State Project No. L079-0004-Oregon Road Bridge No. 04184State & Local
Response Deadline
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
AI Contract Overview
Show more
The City of Meriden is soliciting bids for the replacement of the Oregon Road Bridge (Bridge No. 04184) over the Quinnipiac River. This project requires a contractor to provide all labor and materials for the construction, including the installation of water mains, sanitary sewers, and the implementation of sedimentation control systems. The work must adhere to CTDOT Highway and Traffic Standards, the ANSI-AWSA/ASHTO W8.3 Bridge Welding Code, and various ANSI/AWWA standards for ductile iron pipe and fittings. The contract is governed by the EJCDC Document C-700 General Conditions, as amended by Supplemental General Conditions.
Bids must be submitted electronically via the City eProcurement Portal by 11:00 am on December 10, 2026. Each submission must include a bid bond for 10% of the bid amount, with the successful bidder required to provide performance and payment bonds for 100% of the contract price. Award decisions are based on the best interest of the City, with tie-breaking preferences given to Connecticut-based businesses and specific provisions for City-based bidders. The project is subject to the Build America Buy America Act, prevailing wage requirements, and a minimum spending allocation goal of 25% for DAS-certified small and minority-owned businesses. Special environmental protections are also required for wood turtles encountered on-site.
General Info
City of Meriden seeks bids for the Oregon Road Bridge replacement project.
HighAI Summary for B027-23 Oregon Road Bridge Replacement: Invitation to Bid (ITB) issued by the City of Meriden on October 30, 2026, for the replacement of the Oregon Road Bridge (State Project No. L079-0004). The solicitation seeks a contractor to provide all labor and materials. Key dates include a pre-bid meeting on November 12, 2026, and a submission deadline of December 10, 2026, via the City's eProcurement portal. Requirements include a 10% bid bond, 100% performance and payment bonds, and compliance with state minimum wage and SBE/M/W/DisBE set-aside requirements.
PDF
PDF, High priority: read this firstcontract-document
HighAI Summary for B027-23 Oregon Road Bridge Replacement Agreement: Standard Form of Agreement between the City of Meriden (Owner) and a Contractor for the Oregon Road Bridge Replacement project. The document outlines the scope of work, designates GM2 Associates, Inc. as the Engineer/Architect, establishes a substantial completion timeline of 488 calendar days, and defines liquidated damages at $2,500 per day. It also details the contract price structure (lump sum and unit price) and the progress payment process including a 5% retainage.
PDF
PDF, High priority: read this firstspecial-notice
HighAI Summary for CHRO Notification to Bidders on Contract Compliance Regulations: This document, revised on 09/3/15, is a notification to bidders regarding contract compliance regulations mandated by Connecticut General Statutes Sections 4a-60, 4a-60a, 46a-71(d), and 46a-81i(d). It outlines the obligations of awarding agencies to solicit minority business enterprises and defines minority groups and small contractors. The document details factors considered in reviewing bidder qualifications, including affirmative action plans, apprenticeship programs, employment statistics, and set-asides for minority businesses. It also includes instructions for completing the Bidder Contract Compliance Monitoring Report, which must be submitted with bids to demonstrate compliance with equal employment opportunity and minority business inclusion requirements.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for City of Meriden - Bridge No. 04184 Replacement General Drawings: General drawings and project plans for the replacement of Bridge No. 04184 carrying Oregon Road over the Quinnipiac River (Project No. L079-0004) in the City of Meriden, Connecticut. The document includes project location plans, general construction notes, and structure item cost tables.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for City of Meriden Insurance Requirements: This document outlines the minimum insurance coverage requirements for contractors and vendors working with the City of Meriden and the State of Connecticut. It specifies limits for General Liability, Auto Liability, Umbrella/Excess Liability, Workers' Compensation, and specialized coverages such as Railroad Protective Liability and Marine Construction insurance. It includes requirements for Additional Insured status, Waivers of Subrogation, and AM Best ratings.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Construction Contracts Boilerplate Language - State Funded: This document provides required contract provisions and boilerplate language for state-funded construction contracts in Connecticut. It includes mandatory clauses regarding wage rates, ADA compliance, statutory labor requirements, safety training (OSHA), debarment, and various state executive orders and ethics laws.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for CTDOT Highway Standard Sheet - Drainage Trench Excavation and Endwalls: Technical standard sheets from the CTDOT Office of Engineering (dated 2022.11.09) providing detailed specifications for drainage trench excavation (HW-286_01) and straight endwall construction. Includes trench width charts, concrete dimensions for various pipe sizes, and reinforcing steel notes.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for CTDOT Traffic Standard - Individual: Technical specifications and installation standards for traffic control systems, specifically focusing on inductive loop test procedures, electrical wiring symbols, resistance measurements, and conduit installation details for curb crossings and pavement restoration.
PDF
PDF, High priority: read this first81 pages · standard-conditions
HighAI Summary for EJCDC Standard General Conditions of the Construction Contract 2007: This document is the 2007 edition of the Engineers Joint Contract Documents Committee (EJCDC) Standard General Conditions of the Construction Contract. It is jointly issued by major engineering and construction organizations including the American Council of Engineering Companies, Associated General Contractors of America, American Society of Civil Engineers, and the National Society of Professional Engineers. The document provides comprehensive general conditions governing construction contracts, including definitions, contractor and owner responsibilities, bonds and insurance, changes in work, payments, dispute resolution, and other essential contract provisions. It serves as a foundational contractual framework for construction projects.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for L079-0004 Replacement of Oregon Road Bridge Special Provisions: Special Provisions for the replacement of the Oregon Road Bridge (Bridge No. 04184) over the Quinnipiac River in Meriden, CT. The document includes a detailed table of contents for technical sections, specific requirements for LOTCIP project signage (materials, colors, and placement), payment terms for construction signs, and legal relations regarding utility coordination with the City of Meriden and Eversource Energy. Revised date 05/12/26.
PDF
PDF, High priority: read this first203 pages · specifications
HighAI Summary for L079-0004 Special Provisions - Replacement of Oregon Road Bridge: Special Provisions for LOTCIP project #L079-0004 regarding the replacement of the Oregon Road Bridge over the Quinnipiac River in Meriden, CT. The document includes a table of contents for technical specifications, procurement notices, detailed requirements for project signage (materials, colors, and placement), payment terms for construction signs, and legal responsibilities regarding utility coordination with the City of Meriden and Eversource Energy. Revised date 05/12/26.
PDF
PDF, High priority: read this firstwage-determination
HighAI Summary for Oregon Road Bridge Replacement - Prevailing Wages: Prevailing wage rates and welfare payments for the Oregon Road Bridge Replacement Project (Project Number: B027-23) in Meriden, Connecticut. Issued by the Connecticut Department of Labor, Wage and Workplace Standards Division, with rates effective as of October 27, 2026. The document details hourly rates and benefits for various classifications including boilermakers, carpenters, painters, electricians, ironworkers, laborers, truck drivers, and power equipment operators.
PDF
PDF, High priority: read this first25 pages · wage-determination
HighAI Summary for Prevailing Wage Information Packet - CT Public Works Safety and Wage Law: This document is an informational packet regarding prevailing wage laws and safety training requirements for public works projects in Connecticut, specifically under CT General Statutes Section 31-53 and 31-53b. It outlines the requirement for contractors and subcontractors to post prevailing wages, mandates a 10-hour OSHA construction safety and health course for mechanics, laborers, and workers on public works projects, and details enforcement and compliance procedures. The document includes statutory references, enforcement rules, and guidelines for proof of course completion, emphasizing compliance for contracts entered into on or after July 1, 2007, and July 1, 2009, depending on the provision. It serves as a critical guide for contractors to ensure adherence to wage and safety regulations on public building projects with a total cost of at least $100,000.
PDF
PDF, High priority: read this first5 pages · contract-document
HighAI Summary for Professional Services Agreement - City of Meriden 2025: This Professional Services Agreement between the City of Meriden and a Consultant outlines the terms for professional consulting services to be provided in 2025. It includes provisions on scope of work, payment terms, change orders, indemnification, and insurance requirements. The Consultant is responsible for compliance with the scope and schedule, attendance at meetings, and maintaining required insurance coverage. Payment is based on a lump sum cost with monthly billing for completed work. The City must approve any change orders or extensions. The agreement emphasizes the Consultant's responsibility for professional standards and indemnification of the City against claims arising from negligent acts. Insurance coverage must be maintained throughout the contract term and approved by the City.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Replacement of Bridge No. 04184 - Index of Drawings and Water Main Standards: Technical drawing index and detailed specifications for the replacement of Bridge No. 04184 carrying Oregon Road over the Quinnipiac River in the City of Meriden. The document includes water main standards, concrete thrust block details, and house connection lateral plan views, dated between 2013 and 2024.
PDF
PDF, High priority: read this first38 pages · specifications
HighAI Summary for Replacement of Bridge No. 04184 - Structure Index of Drawings: This document is the Structure Index of Drawings and General Notes for Project No. L079-00004, involving the replacement of Bridge No. 04184 carrying Oregon Road over the Quinnipiac River in the City of Meriden. It includes a comprehensive list of structural drawings (S-01 through S-29), material strength specifications for concrete and steel, and references to Connecticut Department of Transportation (CTDOT) Form B19 (2024) and AASHTO design standards.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Roadway Drawings - Bridge No. 04184 Replacement: Technical roadway drawings and typical sections for the replacement of Bridge No. 04184 carrying Oregon Road over the Quinnipiac River for the City of Meriden. Includes an index of drawings, pavement structure details, milling and overlay specifications, and material legends for Oregon Road and River Road (CT Route 70).
PDF
PDF, High priority: read this first2 pages · payment-bond
HighAI Summary for Sample Payment Bond Document: This document is a Labor and Material Payment Bond outlining the obligations of the Principal and Surety to the Owner for payment to claimants providing labor and materials for a specified contract. It defines claimants, conditions for payment, and legal recourse if payments are not made. The bond includes terms for notice requirements, suit limitations, and reduction of bond amount by payments made. The document is intended to secure payment for labor and materials used in the performance of a contract, ensuring financial protection for claimants.
PDF
PDF, High priority: read this first1 page · insurance-requirements
HighAI Summary for School Insurance Requirements: This document outlines the insurance requirements for a consultant under a contract. It specifies the need for Commercial General Liability Coverage with $1,000,000 occurrence and $2,000,000 aggregate limits, including coverage for premises, products, underground hazards, contractual liability, independent contractors, and abuse & molestation liability. Business Automobile Liability Coverage with a $1,000,000 combined single limit is required, covering non-owned, owned, scheduled, and any automobiles. Workers' Compensation and Employer's Liability Coverage must comply with Connecticut statutory requirements with specified limits of $500,000 each accident, disease policy limit, and each employee disease. Professional Liability, Malpractice, or Errors and Omissions Coverage with $2,000,000 per claim and aggregate limits is also required, written on an occurrence or claims-made basis.
PDF
PDF, Low priorityapproval
LowAI Summary for Oregon Road Bridge Replacement - Floodplain Development Approval: Correspondence dated November 6, 2025, from the City of Meriden confirming that the Inland Wetlands and Watercourses Commission unanimously approved the Floodplain Development Permit Application for the Oregon Road Bridge replacement project within the 100-year flood zone of the Quinnipiac River.
PDF
PDF, Low priority2 pages · performance-bond
LowAI Summary for Sample Performance Bond: This document is a Performance Bond associated with a contract between a Contractor and an Owner. It outlines the obligations of the Contractor and Surety to ensure the faithful performance of the contract. The bond guarantees payment and completion of the contract work, with provisions for the Surety to remedy defaults or arrange for contract completion. It includes conditions for legal action and specifies the bond amount and parties involved. The document is a standard form used to secure contract performance and protect the Owner's interests.
PDF
PDF, Low priorityaward
LowAI Summary for USACE Nationwide Permit 14 Verification - City of Meriden: Verification letter issued by the U.S. Army Corps of Engineers (USACE) New England District on October 26, 2026, authorizing the City of Meriden to proceed under Nationwide Permit (NWP) 14 for Linear Transportation Projects. The document includes a Work-Start Notification form and Regional Conditions for New England states. The verification is valid until March 15, 2031.
AI Contract Breakdown
Uniform Contract Format
Sign up to view the full breakdown with detailed analysis of each section.
Timeline
PhaseSolicitation
Posted
Solicitation
Response Deadline
Submission deadline
Response Deadline
Ready to pursue this opportunity?
Get full access to track this contract, build proposals with AI assistance, and manage your pipeline.
The City of Meriden seeks the services of a contractor to furnish labor and materials to replace the Oregon Road Bridge. Addendum #1: Please use the See What Changed link to view all the changes made by this addendum. Addendum #2: Scope is Attachment G Attachments: Attachment_G-_L079-0004_Special_Provisions.pdf