Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Combined Synopsis/Solicitation opportunity from Department Of Defense was posted on September 17, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Caesar Creek Lake Dike Gravel Overlay

Closed
W912QR26QA111Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237310
New
North Hollywood Central Remediation Well Collector Line; IFB No. 8003R1
Solicitation # 8003R1
Kiewit Infrastructure West Co. is soliciting sub-quotes for the North Hollywood Central Remediation Well Collector Line project, an Invitation for Bid (IFB No. 8003R1) for the City of Los Angeles Department of Water and Power. Located in California, the project encompasses a broad range of civil infrastructure and construction services. The scope of work includes site preparation tasks such as land surveying, site clearing, subsurface investigation, and storm water pollution prevention, as well as heavy construction activities including tunneling, boring, jacking, micro tunneling, and utility installation. Additional requirements cover finishing work such as asphalt paving, landscaping, and the installation of traffic signs, signals, and lighting, along with the supply of ready mix, precast concrete, and aggregate. This opportunity is set aside for Small Businesses, including SBA certified Women-Owned Small Businesses and Disadvantaged Business Enterprises. To be considered responsive, bidders must possess a valid California Contractor's license and provide acceptable insurance. Furthermore, responsible subcontractors and material contractors are required to provide bonding for 100 percent of their contract value, for which Kiewit will reimburse the premiums. Kiewit also emphasizes the importance of labor harmony and notes its status as a signatory to several collective bargaining agreements. Interested firms must submit their responses via the Building Connected system by the bid deadline of November 18, 2025.
Kiewit Infrastructure West Co.

POSTED

about 5 hours ago

DEADLINE

in 20 days
NAICS: 237310
New
SLED
Tustin Legacy Linear Park - Phase 3 Between Armstrong to Warner (CIP No. 20083)
Solicitation # CIP 20083
The Tustin Legacy Linear Park - Phase 3 Between Armstrong to Warner (CIP No. 20083) is a public works solicitation by the City of Tustin, California, for the construction of park infrastructure. The scope of work includes site excavation, plumbing, electrical, instrumentation, street improvements, and the installation of a 12-foot multi-modal path and a 6-foot walking trail. The project has an engineer's estimate of 11,100,000 dollars and a project schedule of 190 contract days. Bidders must hold a Class A contractor's license and submit their proposals via the OpenGov portal by December 10, 2026, at 2:00pm. A critical requirement for responsiveness is the submission of the bid bond both as an electronic upload and as a hard copy delivered to the City Clerk. The contract will be awarded to the low bidder based on the total sum of correctly calculated unit prices. The successful contractor must provide a project baseline schedule within 15 calendar days of execution and adhere to strict safety and quality standards, including Cal-OSHA requirements for qualified persons working near utilities and 2008 ADA Standards for Accessibility. Payment is structured as monthly progress payments at 95 percent of the work value, with the final 5 percent retained until 60 days after the recordation of the Notice of Completion. Liquidated damages are set at 8,800 dollars per calendar day for delays. Required post-award documentation includes payment, faithful performance, and guaranty bonds, as well as a compensation insurance certificate.
Public Works

POSTED

about 10 hours ago

DEADLINE

in about 1 month
NAICS: 237310
New
SLED
CITB 2026C045
Solicitation # 2026C045
Invitation to Bid No. 2026C045 is issued by the Municipality of Anchorage for the Old Seward Highway Surface Rehabilitation project, Phase 2, spanning from International Airport Road to Tudor Road. With an estimated construction cost between 3 million and 5 million dollars, the scope of work includes asphalt pavement rehabilitation, sidewalk and curb replacement, storm drain improvements, and the treatment of contaminated soils. The project requires the contractor to provide all labor, equipment, and materials, adhering to the 2024 Municipality of Anchorage Standard Specifications and various state and national traffic and electrical codes. Key deliverables include the installation of inlaid traffic markings, flexible delineators, and the coordination of access for adjacent businesses and school bus routes. The bidding process requires the submission of sealed paper bids to the MOA Purchasing Department by 2 PM local time on November 5, 2026, as electronic submissions are not accepted. Bidders must provide a bid bond, valid state and municipal contractor licenses, and a SAM report. The contract will be awarded to the responsible bidder who submits the lowest responsive bid, with preferences available for local and veteran bidders. Awardees must comply with a Community Workforce Agreement and prevailing wage requirements. Environmental compliance is critical, as work in Campbell Creek requires a Fish Habitat Permit and is subject to inspection by the U.S. Army Corps of Engineers, while soil testing must follow specific EPA and ADEC protocols for lead contamination.
Municipality of Anchorage

POSTED

about 11 hours ago

DEADLINE

in 8 days
NAICS: 237310
New
SLED
Parking Lot E8 Repairs
Solicitation # CSULBSOQ80
The Parking Lot E8 Repairs project (Project Number PE825PK023) at California State University, Long Beach, involves the complete removal of existing four-inch asphalt pavement and the upper 18 inches of soil, including cement-treated soil. The scope of work requires the installation of new asphalt over non-expansive fill compacted to at least 95 percent relative compaction, as well as the installation of one new EV charging station and the conversion of nine EV-ready stalls to full charging capability. The owner's construction estimate for this public works project is 3,700,000 dollars, with anticipated construction occurring between April 1 and July 30, 2027. Bidders must hold a valid California contractor's license in either the C-12 or B classification and must be prequalified through the PlanetBids portal. A mandatory site walk was scheduled for November 16, 2026, and sealed bid proposals are due by 2:00 p.m. on December 16, 2026. The project is subject to prevailing wage rate laws, requiring all contractors and subcontractors to be registered with the Department of Industrial Relations. Additionally, the project will be enrolled in the CSU Builders Risk Insurance Program and potentially the Owner-Controlled Insurance Program. Award will be based on the lowest responsive and responsible bid, with specific incentives provided for Disabled Veteran Business Enterprise (DVBE) participation. While a minimum of 3 percent DVBE participation is required, incentives ranging from 1 to 3 percent are available for participation levels between 4 percent and 6 percent or more, subject to a 50,000 dollar cap when combined with Small Business Preferences and a total cumulative adjustment limit of 100,000 dollars.
Purchasing Office Department of California State University, Long Beach

POSTED

about 13 hours ago

DEADLINE

in about 2 months

AI Contract Overview

Show more

The Caesar Creek Lake Dike Gravel Overlay project, managed by the W072 Endist Louisville office of the Department of Defense, involves the application of #57 crushed limestone gravel to access roads at Caesar Creek Lake in Waynesville, Ohio. The scope is divided into a base contract for Dike A, covering approximately 50,000 square feet, and an optional component for Dike B, covering approximately 33,000 square feet. The contractor is responsible for providing all labor, materials, equipment, and PPE to ensure the gravel is spread at a depth between 2 and 3 inches, resulting in a uniform, level surface that fills all existing potholes and divots. Per Amendment 0001, the government will mechanically grade and level the access roads prior to the commencement of contractor work. This procurement is a 100% small business set-aside under NAICS 237310, with an estimated project magnitude between $25,000 and $100,000. Work must commence within 14 calendar days of the notice to proceed and be completed within 90 calendar days. In lieu of standard performance and payment bonds, the contract requires only a payment bond or an irrevocable letter of credit. The project is subject to Davis-Bacon Act wage determinations and requires strict adherence to EM 385-1-1 safety standards, including a mandatory pre-work conference. All offers must be submitted electronically via the PIEE Solicitation Module by the specified deadline.

General Info

DoD project for crushed limestone gravel application on Caesar Creek Lake access roads.

NAICS

237310 - Highway, Street, and Bridge Construction

Place of Performance

Caesar Creek Lake 4020 N. Clarksville Rd. Waynesville, OH 45068, Waynesville, OH, 45068, USA

Set-Aside

SBA

Documents

11

Caesar Creek Lake Dike A Gravel Overlay SOW

PDF, High priority: read this firstsow
High

Caesar Creek Lake Dike Gravel Overlay SOW

PDF, High priority: read this firstsow
High

OH20260001 Wage Determination (Heavy/Highway)

PDF, High priority: read this firstwage-determination
High

PIEE Instructions for Electronic Proposal Submission

PDF, High priority: read this firstinstructions
High

Price Breakout Schedule - Caesar Creek Lake Dike Gravel Overlay

PDF, High priority: read this firstsow
High

RFQ Special Instructions - Caesar Creek Lake Dike Gravel Overlay

PDF, High priority: read this firstrfq
High

W912QR26QA1110001 Amendment 0001

PDF, High priority: read this firstamendment
High

W912QR26QA111 Caesar Creek Lake Dike Gravel Overlay - Additional Clauses and Provisions

PDF, High priority: read this firstspecifications
High

W912QR26QA111 Caesar Creek Lake Dike Gravel Overlay IFB

PDF, High priority: read this first68 pages · ifb
High

Representations & Certifications

PDF, Low priority1 page · representations-and-certifications
Low

W912QR26QA111 ProjNet Instructions

PDF, Low priorityother
Low

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

1 update
PhaseClosed
Posted

Combined Synopsis

Notice updated

The notice description changed.

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → W072 Endist Louisville
Contacts1 person available
OfficeLOUISVILLE, KY, 40202-2230, USA
Office AddressLOUISVILLE, KY, 40202-2230, USA
Contacts

Full Description

Show more

PROJECT TITLE: CAESAR CREEK LAKE DIKE GRAVEL OVERLAY


PROJECT LOCATION: CAESAR CREEK LAKE, 4020 N. CLARKSVILLE RD., WAYNESVILLE, OH


CONTRACTOR WILL PROVIDE ALL MATERIALS, EQUIPMENT, PPE AND LABOR TO SPREAD GRAVEL ALONG CAESAR CREEK DIKE A ACCESS ROAD (BASE CONTRACT) AND DIKE B ACCESS ROAD (OPTION 1). THE CONTRACTOR SHALL EVENLY DISTRIBUTE #57 CRUSHED LIMESTONE GRAVEL AT A DEPTH OF AT LEAST 2 INCHES AND NO MORE THAN 3 INCHES. THE GRAVEL MUST BE UNIFORMED AND LEVEL IN APPEARANCE FILLING ALL EXISTING POTHOLES AND DIVOTS. DIKE A IS APPROXIMATELY 50,000 SQUARE FEET AND DIKE B IS APPROXIMATELY 33,000 SQUARE FEET.


DISCLOSURE OF THE MAGNITUDE OF THE CONSTRUCTION PROJECT: BETWEEN $25,000 AND $100,000.


THIS PROCUREMENT IS 100% SET-ASIDE FOR SMALL BUSINESS UNDER NAICS 237310, SIZE STANDARD $45,000,000.00.


IN LIEU OF BOTH PERFORMANCE AND PAYMENT BONDS, PER RFO 52.228-13 ALTERNATIVE PAYMENT PROTECTIONS (2000) AND RFO 28.102-1(B), ONLY A PAYMENT BOND OR IRREVOCABLE LETTER OF CREDIT IS REQUIRED.



***Amendment 0001***


The Statement of Work (SOW) file has been revised with the following statement, Prior to the commencement of contractor work, the Government will prepare the site by mechanically grading and leveling the access roads for Dike A and Dike B. The revised SOW has been attached to this solicitation and replaces the previous version. The offeror due date remains unchanged. All other terms and conditions remain unchanged.


***Amendment 0001***

More opportunities from Department Of Defense → W072 Endist Louisville

Same awarding agency

NAICS: 237110
New
Federal
Design-Bid-Build - Rough River Lake Axtel Wastewater Treatment Plant (WWTP)
Solicitation # W912QR27BA003
Solicitation W912QR27BA003 is a Design-Bid-Build project for the demolition and construction of the Axtel Wastewater Treatment Plant (WWTP) at Rough River Lake in McDaniels, Kentucky. The scope of work requires the contractor to remove the existing WWTP and fencing and install a new Aerobic Treatment Unit (ATU) and Drip Field System. This unrestricted procurement is estimated to have a construction magnitude between 1 million and 5 million dollars, with the award based on the lowest evaluated price. A 10 percent price evaluation preference will be applied to eligible HUBZone small business concerns. The contract is a Firm-Fixed-Price agreement under NAICS code 237110, with a total project duration of 400 calendar days from the Notice to Proceed. Performance is scheduled from December 18, 2026, to January 22, 2028, with a requirement to commence work within 10 calendar days of the notice. Key requirements include the submission of a Construction Quality Control (CQC) plan within 30 days of the notice to proceed, adherence to Davis-Bacon Act wage rates, and the provision of a Site Safety Health Officer. Liquidated damages for delays are set at 500 dollars per calendar day. Proposals must be submitted electronically via the PIEE Solicitation Module by the December 3, 2026, deadline.
Water and Sewer Line and Related Structures Construction

POSTED

2 days ago

DEADLINE

in about 1 month
View Details
NAICS: 237110
New
Federal
Request for Information/Market Intelligence Notice: Use of Progressive Design Build (PDB) with Other Transaction Authority (OTA) - Fort Hunter-Liggett Water System Improvements
Solicitation # W912QR-PDB-FHLWATER
The U.S. Army Corps of Engineers, Louisville District, is seeking market intelligence through a Request for Information for the restoration and modernization of potable water and wastewater collection systems at Fort Hunter Liggett. With an estimated acquisition magnitude of 70 to 80 million dollars, the project scope includes the design and construction of a new tank farm with at least 2 million gallons of storage, a new transmission main, upgrades to water supply wells, modernized SCADA infrastructure, and the rehabilitation of sanitary sewer lines and treatment plant lagoons. All work must adhere to NSPC, UFC, and NFPA criteria to address aging infrastructure and operational deficiencies. The government is evaluating a Progressive Design Build strategy utilizing an Other Transaction Agreement under 10 U.S.C. section 2808a. This proposed approach would involve a qualifications-based selection process consisting of a statement of qualifications and pitch meetings. The award would be structured in two phases: an initial design and pre-construction phase followed by a construction phase based on an agreed-upon Guaranteed Maximum Price. Interested parties under NAICS code 237110 must submit their company profiles, collaborative delivery experience, and technical feedback via the designated online survey form by November 3, 2026.
Water and Sewer Line and Related Structures Construction

POSTED

3 days ago

DEADLINE

in 5 days
View Details

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS