OK FW TSM 10(1) NFH Entrance Road and Parking Improvements
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
AI Contract Overview
The NFH Entrance Road and Parking Improvements project, identified as OK FW TSM 10(1), involves significant infrastructure upgrades at the Tishomingo National Fish Hatchery in south-central Oklahoma. This small business set-aside project aims to address deteriorated pavement by implementing full-depth reclamation of the existing asphalt, installing new asphalt concrete pavement, and performing roadway excavation. Key improvements include the construction of new parking areas, the installation of entrance gates, culvert replacement, and the addition of ABA-compliant parking spots and curb ramps to ensure accessibility. The estimated cost for this project ranges between $700,000 and $2,000,000. The anticipated timeline includes an advertisement in September 2026, with an award expected in November 2026. Construction is scheduled to take place from June 2027 through October 2027, during which time the entrance roads and parking areas will be closed to facilitate the work. This presolicitation is managed by the Central Federal Lands Division under the Department of Transportation.
General Info
Agency
NAICS
Place of Performance
Tishomingo, OK, 73460, USASet-Aside
Documents
(0)AI Contract Breakdown
Uniform Contract FormatNo contract breakdown available.
Cannot generate Contract Breakdown because no documents were found from this contract's source.
Timeline
Response Deadline
Organization & Contact Information
Full Description
THIS IS NOT AN INVITATION FOR BID, PLAN AND SPECIFICATIONS ARE NOT AVAILABLE
Small Business Set-Aside
PROJECT NUMBER: OK FW TSM 10(1)
PROJECT NAME: NFH Entrance Road and Parking Improvements
PROJECT DESCRIPTION:
The Tishomingo National Fish Hatchery (NFH) is in south-central Oklahoma off SH 7 on a 220-acre U.S. Fish and Wildlife Service (FWS) facility approximately 8 miles northwest of the Town of Tishomingo. The project will address deteriorated pavement for the entrance loop, adding a small parking area at the northeast corner of the entrance loop, and pavement of the entrance road and parking area south of HWY 7. The 3R project will provide new driving surface, entrance gates, culverts, Architectural Barriers Act (ABA) compliant parking spot, and ABA compliant curb ramp.
SCOPE OF THE WORK:
The project will consist of full depth reclamation of the existing roads asphalt to a depth of 6-in, paving 3-in of asphalt, super elevation correction, and culvert replacement. New parking areas will be constructed with new aggregate base and asphalt pavement. A concrete ABA compliant curb ramp and ABA compliant parking spot. Concrete aprons will be placed around existing structures to match existing. Two new gates at the entrances to the NFH will also be installed. Entrance roads and parking areas will be closed during construction.
PRINCIPAL WORK ITEMS:
- 30402-5300 Full Depth Reclamation Method 2, 6-inch depth: 6,800 SQYD
- 40301-0100 Asphalt Concrete Pavement, 1,250 TON
- 20401-0000 Roadway Excavation, 400 CUYD
ANTICIPATED SCHEDULE:
Advertisement – September 2026
Award - November 2026
Construction – June 2027 through October 2027
ESTIMATED COST RANGE:
Between $700,000 and $2,000,000