Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

Fuel Station Pump Repair

Active
FA440727RC001Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

General Info

NAICS

237120 - Oil and Gas Pipeline and Related Structures Construction

Place of Performance

Scott Air Force Base, IL, 62225, USA

Set-Aside

WOSB

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

PhaseSources Sought
Posted

Sources Sought

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Get full access to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → FA4407 375 Cons Lgc
Contacts2 people available
OfficeSCOTT AFB, IL, 62225-5015, USA
Office AddressSCOTT AFB, IL, 62225-5015, USA

Full Description

Show more

The 375th Contracting Squadron is performing Market Research to identify potential SBA-certified Women-Owned Small Businesses (WOSB) under NAICS 237120 (Oil and Gas Pipeline and Related Structures Construction) with the qualifications, licenses, and technical capabilities to perform electrical conduit repair, drop tube replacement, and overfill alarm installation across designated fueling facilities at Scott Air Force Base, IL. Please contact MSgt Nolan Strange, contact@example.gov or Mr. Jody Noram, contact@example.gov if you have any questions or concerns.


DISCLAIMER: This Sources Sought is issued solely for information and planning purposes. It does not constitute a Request for Proposal (RFP), Invitation for Bid (IFB), or Request for Quotation (RFQ), nor does it guarantee a future solicitation will be issued. The Government will not reimburse respondents for any costs associated with preparing or submitting information in response to this notice.


3. Capability Statement Submittal Requirements


Interested vendors possessing the required expertise, equipment, and certified personnel are invited to submit a Capabilities Statement (maximum 5 pages) addressing the following:


  1. Company Information: Company name, address, SAM Unique Entity Identifier (UEI), CAGE Code, Point of Contact (name, email, phone), and Socioeconomic status (e.g., 8(a), SDVOSB, WOSB, HUBZone, Small Business).

  2. Technical Capabilities & Experience: Summary of relevant past performance completed within the last three (3) years on underground storage tank (UST) fueling systems, conduit breakout/pour-back, overfill drop tube replacements, and Veeder-Root or automatic tank gauge (ATG) sensor/alarm installations.

  3. Licensing & Certifications: Confirmation that personnel hold required state/local UST service technician certifications, Veeder-Root certified installer/technician credentials, and applicable electrical licensing.

  4. Rough Order of Magnitude (ROM): Optional feedback on typical lead times, mobilization timeframes, and commercial pricing structure for tasks of this nature.


PART 2: STATEMENT OF WORK (SOW)


1.0 Objective & Overview


The Contractor shall furnish all necessary labor, supervision, materials, tools, equipment, testing apparatus, and transportation (except for specified Government/Owner-Furnished Equipment) to perform concrete breakout and conduit correction, electrical re-wiring, drop tube replacement, and overfill alarm installation across designated fueling facilities.


2.0 Detailed Scope of Work by Facility and Task


TASK AREA 1: Premium Tank Sump Conduit Repair & Electrical Remediation


The Contractor shall repair incorrectly poured conduit serving the Premium tank sump, complete necessary electrical re-pulls, and restore the concrete pad to original structural grade.


  1. Demolition & Concrete Breakout:


    • Precision sawcut and breakout existing concrete around the Premium tank sump to expose the buried conduit line.

    • Protect adjacent sump structures, lid seats, and underground utilities from collateral damage during breakout operations.

  2. Conduit Clearing & Realignment:


    • Cut apart the obstructed/incorrect conduit run and clear out concrete or foreign debris resulting from the prior incorrect pour.

    • Reconnect the conduit run using code-compliant, liquid-tight, fuel-resistant fittings and conduit rated for Class I, Division 1/2 hazardous fuel environments. Ensure proper pitch, sealing, and alignment.

  3. Electrical Wiring & Terminations:


    • Pull new electrical conductors/wiring from the main building panel/control area to the tank sub-unit junction box in accordance with the National Electrical Code (NEC/NFPA 70).

    • Terminate all wiring connections, verify seal-offs, and conduct comprehensive continuity, insulation resistance (megger), and operational tests to ensure proper equipment operation.

  4. Civil Restoration:


    • Backfill excavated trench using suitable aggregate, compacted in uniform lifts to match surrounding base compaction specifications.

    • Form and pour back high-early-strength concrete to match the existing grade, thickness, and finish of the fueling apron.


TASK AREA 2: Facility 6047806 – Tank 3 Drop Tube Replacement


The Contractor shall remove obsolete fill hardware and install a compliant drop tube assembly on Tank 3.


  1. Hardware Removal & Disposal:


    • Remove the existing fill adapter, fill cap, and drop tube assembly.

    • Safely load, manifest (if required), transport, and legally dispose of all obsolete components off-site in compliance with all local, state, and federal environmental regulations.

  2. Furnish & Install New Hardware:


    • Furnish and install one (1) new OPW overfill prevention drop tube (or Government-approved equal), one (1) new fill adapter, and one (1) new heavy-duty locking cap.

    • Special Technical Condition: Work assumes the existing drop tube is removable without structural failure and the existing spill container (spill bucket) remains sound and reusable. If the drop tube is seized or the spill bucket is found to be compromised/damaged, the Contractor shall immediately notify the Contracting Officer Representative (COR). Any required replacement of seized components or spill containers shall be evaluated and authorized via a formal bilateral change order prior to proceeding.

  3. Regulatory Compliance Verification:


    • Set and verify that the drop tube shutoff mechanism operates at the exact level mandated by 40 CFR Part 280 / state UST regulations (e.g., 95% tank capacity shutoff or 90% flow restriction).

  4. Deliverables & Documentation:


    • Document pre-work conditions, intermediate installation stages, and final configuration with high-resolution digital photographs.

    • Submit photos and completed compliance checklist with the final job completion paperwork.


TASK AREA 3: Facility 6047801 – Overfill Alarm Installation


The Contractor shall remove the existing overfill alarm and install owner-provided Veeder-Root monitoring hardware.


  1. Demolition:


    • Disconnect and remove the existing overfill alarm unit; transport and dispose of all removed scrap components off-site.

  2. Installation of Government/Owner-Furnished Equipment (GFE/OFE):


    • The Government/Owner will provide:


      • One (1) Veeder-Root Overfill Alarm (Part # 790091-001 / SKU: 790091-001)

      • One (1) Veeder-Root Universal Sensor Mounting Kit (Part # 330020-012 / SKU: 330020-012)

    • The Contractor shall furnish all certified labor, wiring, hardware, seals, and incidental consumables to properly mount, wire, and integrate the alarm with the existing automatic tank gauge (ATG) system.

  3. Testing & Commissioning:


    • Perform functional operational checkout of the Veeder-Root alarm and sensor assembly to verify positive alarm annunciation and correct signal communication to the console.

  4. Deliverables & Documentation:


    • Take detailed digital photographs of the completed installation, wiring junction, and console status screen indicating an operational, alarm-free condition.

    • Submit completion paperwork and test verification logs to the COR.


3.0 Site Cleanup, Waste Management & Housekeeping


  1. Debris Haul-Off: The Contractor shall continuously maintain a clean and safe work zone. Upon completion of each task, the Contractor shall collect, load, haul off, and legally dispose of all concrete rubble, excavated soils, cut conduit, old wiring, discarded drop tubes, and packaging debris.

  2. Hazardous Materials: Any fuel-wetted materials or petroleum rags generated during servicing shall be managed and disposed of in accordance with applicable RCRA and local environmental standards.


4.0 Submittals and Deliverables


Deliverable


Site Safety Plan & AHAs


Activity Hazard Analysis for sawcutting, confined spaces, and hazardous fuel zones


Technician Certifications


Veeder-Root certified technician & state UST licenses


With quote / proposal submittal


Drop Tube Compliance Verification


Documented drop tube shutoff height calculation and verification sheet


Photo Documentation Package


Clear digital photos showing before, during, and after conditions for all tasks


Disposal Manifests/Receipts


Proof of lawful disposal for concrete and metallic/fuel-wetted scrap


5.0 Safety, Code Compliance & Working Conditions


  • Safety Regulations: All work shall comply with OSHA 29 CFR 1910 and 1926 standards, NFPA 30 (Flammable and Combustible Liquids Code), NFPA 30A (Motor Fuel Dispensing Facilities), and NFPA 70 (National Electrical Code).

  • Hot Work & Hazardous Locations: Sump areas represent Class I, Division 1/2 environments. The Contractor shall implement atmospheric monitoring (LEL meters) and obtain all required hot work permits before operating saws, cutting tools, or electrical equipment near open sumps.

Similar Contracts

Same NAICS industry code

NAICS: 237120
New
SLED
Rebid of WCTA Fuel System Installation - WCTA PA 2026-1.1GC – General Construction
Solicitation # WCTA PA 2026-1.1GC
Washington County Transportation Authority dba Freedom Transit is soliciting bids for contract WCTA PA 2026-1.1GC to construct a new fuel system at the WCTA Operations Facility located at 375 Berry Road, Washington, PA. The scope of work includes the construction of a concrete fuel tank pad with protective bollards, the installation of one 12,000-gallon gasoline aboveground storage tank and one 6,000-gallon diesel aboveground storage tank, two combo gas/diesel dispensers, two fuel management units, and a metal canopy. The project also requires the installation of all necessary electrical power and control wiring. Bids must be submitted electronically via the PennBid portal by 2:00 PM EST on November 18, 2026. The contract will be awarded to the lowest responsible proposer, with a strong emphasis on the use of Disadvantaged Business Enterprises (DBE). Compliance with Federal Davis-Bacon prevailing wage rates, Buy America requirements, and FTA Circular 4220.1 is mandatory. Bidders must provide a bid guarantee equal to 5 percent of the bid price, and the successful contractor must provide performance and payment bonds for 100 percent of the contract price. Project administration will be handled by a Construction Manager, and payments will be processed using AIA Documents G702/CMa and G703. The contractor is responsible for all quality control testing and inspections, and the project includes a 60-day warranty period from the date of installation.
Washington County

POSTED

about 14 hours ago

DEADLINE

in 21 days
View Details
NAICS: 237120
New
International
EXCAVATION AND BACKFILLING OR JOINTS REPAIR WORK OF KWSC PIPELINE
Solicitation # Doc342127147
Pakistan Refinery Limited is seeking sources for the excavation and backfilling or joints repair work of the KWSC pipeline in Pakistan. The scope of work involves excavation across various surfaces including concrete, soil, rock, or roads, with an estimated total quantity of 24,000 square feet. Key technical requirements include backfilling in layers not exceeding 6 inches in depth, compacting to 95 percent ASHTO dry density, and performing dewatering as needed. The contractor is responsible for all barricading and shoring using planks and scaffolding in accordance with HSEQ and area standards. Payment for excavation will be based on actual work performed, subject to the satisfaction of the Engineer or Client Representative. Potential contractors are evaluated based on their company profile, legal status, and registration with local authorities such as FBR, SRB, EOBI, and SESSI. Critical evaluation criteria include a proven track record in the oil and gas industry, supported by a client list and official work orders. Applicants must demonstrate the availability of experienced staff and necessary equipment, provide their annual turnover and income tax return acknowledgments, and submit a comprehensive HSEQ competence policy. The solicitation, identified as Doc342127147, was posted on October 23, 2026, with a response deadline of November 4, 2026.
Pakistan Refinery Limited

POSTED

6 days ago

DEADLINE

in 7 days
View Details
NAICS: 237120
New
Federal
Mather Fueling System Repairs
Solicitation # PANNWD26P028176
The Mather Fueling System Repairs project, solicitation W9128F27RA045, is a design-build effort located at the Mather Army Aviation Support Facility in California. Managed by the USACE Omaha District, this firm-fixed-price contract is restricted as a total Small Business Set-Aside. The scope of work involves comprehensive repairs and upgrades to the AVGAS fueling system, including the installation of a sampling gauge hatch, a mechanical gauge, and an automatic tank gauge system. Physical improvements include recoating the tank exterior, replacing collision barriers, adding a full-length catwalk, and replacing audible and visual alarms. Additional requirements include repairing the remote containment basin drainage, replacing asphalt and concrete pavement in multiple areas, relocating a generator with a new concrete pad, and the demolition and replacement of the POL operation building. The project will be awarded using the Lowest Price Technically Acceptable (LPTA) method, with technical evaluations focusing on project experience—requiring three examples of projects exceeding 1 million dollars—and a detailed Gantt chart covering preconstruction, on-site construction, and post-construction phases. The projected period of performance is 365 days. Contractors must comply with the Davis-Bacon Act for prevailing wages and adhere to strict quality control standards, including a three-phase control process and final acceptance through punch-out, pre-final, and final inspections. Required deliverables include as-built drawings, and the contractor must provide performance and payment bonds within 10 days of award. Optional CLINs are included for the remediation of petroleum-contaminated soil, lead-based paint, and asbestos-containing materials.
W071 Endist Omaha

POSTED

6 days ago

DEADLINE

in 23 days
View Details
NAICS: 237120
New
Federal
FMC Rochester- Install Above Ground Tanks
Solicitation # 15B41227Q00000001
The Federal Bureau of Prisons is soliciting a firm fixed-price construction contract, solicitation 15B41227Q00000001, to replace above-ground fuel tanks near the garage at the Federal Medical Center (FMC) Rochester in Minnesota. The project scope includes the removal of two existing underground storage tanks and the installation of one 4,000-gallon unleaded gasoline tank and one 2,000-gallon diesel tank, both featuring submersible pumps and controllers. Additional requirements include the construction of reinforced concrete foundations, a new fuel dispensing island, protective bollards, and the integration of a new fuel management and automated tank monitoring system. The estimated magnitude of the project is between $250,000 and $500,000, with a performance period of 305 calendar days from the notice to proceed. This is a 100% full and open competition under NAICS code 237120. Award will be determined using a best value trade-off approach, evaluating technical and management approach, specialized experience, schedule, past performance, and price. Bidders must be registered in the System for Award Management (SAM) and submit offers electronically by November 19, 2026. Key requirements include a bid bond of 20% of the bid price for offers exceeding $150,000, compliance with Davis-Bacon Act wage standards, and mandatory criminal history background checks for all contract employees. The contractor must also provide an installation certification notarized by both the contractor and the manufacturer's representative upon completion.
Fmc Rochester

POSTED

6 days ago

DEADLINE

in 22 days
View Details
NAICS: 237120
New
Federal
Nelson Drive Fuel Tank Removal
Solicitation # 1240LT27Q0012
Solicitation 1240LT27Q0012 is a firm fixed price contract issued by the USDA Forest Service for the removal of two 300-gallon steel underground fuel storage tanks at the Nelson Drive housing complex on the Bridger-Teton National Forest in Wyoming. The scope of work includes the extraction and disposal of the tanks, the cleanup and disposal of contaminated soils, and potential surface restoration. The contractor is required to field verify all existing conditions before ordering products and must adhere to OSHA standards for excavation and shoring, as well as IDEQ and government regulations for waste hauling and disposal. The estimated period of performance is from June 1, 2027, to June 30, 2027. This project is a total small business set-aside under NAICS code 237120. Award will be made based on the lowest price technically acceptable (LPTA) criteria, evaluating technical capability through an experience questionnaire, a project-specific quality control plan, and a review of past performance. Required submissions include a technical narrative detailing the approach to tank removal and soil remediation, as well as the qualifications of key personnel. The contract mandates performance and payment bonds and compliance with the Davis-Bacon Act for wage requirements. Quotes were due by November 13, 2026, with a requirement to hold pricing firm for 90 calendar days.
Csa Intermountain 8 Usda-Fs

POSTED

6 days ago

DEADLINE

in 16 days
View Details
NAICS: 237120
New
International
REPLACEMENT OF KWSC PIPELINE FROM KWSC VALVE PIT TOWARDS PRL 1000-RFT SECTION
Solicitation # Doc342008664
Pakistan Refinery Limited is seeking sources for the replacement of a 1,000-RFT section of the KWSC pipeline located within its premises. The scope of work involves comprehensive civil and mechanical activities, including the manual excavation of at least 25 test pits to identify underground utilities, excavation in various terrains, and backfilling compacted to 95% ASHTO dry density in layers not exceeding 6 inches. Key technical deliverables include the installation of an HDPE pipeline with heat or butt fusion joints and the supply and installation of a 16-inch diameter MS globe valve, which requires prior approval from the relevant PRL department. The project also necessitates the construction of masonry valve pits, cement concrete pads, and block masonry protection walls. Strict adherence to safety and quality standards is required, with all pipeline joints and hydrotesting performed in accordance with ASTM 2164. The contractor must provide hard barricades and safety signage every 50 feet, utilize steel scaffolding for shoring, and implement dewatering bores. All machinery, including cranes and trolleys, along with their operators, must be third-party certified. Potential vendors will be evaluated based on their corporate status, financial turnover, and specific experience within the oil and gas industry, as well as their HSEQ policies and availability of experienced staff and equipment.
Pakistan Refinery Limited

POSTED

7 days ago

DEADLINE

in 8 days
View Details

More opportunities from Department Of Defense → FA4407 375 Cons Lgc

Same awarding agency

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS