This project involves the rehabilitation of Buck Hill Road (Route 204) and the reconstruction of the Buck Hill Overlook parking lot within Theodore Roosevelt National Park in Medora, North Dakota. The scope of work consists of three primary components: the rehabilitation of approximately 0.75 miles of roadway including new asphalt pavement and guardrails, the execution of 1,000 linear feet of deep subexcavation to address a landslide, and the expansion of the overlook parking lot to better accommodate large vehicles and tour buses. Key infrastructure additions include concrete curbs, gutters, sidewalks, and subsurface drainage systems. The contract is a full and open competition with a HUBZone set-aside, with an estimated cost ranging between 5 million and 10 million dollars. Construction is anticipated to take place from April 2027 through November 2027, with the contract award expected in January 2027. Notable project restrictions include the requirement for a paleontological monitor during all ground-disturbing activities, though the contractor is permitted to close Buck Hill Road for the duration of the construction period.
General Info
Agency
NAICS
Place of Performance
Medora, ND, USASet-Aside
Documents
(0)AI Contract Breakdown
Uniform Contract FormatNo contract breakdown available.
Cannot generate Contract Breakdown because no documents were found from this contract's source.
Timeline
Response Deadline
Organization & Contact Information
Full Description
THIS IS NOT AN INVITATION FOR BID, PLAN AND SPECIFICATIONS ARE NOT AVAILABLE
Full and Open Competition with a HUBZone Set-Aside
PROJECT DESCRIPTION: ND NP THRO 204(1) Buck Hill Road
Buck Hill Road, also known as Route 204, is located in Billings County within Theodore Roosevelt (THRO) National Park (NP) in the southeast portion of the park near the South Unit, Medora, ND. The route is located in mountainous terrain at approximate elevation of 2,500 to 2,800 feet. It begins at the intersection of Buck Hill Road and South Unit Scenic Loop Road. The route then proceeds southeasterly for approximately ¾ of a mile and ascends approximately 300 feet vertically to the Buck Hill Overlook parking area. The route is located entirely within Theodore Roosevelt NP. There is one (1) base schedule and no options.
SCOPE OF THE WORK:
The project includes three major components; 1) Approximately ¾ mile of roadway rehabilitation, 2) Approximately 1,000 linear feet of deep subexcavation to address an existing landslide, and 3) Reconstructing the existing Buck Hill Overlook parking lot.
The main roadway rehabilitation includes pulverization of the existing roadway, placement of new roadway aggregate, and new hot asphalt concrete pavement and replacing existing guardrail with new guardrail. Additionally, this work includes constructing new paved ditches and installing concrete curb and gutter along most of the length of the roadway. This includes installation of several drainage inlets and culverts as well as new striping and signage.
The deep subexcavation work includes removal of approximately existing unsuitable material to a 10 feet depth for a continuous 1,000 linear foot length of roadway and replacing with suitable material with geosynthetic reinforcement and installing subsurface drainage. A geotechnical report will be provided with the PS&E package.
Reconstructing the existing Buck Hill Overlook parking lot expands and adds more parking spaces and accommodates larger trucks, recreational vehicles, and tour buses. The work includes removing the existing pavement, placing embankment material, new aggregate base, and new hot asphalt concrete pavement. This work also includes constructing accessible parking, placing new concrete sidewalk and curb and gutter, and striping and signage. New trash receptacles and stone benches will be installed as part of the new parking area.
Project restrictions include the following:
- The Contractor may close Buck Hill Road for the duration of construction.
- A Paleontological Monitor will be present for all ground disturbing activities.
PRINCIPAL WORK ITEMS:
Approximate quantities for major work items:
- 11,000 cubic yards of subexcavation
- 1,000 linear feet of geocomposite sheet drain
- 2,000 tons of hot asphalt concrete pavement
- 5,000 tons of roadway aggregate
- 550 linear feet of 24-inch pipe culvert (thick walled HDPE, fused)
- 5,100 linear feet of concrete curb and gutter (tan and onyx colored)
- 650 square yards of concrete sidewalk (tan colored)
- 1,600 linear feet of guardrail
ANTICIPATED SCHEDULE:
Advertisement – October 2026
Award - January 2027
Construction – April 2027 through November 2027
ESTIMATED COST RANGE:
Between $5,000,000 and $10,000,000
Similar Contracts
Same NAICS industry code
More opportunities from Department Of Transportation → 6982AF Central Federal Lands Divisi
Same awarding agency
Ready to Pursue This Opportunity?
Get AI-powered intelligence on this solicitation and the ones like it
Every page of the solicitation package shredded into a compliance breakdown
AI-powered matching based on your capabilities and past performance
Competitor and incumbent history on the requirement
Automated alerts on amendments, Q&A deadlines, and award
Join 750+ contractors already using CLEATUS