Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, September 30 at 2:00 PM EDT

Register Free →

Cal Water Well Project

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The Cal Water Well Project, managed by the City of Livermore in California, involves a Conditional Use Permit Modification (CUPM26-001) and a Site Plan Design Review Modification (SPDRM25-012). The scope of work focuses on the installation of a new drinking water well and associated treatment facility improvements, which include site grading, the relocation of a generator, the installation of site piping, and the construction of a reinforced concrete retaining wall. This project is classified as a forecast and is located in Livermore, California, 94551. A Notice of Exemption was approved on September 15, 2026, asserting a Categorical Exemption under CEQA Guidelines Section 15301, as the work consists of minor modifications to existing utility infrastructure. Primary points of contact for the project include Assistant Planner Emily LaDue for the City of Livermore and Project Manager Bryce Reed for California Water Service.

General Info

City of Livermore project for new drinking water well and treatment facility improvements.

Agency

California → City of Livermore

NAICS

237110 - Water and Sewer Line and Related Structures ConstructionView NAICS

Place of Performance

Livermore, CA, 94551

Set-Aside

NONE

Documents

(1)

CUPM26-001 Cal Water Well Project - Notice of Exemption

PDFspecial-notice

AI Contract Breakdown

Uniform Contract Format

What is UCF?

Uniform Contract Format (UCF) uses AI to break down any contract into standardized sections—scope, pricing, deliverables, and evaluation criteria.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → City of Livermore
Contacts2 people available
OfficeN/A
Organization / Agency
California → City of Livermore
Office AddressN/A
Contacts
Emily LaDueAssistant Planner
Bryce ReedProject Manager

Full Description

Show more
A Conditional Use Permit Modification (CUPM26-001) and Site Plan Design Review Modification (SPDRM25-012) for a California Water Service (Cal Water) new drinking water well and associated improvements for a treatment facility, including site grading, generator relocation, site piping and a reinforced concrete retaining wall.

Similar Contracts

Same NAICS industry code

NAICS: 237110
New
Inland Feeder/SBVMWD Foothill PS Intertie, Stage 1
Solicitation # inland-feedersbvmwd-foothill-ps-intertie-stage-1
The Inland Feeder/SBVMWD Foothill PS Intertie, Stage 1 project in Highland, California, involves the installation of extensive water infrastructure for the Metropolitan Water District of Southern California. The scope of work includes furnishing and installing approximately 2,150 linear feet of 54-inch to 66-inch diameter steel pipe and 200 linear feet of 144-inch diameter steel pipe. The project requires the installation of both contractor-furnished and Metropolitan-furnished valves, including 54-inch and 132-inch diameter valves and tie-ins ranging from 54 to 145.5 inches. Additional structural requirements include the construction of four surge tanks, two valve vaults, an air compressor yard structure, and various drainage improvements. The technical scope further encompasses electrical upgrades, instrumentation and controls, piping systems, and specialized civil works such as the excavation of cobbles and large boulders, welding, disinfection, and surface restoration. This solicitation, issued by James W. Fowler Co., is open to small businesses, including SBA-certified service-disabled veteran-owned small businesses, minority business enterprises, and women business enterprises. Bids and subcontractor pricing must be submitted by September 29, 2026, with all negotiations finalized 24 hours prior to the bid opening. The project encourages the use of apprentices and provides specific support for M/W/DBE subcontractors regarding bonding, insurance, and material procurement.
James W. Fowler Co.

POSTED

about 12 hours ago

DEADLINE

in 10 days
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS