California Endangered Species Act Incidental Take Permit No. 2081-2022-064-04 for the eTS 58713.01 Line 85 Milepost 75.85 Remediation Digs Project

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The California Department of Fish and Wildlife issued an amended Incidental Take Permit to Southern California Gas Company for activities related to the inspection, repair, and integrity enhancement of Line 85 near Milepost 75.85 in Kern County, California. The permit authorizes the incidental take of three state-listed species: the endangered Tipton kangaroo rat, and the threatened San Joaquin antelope squirrel and San Joaquin kit fox, under the California Endangered Species Act. The project involves repairing five pipeline segments, installing cathodic protection systems, constructing a new concrete pad for a cabinet rectifier, rerouting and burying a former gas tap to restore cathodic protection, and expanding Work Area 6 to accommodate additional laydown and parking space. The permit amendment extends the expiration date by six months and adds eighteen months to complete habitat mitigation requirements, while the overall habitat impact remains unchanged, with temporary disturbance to 0.76 acres and permanent impact limited to a negligible 2.67 square feet. All activities occur within existing disturbed areas and previously approved project boundaries, avoiding new habitat conversion. The project is exempt from the California Environmental Quality Act under the categorical exemption for emergency repairs and maintenance. The permit holder must comply with all conditions outlined in the permit, including monitoring, reporting, and mitigation measures, and all actions are subject to oversight by the California Department of Fish and Wildlife’s Central Region based in Fresno. Project coordination is managed by Sarah Bahm and Chloe Phan, who serve as the primary environmental and project contacts, respectively. No federal procurement clauses, pricing details, or contract administration structures are present, as this is a state environmental permit rather than a federal acquisition contract.

General Info

Amended permit allows Southern California Gas Company to repair Line 85 with incidental take of three state-listed species under CESA.

Agency

California → Fish and Wildlife, Region 4 - Central, Fresno

NAICS

237120 - Oil and Gas Pipeline and Related Structures ConstructionView NAICS

Place of Performance

Taft, CA

Set-Aside

NONE

Documents

(2)

Notice of Exemption for CESA Amended Incidental Take Permit No. 2081-2022-064-04 Major Amendment No. 5

PDFnotice-of-exemption

Amended Incidental Take Permit No. 2081-2022-064-04 Major Amendment No. 7

PDFamendment

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

1 update
Posted

forecast

Amendment 1

Contract was updated

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → Fish and Wildlife, Region 4 - Central, Fresno
Contacts2 people available
OfficeN/A
Organization / Agency
California → Fish and Wildlife, Region 4 - Central, Fresno
Office AddressN/A
Contacts
Sarah BahmSenior Environmental Scientist (Specialist)
Chloe PhanProject Manager

Full Description

Show more
The California Department of Fish and Wildlife (CDFW) has issued an amended ITP (No. 2081-2022-064-04-A7), to authorize SoCalGas (Permittee) to incidentally take Tipton kangaroo rat (Dipodomys nitratoides nitratoides) which is as an endangered species under CESA, San Joaquin antelope squirrel (Ammospermophilus nelsoni) which is designated as a threatened species under CESA, and San Joaquin kit fox (Vulpes macrotis mutica) which is designated as a threatened species under CESA (Fish & G. Code § 2050 et seq.; see Cal. Code Regs., tit. 14, § 670.5, subd. (a)(6)(D), (b)(6)(B), and (b)(6)(E), respectively). Collectively, these are referred to as the Covered Species. The Project includes activities necessary to inspect and repair five segments of the 26-inch natural gas pipeline (Line) 85 near MP 75.85 where anomalies were identified and to install cathodic protection for integrity and safety of the pipeline. This Amended ITP (Major Amendment No. 7) extends the expiration date for an additional 6 months, extends the timeline to complete the HM Lands requirement by an additional 18 months, expands Work Area 6 from 1,500 square feet (0.034 acre) to 3,375 square feet (0.077 acre) to accommodate an additional laydown area and parking area, installs a new concrete pad for the new cabinet rectifier, reroutes and buries the existing gas tap that served the former TEG to connect to the new TEG to restore cathodic protection and maintain pipeline integrity within the approved Project Area, and revises Figure 6a. The resulting impacts of the Project to the Covered Species remain the same. The Project will result in temporary impacts to 0.76 acres of Covered Species habitat and permanently impacts to 2.67 square feet (0.000061 acre) of habitat for the Covered Species. Covered Species may disperse across the 1.23-acre disturbed/developed area (existing unvegetated, compacted dirt roads), which may be disrupted while Project activities are occurring, but these areas do not provide other habitat values for the Covered Species. The project is expected to result in incidental take of the Covered Species. The ITP referenced above as issued by CDFW authorizes incidental take of species listed under CESA that may occur as a result of Project implementation.

Similar Contracts

Same NAICS industry code

NAICS: 237120
New
SLED
Alturas Wastewater Treatment Plant Improvement Project
Solicitation # EPIMS-MOD-63461-R1
The City of Alturas is undertaking infrastructure improvements to enhance its wastewater management system by installing a new pipeline that will transport raw wastewater to offsite treatment ponds and land application areas. To minimize environmental disruption, the project employs horizontal directional drilling beneath three water bodies—the North Fork Pit River, South Fork Pit River, and an unnamed ephemeral tributary—each requiring a bore approximately 3,000 feet in length at depths between 60 and 80 feet. This approach avoids direct excavation within streambeds and reduces impacts on aquatic habitats. The project has been authorized under a Lake and Streambed Alteration Agreement issued by the California Department of Fish and Wildlife, in compliance with Fish and Game Code section 1602, ensuring regulatory oversight and environmental safeguards are met during construction. The initiative is part of broader efforts to modernize Alturas’s wastewater infrastructure, promoting public health and environmental stewardship by diverting untreated effluent from local waterways. The City of Alturas serves as the project applicant and primary point of contact, with Warren Farnam listed as the primary planner and Dyana Judnick of the California Department of Fish and Wildlife serving as the environmental scientist overseeing regulatory compliance. The project was forecasted for future consideration on June 10, 2026, and all activities are confined to the city’s jurisdiction in Modoc County, California, with no federal funding or set-aside provisions identified. The alignment and drilling methodology reflect a commitment to minimizing surface disturbance while achieving functional wastewater conveyance goals.
City of Alturas

POSTED

1 day ago

DEADLINE

N/A
View Details
NAICS: 237120
New
Federal
DESC2103C - Bulk Fuel Storage Tanks Phase II, Yokota Air Base, Japan
Solicitation # W912HV26RA009
The U.S. Army Corps of Engineers, Japan District is preparing to solicit bids for the construction of a new 100,000-barrel cut-and-cover JP-8 bulk fuel storage tank at Yokota Air Base, Japan, under project title DESC2103C Phase II. The project includes the installation of a reinforced concrete pump house on top of the tank housing four 600-gpm issue pumps and one 50-gpm water draw-off pump, along with a high-level valve, independent level alarms, and a fully integrated automatic tank gauging system connected to the existing filter separator building’s control infrastructure. Additional components include piping, valves, vaults, a product saver tank, and a steel tank with a concrete outer wall and rolling cover for equipment access, all topped with a low-slope concrete roof featuring built-up roofing and overhangs. The total project value is estimated between ¥2.5 billion and ¥10 billion Japanese yen, classified under NAICS code 237120 for oil and gas pipeline and related structures construction. The contract will be awarded as a firm-fixed-price construction agreement using the Lowest Price Technically Acceptable source selection method. Only local sources physically located and licensed to perform construction in Japan are eligible to bid; U.S.-based contractors without local presence will not be considered. Offerors must hold a valid Japanese civil or architectural construction license, verifiable through the Ministry of Land, Infrastructure, Transport and Tourism’s website, and must be registered in both the System for Award Management (SAM) and as a Joint Venture entity if applicable. Solicitation is anticipated in August 2026 with proposals due by August 31, 2026, and all submissions must be made electronically through the Procurement Integrated Enterprise Environment (PIEE) Solicitation Module. All amendments and updates will be posted to SAM.gov and PIEE, and it is the offeror’s responsibility to monitor for changes. No United States Official Contractor status under the U.S.-Japan Status of Forces Agreement will be extended to contractors normally resident in the United States. Contract performance is required entirely within Japan, and compliance with all Japanese laws, labor standards, and regulations is mandatory.
W2SN Endist Japan

POSTED

2 days ago

DEADLINE

in 5 months
View Details