HI FLAP CR562(1) Kilauea Point
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
AI Contract Overview
The HI FLAP CR562(1) Kilauea Point project is a pre-solicitation effort managed by the Department of Transportation's Central Federal Lands Division to improve pedestrian and bicyclist access to the Kilauea Point National Wildlife Refuge on the north shore of Kaua'i. Spanning approximately 1.70 miles from the Kuhio Highway intersection to the refuge overlook, the project involves installing a new concrete sidewalk, rehabilitating and resurfacing existing roadways, and reconstructing the turnaround. Key infrastructure additions include two mini-roundabouts, guardrails, curbs, gutters, and 34 accessibility ramps to create a safe corridor. The scope of work includes the removal of 18,500 square yards of asphalt, significant roadway excavation, and the installation of over 4,000 tons of asphalt concrete pavement. The estimated cost for the project ranges between 10 million and 20 million dollars. The anticipated timeline begins with advertising in late 2026, with a bid opening in December 2026 and a contract award in January 2027. Construction is expected to take place from January 2027 through January 2028.
General Info
Place of Performance
Kilauea, HI, USASet-Aside
Documents
0AI Contract Breakdown
Uniform Contract FormatNo documents to break down
The breakdown needs solicitation documents. None were found from this contract's source.
Timeline
Organization & Contact Information
Full Description
THIS IS NOT AN INVITIATION FOR BID, PLAN AND SPEFICIATIONS ARE NOT AVAILBLE
PROJECT NAME: HI FLAP CR562(1) Kilauea Point
PROJECT DESCRIPTION:
Kilauea Point National Wildlife Refuge (KPNWR) is a 203-acre facility located on the north shore of the Island of Kaua'i. It is part of the Kaua'i National Wildlife Refuge Complex managed by the United States Fish and Wildlife Service. To keep up with the visitation demands, the KPNWR and the USFWS along with the Federal Highway Administration Central Federal Lands Highway Division is proposing to improve the area by providing better access along Kolo Road and Kilauea Road (Route 562) for pedestrians and bicyclists, as well as improvements to the overlook.
The project consists of installation of a sidewalk adjacent the existing roadway from the intersection of Kuhio Highway to the KPNWR Overlook. Work includes pavement rehabilitation and resurfacing of the existing roadway, with full depth pavement on aggregate base course for roadway widening segments, and reconstruction of the existing turnaround. Guardrail, sidewalk, curb, gutter, two mini-roundabouts, striping, and pedestrian crossings will be provided to establish a safe and accessible corridor for pedestrians and bicyclists. Minor utility adjustments and construction is also anticipated. The total project length is approximately 1.70 miles.
PRINCIPAL WORK ITEMS:
- 18,500 square yards of Removal of Pavement, Asphalt
- 3,370 cubic yards of Roadway Excavation
- 2,900 ton of Roadway Aggregate, Method 2
- 4,200 ton of Asphalt Concrete pavement, Type 1
- 630 square yard of minor concrete Pavement, Reinforced
- 1,540 linear feet of Curb, Concrete, 16-Inch Depth (Slotted)
- 5,670 square yards of Sidewalk, Concrete
- 34 Accessibility Ramps, Concrete
ANTICIPATED SCHEDULE:
Advertise: End of October or Early November 2026
Bid Opening: December 2026
Award: January 2027
Construction: January 2027 –January 2028
ESTIMATED COST RANGE: The anticipated cost range is between 10,000,000 and $20,000,000.
Similar Contracts
Same NAICS industry code
More opportunities from Department Of Transportation → 6982AF Central Federal Lands Divisi
Same awarding agency
Ready to Pursue This Opportunity?
Get AI-powered intelligence on this solicitation and the ones like it
Every page of the solicitation package shredded into a compliance breakdown
AI-powered matching based on your capabilities and past performance
Competitor and incumbent history on the requirement
Automated alerts on amendments, Q&A deadlines, and award
Join 750+ contractors already using CLEATUS