CA NP KICA PMS(1), Pavement Preservation Kica Cedar Grove

Active
69056726R000018Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The CA NP KICA PMS(1) project focuses on pavement preservation within the Cedar Grove area of Kings Canyon National Park in California. This Firm-Fix-Price Task Order Contract involves a base schedule of 14.70 miles of pavement preservation and parking areas, with an additional option for 0.84 miles of asphalt overlay. The estimated price range for the work is between 2,000,000 and 5,000,000 dollars, with a tentative completion date set for Fall 2027. The project will be solicited through the Western Region Pavement Preservation MATOC and is anticipated to be issued in Fall or Winter 2026. Managed by the Department of Transportation's Western Federal Lands Division, the contract falls under NAICS code 237310. Interested parties can access preliminary plans and solicitation documents via SAM.gov.

General Info

Firm-Fix-Price pavement preservation in Kings Canyon National Park, $2-5M, completing Fall 2027.

NAICS

237310 - Highway, Street, and Bridge Construction

Place of Performance

CA, USA

Set-Aside

NONE

Documents

3
PDF, High priority: read this firstplans
High
PDF, High priority: read this firstsow
High
PDF, Low prioritypresolicitation
Low

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhasePresolicitation
Posted

Presolicitation

Ready to pursue this opportunity?

Get full access to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyDepartment Of Transportation → 690567 Western Federal Lands Division
Contacts1 person available
OfficeVANCOUVER, WA, 98661, USA
Office AddressVANCOUVER, WA, 98661, USA
Contacts

Full Description

Show more

PROJECT: CA NP KICA PMS(1), Pavement Preservation Kica Cedar Grove


LOCATION: All project work is in Kings Canyon National Park – Cedar Grove area. The approximate latitude and longitude coordinates for the project are: 36°47'26.13"N, 118°40'4.53"W.


WORK: This project consists of pavement preservation. See “Project Description”posted under Attachments for additional details.


LENGTH: Base Schedule consists of 14.70 miles of pavement preservation and parking areas. Option Xconsists of 0.84 miles of asphalt overlay.


TENTATIVE COMPLETION DATE: Fall 2027


CONTRACT TYPE: Firm-Fix-Price Task Order Contract


ESTIMATED PRICE RANGE: Between $2,000,000 and $5,000,000


INTERESTED VENDORS LIST: To view the Interested Vendors List, you must register as a SAM user, be logged in, and linked to an entity. If you are signed into SAM.gov with your registered entity and you cannot see the Interested Vendors List, you will need to be assigned the Contract Opportunities Administrator role for your entity in SAM.gov. If you need assistance, go to https://www.fsd.gov/gsafsd_sp.


NOTICE OF SUBCONTRACTING OPPORTUNITY:


This project will be solicited to the Western Region Pavement Preservation MATOC.Contractor Information on the IDIQ contractor may be found on our web site at: https://highways.dot.gov/federal-lands/business/construction-contracting-idiq/west-region pavement-pres


This project is anticipated to be solicited in Fall/Winter 2026


This project includes a Base Schedule and one Option Schedule (X).


PRELIMINARY PLANS are in electronic format only and are posted with this synopsis. To ensure you receive notification when the solicitation documents are posted toSAM.gov, please click on the “follow” but-ton at the top of the opportunity page. When solicitation documents are issued, the REQUEST FOR PROPOSAL (specifications and plans) will be posted at this link.

Similar Contracts

Same NAICS industry code

More opportunities from Department Of Transportation → 690567 Western Federal Lands Division

Same awarding agency

NAICS: 237310
New
Federal
AK FLAP ANCHORAGE 2021(1), Far North Bicentennial Park Enhancements
Solicitation # 69056726B000012
The Far North Bicentennial Park Enhancements project, managed by the Department of Transportation's Western Federal Lands Highway Division, involves construction along the North Gasline Trail approximately five miles east of Anchorage, Alaska. This sealed bid, firm-fixed-price contract has an estimated price range between $700,000 and $2,000,000, with a tentative completion date of Fall 2027. The scope of work is divided into a base schedule and one option. The base schedule includes the construction of an 80-foot single span prefabricated steel pedestrian bridge over Campbell Creek and a 61-foot boardwalk, along with trail aggregate and turf establishment. Option Z provides for the construction of an additional 51-foot boardwalk. Technical requirements specify adherence to FP-24 Standard Specifications for Construction of Roads and Bridges on Federal Highway Projects and AASHTO design standards for seismic and pedestrian live loads. Key material specifications include epoxy-coated reinforcing steel, high-strength low alloy structural steel, and Douglas Fir timber treated according to AWPA standards. Contractors must provide weed-free certification for all commercial borrow and aggregate materials. The project is offered for full and open competition on an unrestricted basis, with formal solicitation documents expected in winter 2026/2027.
Highway, Street, and Bridge Construction

POSTED

3 days ago

DEADLINE

in 30 days
View Details
NAICS: 237310
New
Federal
WA ERFO NPS OLYM 2022-1(3), OLYMPIC NPS ERFO REPAIRS 2022 Road 107 MP 0.3 TO 0.5 & MP 0.8
Solicitation # 69056727B000002
Solicitation 69056727B000002 is a full and open invitation for bids for a firm fixed-price construction project involving emergency repairs on Road 107 at mileposts 0.3 to 0.5 and 0.8 within Olympic National Park, Washington. Managed by the Federal Highway Administration Western Federal Lands Division, the project focuses on bank stabilization and embankment work along the Hoh River Road. The scope of work includes the installation of riprap, engineered log jams with dolosse, willow staking, and the construction of a temporary river diversion dam. All work must adhere to the FP-24 Standard Specifications for Construction of Roads and Bridges on Federal Highway Projects and specific AASHTO material standards. The estimated value of the project ranges between 2 million and 5 million dollars, with bids required across two separate schedules, A and B. The performance period is expected to begin within 10 calendar days of the notice to proceed, with a projected completion date of September 13, 2027, assuming a start date of January 25, 2027. Bidders must provide a valid Standard Form 24 bid bond, and the successful awardee will be required to furnish performance and payment bonds. A 10 percent price evaluation factor will be applied to apparent low bids from large businesses if a bid is received from a HUBZone small business. Bids must be manually signed and submitted by the December 3, 2026, deadline, as facsimile and email submissions are prohibited.
Highway, Street, and Bridge Construction

POSTED

3 days ago

DEADLINE

in about 1 month
View Details
NAICS: 237310
New
Federal
WA NP OLYM 12(8), Hurricane Ridge Rockfall Mitigation MP 9.4
Solicitation # 69056726B000010
Solicitation 69056726B000010 is an Invitation for Bids for the Hurricane Ridge Rockfall Mitigation MP 9.4 project located in Olympic National Park, Clallam County, Washington. Managed by the Department of Transportation's Federal Highway Administration Western Federal Lands Division, the project involves the construction of a rockfall mitigation system approximately 11 miles south of Port Angeles. The estimated contract value ranges between 2,000,000 and 5,000,000 dollars, with a tentative completion date set for Fall 2027. The scope of work includes survey and staking, quality control, clearing and grubbing, excavation, embankment, retaining walls, and the installation of roadside rockfall protection fencing. Specifically, the project requires the use of Natina Steel weathering agent and the RXE-8000 flexible rockfall barrier system. This is a total small business set-aside procurement. Bids must be submitted in sealed envelopes to the FHWA office in Vancouver, Washington, by the revised deadline of November 13, 2026. A valid Standard Form 24 bid bond is required for submission. The contract is subject to the Davis-Bacon Act for wage requirements and the Buy American Requirement for construction materials. Award will be granted to the responsible bidder whose conforming bid is determined to be most advantageous to the government, based primarily on price and price-related factors. Contractors are required to use the government's Masterworks web-based system for daily reports and measurement notes, and are prohibited from using audio/video recording or AI note-taking during official meetings.
Highway, Street, and Bridge Construction

POSTED

3 days ago

DEADLINE

in 12 days
View Details
NAICS: 237310
New
Federal
MT NP GLAC 14(5), Many Glacier Road Landslides
Solicitation # 69056726B000015
The MT NP GLAC 14(5) project involves the reconstruction of approximately 2.55 miles of roadway on Many Glacier Road in Glacier County, Montana, located about four miles west of Babb. Managed by the Department of Transportation's Western Federal Lands Division, the scope of work includes excavation, subgrade stabilization, the placement of roadway aggregate and asphalt concrete pavement, and the construction of rock buttressing, riprap revetments, drainage improvements, and utility infrastructure. The project also includes a specific option for utility relocation. The estimated price range for the contract is between 20 million and 30 million dollars, with a tentative solicitation date in winter 2027 and a fixed completion date for both the base work and utility relocation option set for summer 2029. Technical requirements include the installation of 47,300 linear feet of horizontal drain pipe, 470 linear feet of inclinometer casing, and five piezometers with data loggers. Strict environmental compliance is required, necessitating noxious weed and non-native invasive species inspections for all material sources, including specific pits operated by Spoklie's, LaSalle, Sandry Construction, and Schedllinger. Operational mandates include the use of pilot cars with specific signage and contractor identification, as well as strict prohibitions against storing equipment or materials in designated buffer spaces. The project falls under NAICS code 237310 and is currently listed as a presolicitation with no set-aside used.
Highway, Street, and Bridge Construction

POSTED

4 days ago

DEADLINE

N/A
View Details
NAICS: 237310
New
Federal
ID FLAP KOOTEN 8450(1), Yellowstone Trail Road, Segment 1
Solicitation # 69056726R000019
Solicitation 69056726R000019 is a firm fixed-price task order request for proposals issued by the Federal Highway Administration Western Federal Lands Division for the Yellowstone Trail Road, Segment 1 project in Kootenai County, Idaho. Located in the Coeur d'Alene National Forest, the 0.20-mile project involves roadway realignment and reconstruction, the installation of a new single-span precast prestressed concrete structure, and rock-mass stabilization. The estimated price range for the work is between 2 million and 5 million dollars, with a tentative completion date in Fall 2027 and an assumed notice to proceed date of January 12, 2027. This is a restricted MATOC solicitation, meaning proposals will only be accepted from six specific prime contractors: ASCORP Inc (DBA Debco Construction), Granite Construction, Hamilton Construction, M.A. Deatley Construction, MJ Hughes Construction, and Thompson Contracting. Award will be based on the best value, primarily focusing on the lowest price among responsible offerors. The project must adhere to the Standard Specifications for Construction of Roads and Bridges on Federal Highway Projects (FP-24) and requires strict compliance with various Federal Acquisition Regulation clauses regarding labor standards, equal opportunity, and material workmanship.
Highway, Street, and Bridge Construction

POSTED

4 days ago

DEADLINE

in 12 days
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS