UT NP ARCH 100(2) Bridges on Delicate Arch Road

Active
6982AF27B000005Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

Project UT NP ARCH 100(2) involves the reconstruction and restoration of Delicate Arch Road within Arches National Park to address flooding and sediment issues caused by inadequate culverts. The scope of work includes the design and construction of three 100-foot span concrete bridges at Salt Valley Wash, Salt Wash, and Winter Camp Wash. Additionally, the project requires realigning the roadway at Salt Valley Wash, raising the road profile to accommodate a 10-year design frequency, and performing full depth reclamation or pavement removal with a 4-inch overlay across remaining sections and parking areas. Key deliverables include significant quantities of structural concrete, epoxy-coated reinforcing steel, asphalt concrete pavement, and drilled shafts. The project is estimated to cost between 10 million and 20 million dollars and will be solicited as a full and open competition. The anticipated schedule begins with advertisement in September 2026, with a notice to proceed in December 2026 and a targeted completion date of December 2028.

General Info

Reconstruct Delicate Arch Road with three bridges, costing 10-20 million dollars by 2028.

Agency

Department Of Transportation → 6982AF Central Federal Lands DivisiView Agency

NAICS

237310 - Highway, Street, and Bridge ConstructionView NAICS

Place of Performance

Moab, UT, USA

Set-Aside

NONE

Documents

(0)

No documents available

AI Contract Breakdown

Uniform Contract Format

No contract breakdown available.

Cannot generate Contract Breakdown because no documents were found from this contract's source.

Timeline

PhasePresolicitation
Posted

Presolicitation

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyDepartment Of Transportation → 6982AF Central Federal Lands Divisi
Contacts2 people available
OfficeLAKEWOOD, CO, 80228, USA
Organization / Agency
Department Of Transportation → 6982AF Central Federal Lands Divisi
View Agency Profile
Office AddressLAKEWOOD, CO, 80228, USA
Contacts
Laura Slauter
Ryan Phillips

Full Description

Show more

PROJECT NUMBER: UT NP ARCH 100(2)


PROJECT NAME: Bridges on Delicate Arch Road


PROJECT DESCRIPTION: 


Delicate Arch Road (DAR) is within Arches National Park (Park) and provides access to


Delicate Arch. DAR is a functional class 1 roadway (Principal Park Road) and is heavily


traveled by visitors and often congested during periods with moderate-to-high levels of


visitation.



DAR crosses three low-gradient ephemeral washes (Salt Valley Wash, Salt Wash, and


Winter Camp Wash) near their confluence in the Salt Wash Basin downstream of Wolfe


Ranch. Culverts installed during original road construction in the mid-1990s and during


subsequent upgrades are inadequate to allow unobstructed stream flow and sediment


transport downstream. This existing condition produces flooding and sediment


deposition, which creates unsafe conditions for visitors, triggers road closures, potentially


strands Park visitors, diminishes visitor experience of the Park, and generates high


operational costs associated with traffic management, visitor safety, and cleanup


operations.



SCOPE OF THE WORK: 


This project will be designated as Reconstruction (4R) with one segment of restoration


(3R), and will design and construct 100’ span concrete bridges at the Salt Valley Wash,


Salt Wash, and Winter Camp Wash. The DA roadway profile at each Wash will be raised


to accommodate a 10-year design frequency and allow a medium-sized excavator to


access each wash. The DA will be realigned at the Salt Valley wash, moving the roadway


and new bridge location to the north of the existing roadway and drainage crossing. The


remaining 3R sections of the roadway will receive full depth reclamation (FDR) or


removal of pavement, including all parking areas, followed by a 4-inch pavement


overlay.



PRINCIPAL WORK ITEMS:


  • 20420-0000 Embankment Construction: 10,000 CUYD
  • 25101-0300 Placed Riprap, Class 3: 1,725 CUYD
  • 30202-2000 Roadway Aggregate, Method 2: 5,140 TON
  • 40101-5600 Asphalt Concrete Pavement, Gyratory Mix, 1/2-Inch or 3/4-Inch Nominal Maximum Size Aggregate, 0.3 To <3 Million ESAL: 8,300 TON
  • 55201-0200 Structural Concrete, Class A (AE): 752 CUYD
  • 55401-2000 Reinforcing Steel, Epoxy Coated: 138,000 LB
  • 55601-1100 Bridge Railing, Steel, Two Rail: 642 LNFT
  • 56501-0200 Drilled Shaft, 24-Inch Diameter: 750 LNFT
  • 56501-0300 Drilled Shaft, 30-Inch Diameter: 890 LNFT
  • 60901-1300 Curb, Concrete, 15-Inch Depth (Reinforced, Colored): 3,921 LNFT
  • 61701-4500 Guardrail System Mgs, Type 2, Class A Steel Posts: 1,290 LNFT
  • 63506-0500 Temporary Traffic Control, Flagger: 5,800 HOUR


ANTICIPATED SCHEDULE: 


Advertisement – September 2026


Award – November 2026


NTP – December 2026


Contract Completion – December 2028



ESTIMATED COST RANGE: 


Total estimated cost between $10,000,000 and $20,000,000


This will be solicited as a full and open competition.

Similar Contracts

Same NAICS industry code

NAICS: 237310
New
Pier B On-Dock Rail Support Facility West Expansion and Pier B Street Realignment
Solicitation # HD-S3135
Kiewit Infrastructure West Co. is soliciting quotes from qualified subcontractors, material contractors, and suppliers for the Pier B On-Dock Rail Support Facility West Expansion and Pier B Street Realignment project in Long Beach, California. The scope of work is extensive, covering heavy civil and infrastructure activities including site preparation, asbestos abatement, tunneling, directional drilling, underground piping, asphalt and concrete paving, electrical work, and telecommunications. The project is partially funded by multiple grants from the FHWA, LACMTA, the State of California Transportation Agency, and the U.S. DOT MARAD, necessitating strict adherence to DBE Program requirements and the California Labor Code. Eligible bidders must possess a valid California Contractor’s license and provide acceptable insurance. SBE and VSBE firms must provide certification evidence from the Department of General Services and the Port of Long Beach PlanetBids portal. The project is subject to a Project Labor Agreement, prevailing wage rates, and requires firms performing onsite work to be signatory to collective bargaining agreements with specific trades to ensure labor harmony. Subcontractors may be required to provide bonding for 100% of their contract value, with bond premiums reimbursed by Kiewit. Interested parties must contact the Lead Estimator to receive an Invitation to Bid via the BuildingConnected system before the September 15, 2026, deadline.
Kiewit Infrastructure West Co.

POSTED

about 6 hours ago

DEADLINE

in 6 days
View Details

More opportunities from Department Of Transportation → 6982AF Central Federal Lands Divisi

Same awarding agency

NAICS: 237310
New
Federal
NV BL SONV 500(3) Red Rock Trail
Solicitation # 6982AF26SS00007
The Red Rock Trail project in Las Vegas, Nevada, is currently in the sources-sought phase to determine if there is sufficient interest from qualified small business prime contractors to justify a set-aside. Located within the environmentally sensitive Red Rock Conservation Area, the scope of work involves constructing approximately seven miles of paved multi-use trail, widening State Highway 159 for additional turn lanes, and reconstructing the Moenkopi and Blue Diamond Mesa parking areas. Key technical requirements include 35,000 cubic yards of embankment construction, 30,000 tons of roadway aggregate, 12,000 tons of asphalt concrete pavement, 200 linear feet of precast reinforced concrete box culverts, and 2,500 square feet of MSE wall. Interested prime contractors must be certified in the System for Award Management and submit their response to Douglas Whitcomb by September 23, 2026, at 2 p.m. local Denver time. Submissions must include a statement of intent to bid, confirmed socioeconomic categories, a bonding agent letter verifying a single project capacity of 30 million dollars, and a list of previous road construction projects of similar value and scope. Specifically, applicants must demonstrate experience in multi-use trail construction, highway widening, parking area reconstruction, and grade-separated under-crossings within environmentally sensitive areas.
Highway, Street, and Bridge Construction

POSTED

about 10 hours ago

DEADLINE

in 14 days
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 650+ contractors already using CLEATUS