AZ BL COLO 7528(1) Burro Creek Road

Active
6982AF27B000002Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The Burro Creek Road project in Mohave County, Arizona, is a small business set-aside resurfacing, restoration, and rehabilitation effort covering approximately 1.3 miles of roadway. The primary goal is to improve access to the Burro Creek Campground while enhancing safety, drainage, and sediment control. The scope of work includes full depth reclamation and asphalt concrete pavement, the installation of cross culverts, ditch reconditioning, slope stabilization, and bridge approach repairs. The project also involves installing regulatory signs, pavement markings, and boulders to manage public access. The contract is divided into a base Schedule A for primary roadway rehabilitation and an Option X for bridge sedimentation and undercutting repairs. Key material requirements include 3,600 tons of asphalt concrete pavement and 1,600 tons of roadway aggregate. The estimated cost for the project ranges between 2 million and 5 million dollars. Construction is anticipated to take place from January 2027 through October 2027, following an award in January 2027.

General Info

Small business road rehabilitation project in Arizona, costing $2-5 million, starting January 2027.

Agency

Department Of Transportation → 6982AF Central Federal Lands DivisiView Agency

NAICS

237310 - Highway, Street, and Bridge ConstructionView NAICS

Place of Performance

Kingman, AZ, 86401, USA

Set-Aside

SBA

Documents

(0)

No documents available

AI Contract Breakdown

Uniform Contract Format

No contract breakdown available.

Cannot generate Contract Breakdown because no documents were found from this contract's source.

Timeline

PhasePresolicitation
Posted

Presolicitation

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyDepartment Of Transportation → 6982AF Central Federal Lands Divisi
Contacts2 people available
OfficeLAKEWOOD, CO, 80228, USA
Organization / Agency
Department Of Transportation → 6982AF Central Federal Lands Divisi
View Agency Profile
Office AddressLAKEWOOD, CO, 80228, USA
Contacts
Eric Grosskreuz

Full Description

Show more

THIS IS NOT AN INVITATION FOR BID, PLAN AND SPECIFICATIONS ARE NOT AVAILABLE


Small Business Set-Aside


PROJECT NUMBER: AZ FLAP PIM FR510(1)


PROJECT NAME: Burro Creek Road


PROJECT DESCRIPTION: 


Burro Creek Road is located in Mohave County, 71 miles southwest of Kingman, Arizona. The project is located in rolling terrain, with elevations along this section ranging from approximately 1,885 to 2,255 feet.  The project begins at the bridge over Burro Creek and ends at the cattle guard near the intersection with US Hwy 93. The project's length is approximately 1.3 miles.


SCOPE OF THE WORK: 


The proposed of this resurfacing, restoration, and rehabilitation (3R) project is to improve access to the camping and day use areas at the Burro Creek Campground, reduce maintenance costs and erosion, improve sediment control, drainage and safety.  The scope of work for this project includes the following major construction activities and items:


  • Pavement Rehabilitation: 1.3 miles of roadway resurfacing incorporating Full Depth Reclamation (FDR) and Asphalt Concrete Pavement, along with applicable fog seals and tack coats.
  • Drainage Improvements: Installation of cross culverts and reconstruction of an existing headwall.  Additional drainage work includes ditch grading and reconditioning, berms, bank stabilization, and the addition of flared end sections and riprap aprons throughout the project.
  • Earthwork & Stabilization: Embankment benching, slope stabilization, slope scaling, and specific bridge approach repairs at the eastern abutment to resolve undercutting concerns
  • Safety & Traffic Control Items: Installation of new regulatory and warning signs, pavement markings and the placement of boulders to control public access at specific locations throughout the project.

The project is structured with a base Schedule A encompassing the primary roadway rehabilitation, and an Option X which includes work associated with repairing bridge sedimentation, addressing undercutting at the bridge approaches, and boulder placement.


PRINCIPAL WORK ITEMS:


Roadway Aggregate: 1,600 TONS


Ditch Reconditioning: 2,000 LNFT


Full Depth Reclamation: 1.3 MILE


Asphalt Concrete Pavement: 3,600 TON


18-Inch Pipe Culvert: 100 LNFT


24-Inch Pipe Culvert: 175 LNFT


Boulder: 100 EACH


ANTICIPATED SCHEDULE: 


Advertisement – October 2026


Award-January - 2027


Construction – January 2027 through October 2027



ESTIMATED COST RANGE: 


Between $2,000,000 and $5,000,000

Similar Contracts

Same NAICS industry code

More opportunities from Department Of Transportation → 6982AF Central Federal Lands Divisi

Same awarding agency

NAICS: 237310
Federal
NV BL SONV 500(3) Red Rock Trail
Solicitation # 6982AF26SS00007
The Red Rock Trail project in Las Vegas, Nevada, is currently in the sources-sought phase to determine if there is sufficient interest from qualified small business prime contractors to justify a set-aside. Located within the environmentally sensitive Red Rock Conservation Area, the scope of work involves constructing approximately seven miles of paved multi-use trail, widening State Highway 159 for additional turn lanes, and reconstructing the Moenkopi and Blue Diamond Mesa parking areas. Key technical requirements include 35,000 cubic yards of embankment construction, 30,000 tons of roadway aggregate, 12,000 tons of asphalt concrete pavement, 200 linear feet of precast reinforced concrete box culverts, and 2,500 square feet of MSE wall. Interested prime contractors must be certified in the System for Award Management and submit their response to Douglas Whitcomb by September 23, 2026, at 2 p.m. local Denver time. Submissions must include a statement of intent to bid, confirmed socioeconomic categories, a bonding agent letter verifying a single project capacity of 30 million dollars, and a list of previous road construction projects of similar value and scope. Specifically, applicants must demonstrate experience in multi-use trail construction, highway widening, parking area reconstruction, and grade-separated under-crossings within environmentally sensitive areas.
Highway, Street, and Bridge Construction

POSTED

7 days ago

DEADLINE

in 7 days
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS