Calero Valve Yard Geotechnical Borings and Utility Potholing
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
AI Contract Overview
The project involves geotechnical drilling and utility potholing to support the final design of the Calero Dam Seismic Retrofit Project, with activities centered at the Calero Valve Yard near San Jose, California. Three boreholes will be drilled to a maximum depth of 25 feet using a truck-mounted hollow stem auger, accompanied by a 100-foot trench excavation along the same alignment. All borings will be properly backfilled with a cement bentonite grout mixture in compliance with Valley Water Well Ordinance standards. Simultaneously, four hydrovac potholes will be excavated near the Almaden Valley Pipeline to verify the configuration of its concrete encasement, which is critical for relocating an existing valve vault box as part of the retrofit. All disturbed areas will be restored using native excavated material and compacted to original conditions. Approximately 1500 square feet of ruderal vegetation will be impacted during the work, which is expected to be completed in six total days. The project is managed by the Santa Clara Valley Water District, with Abby Annicchiarico serving as the primary point of contact for environmental planning and coordination.
General Info
Agency
NAICS
Place of Performance
San Jose, CASet-Aside
Documents
(1)AI Contract Breakdown
Uniform Contract FormatWhat is UCF?
Uniform Contract Format (UCF) uses AI to break down any contract into standardized sections—scope, pricing, deliverables, and evaluation criteria.
Timeline
Organization & Contact Information
Full Description
Similar Contracts
Same NAICS industry code
