 89 ROW. The project includes four crossings of private driveways and one crossing of a culvert. The Tahoe City Sidewalk and Bike Trail Project (Option X) is located in Tahoe City, California near the SR 89 and SR 28 intersection area. The project includes 0.4 miles of bike path construction, broken into three separate locations. The project also includes 0.25 miles of sidewalk construction at three separate locations. The project also includes the addition of lighting infrastructure along West Lake Boulevard. The project will tie into the existing Truckee River Bridge project. SIGNIFICANT QUANTITIES: Schedule A: (0.71 miles of 10' paved bike path, GRS-IBS Bridge, and rockeries) - Significant items include (quantities are subject to change): - Removal of 55 trees - 2,500 CY of Roadway Excavation - 450 CY of Rockeries - 1,000 Tons of Hot Asphalt Concrete Pavement - 1,500 CY of Roadway Aggregate - 1 - Prefabricated weathering steel pedestrian bridge, 65' long - 1,700 feet of pedestrian railing Option X: - Significant items include (quantities are subject to change): - 0.25 miles of Lighting Improvements - 700 Tons of Asphalt Concrete Pavement - 800 SY of Concrete Sidewalk The expected release of the solicitation is early January, 2018. The price range of this project work is between $1 and $5 million. This will be set-aside for HUBZone Small Business Concerns.

More opportunities from Department Of Transportation → 6982AF Central Federal Lands Divisi

Same awarding agency

NAICS: 237310
New
Federal
TX FW LGA 10(5) Steve Thompson Wildlife Drive
Solicitation # 6982AF27B000006
Solicitation 6982AF27B000006 is a firm fixed price, small business set-aside contract issued by the Federal Highway Administration for the rehabilitation of Steve Thompson Wildlife Drive and Bayside Drive at the Laguna Atascosa National Wildlife Refuge in Cameron County, Texas. The project covers approximately 12.33 miles of roadway and involves full-depth reclamation of existing chip seal and gravel surfaces, the installation of a new aggregate base course and gravel surfacing, roadway realignment, and widening. Additional scope includes the installation of an aluminum gate, a small concrete pad, safety improvement signs, and 13 brand-name Rubberform Recycled Products modular speed bumps. The estimated project value ranges between 2 million and 5 million dollars. The contract will be awarded to the lowest responsive and responsible bidder based on the total price for Schedule A, which includes Alternate 2. Bidders must also provide pricing for Alternate 1 and Alternate 3, as the government reserves the right to award Schedule A in combination with one of these alternates. Performance must begin within 10 calendar days of the notice to proceed. Compliance requirements include the Davis-Bacon Act for wages, the Buy American Act, and adherence to FP-24 Standard Specifications for Construction of Roads and Bridges on Federal Highway Projects. Bidders must be registered in the System for Award Management under NAICS 237310 and provide original bid bonds and resumes for key personnel.
Highway, Street, and Bridge Construction

POSTED

about 13 hours ago

DEADLINE

in 6 days
View Details
NAICS: 237310
New
Federal
ND NP THRO 204(1) Buck Hill Road
Solicitation # 6982AF25B000004
Solicitation 6982AF25B000004 is an Invitation for Bid for the Buck Hill Road project (ND NP THRO 204(1)) located in Theodore Roosevelt National Park, North Dakota. Issued by the Federal Highway Administration Central Federal Lands Highway Division, the project is a full and open competition with a HUBZone price preference. The estimated cost range is between 5 million and 10 million dollars, with a construction period anticipated from April 2027 through November 2027. The contract is awarded to the lowest responsive responsible bidder based on a single base schedule with no options. The scope of work consists of three primary components: the rehabilitation of approximately 0.75 miles of roadway, deep subexcavation of 1,000 linear feet to stabilize an existing landslide, and the reconstruction and expansion of the Buck Hill Overlook parking lot to accommodate larger vehicles. Key work items include the placement of 2,000 tons of hot asphalt concrete pavement, 5,000 tons of roadway aggregate, 11,000 cubic yards of subexcavation, and the installation of 5,100 linear feet of concrete curb and gutter. The project must adhere to FP-14 Standard Specifications for Construction of Roads and Bridges on Federal Highway Projects. Administrative requirements include the submission of original bid bonds, resumes for key personnel and superintendents, and compliance with the Davis-Bacon Act. Liquidated damages for construction delays are set at 3,900 dollars per calendar day. Invoicing must be processed electronically through the iSupplier (DELPHI) system. The project also involves specific material standards, such as ASTM A36 structural steel and ASTM A307 galvanized bolts, and requires the use of specific National Park Service matching materials for benches and trash receptacles.
Highway, Street, and Bridge Construction

POSTED

about 13 hours ago

DEADLINE

in 5 days
View Details
NAICS: 237310
New
Federal
OK FW TSM 10(1) NFH Entrance Road and Parking Improvements
Solicitation # 6982AF27B000003
Solicitation 6982AF27B000003 is a firm fixed price contract issued by the U.S. Department of Transportation, Federal Highway Administration, for entrance road and parking improvements at the Tishomingo National Fish Hatchery in Johnston County, Oklahoma. This total small business set-aside project, with an estimated value between 700,000 and 2,000,000 dollars, focuses on road resurfacing, drainage, and safety enhancements. The scope of work includes full depth reclamation of existing asphalt to 6 inches, the application of 3 inches of new asphalt concrete pavement, super elevation correction, and culvert replacement. Additionally, the contractor will construct new parking areas, install two new entrance gates, and ensure the installation of Architectural Barriers Act compliant curb ramps and parking spots. The project is governed by the FP-24 Standard Specifications for Construction of Roads and Bridges on Federal Highway Projects and requires the implementation of a Stormwater Pollution Prevention Plan. Key deliverables include a comprehensive Operation and Maintenance manual, a minimum five-year material warranty, and a one-year workmanship warranty for gate components. Award will be granted to the lowest responsive responsible bidder. Performance must begin within 10 calendar days of the notice to proceed. The contract includes strict compliance requirements, including Davis-Bacon Act labor standards, Buy American Act regulations, and liquidated damages of 2,600 dollars per calendar day for delays. Invoicing is primarily handled through the DOT DELPHI system.
Highway, Street, and Bridge Construction

POSTED

1 day ago

DEADLINE

in 14 days
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS