Pipeline Installation & Utility Interconnection

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

General Info

Documents

This scope was carved out of PW-5-27.

The full solicitation package (1 document), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

Request for Proposals - Landfill Gas Beneficial Use Project NMLF

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

Posted

subcontract

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyAlabama → Public Works
ContactsNo contacts available
OfficeN/A
Organization / AgencyAlabama → Public Works
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Installs pipeline and utility infrastructure to transport processed gas for prime contractors on City of Montgomery projects. Procures right-of-way (ROW) and easements, and installs pipelines, metering, and interconnection points. Coordinates with utility providers to ensure grid integration. Delivers an operational gas pipeline and verified interconnection.

Similar Contracts

Same NAICS industry code

NAICS: 237120
New
International
EXCAVATION AND BACKFILLING OR JOINTS REPAIR WORK OF KWSC PIPELINE
Solicitation # Doc342127147
Pakistan Refinery Limited is seeking sources for the excavation and backfilling or joints repair work of the KWSC pipeline in Pakistan. The scope of work involves excavation across various surfaces including concrete, soil, rock, or roads, with an estimated total quantity of 24,000 square feet. Key technical requirements include backfilling in layers not exceeding 6 inches in depth, compacting to 95 percent ASHTO dry density, and performing dewatering as needed. The contractor is responsible for all barricading and shoring using planks and scaffolding in accordance with HSEQ and area standards. Payment for excavation will be based on actual work performed, subject to the satisfaction of the Engineer or Client Representative. Potential contractors are evaluated based on their company profile, legal status, and registration with local authorities such as FBR, SRB, EOBI, and SESSI. Critical evaluation criteria include a proven track record in the oil and gas industry, supported by a client list and official work orders. Applicants must demonstrate the availability of experienced staff and necessary equipment, provide their annual turnover and income tax return acknowledgments, and submit a comprehensive HSEQ competence policy. The solicitation, identified as Doc342127147, was posted on October 23, 2026, with a response deadline of November 4, 2026.
Pakistan Refinery Limited

POSTED

about 22 hours ago

DEADLINE

in 11 days
View Details
NAICS: 237120
New
Federal
Mather Fueling System Repairs
Solicitation # PANNWD26P028176
The Mather Fueling System Repairs project, solicitation W9128F27RA045, is a firm fixed-price design-build contract issued by the USACE Omaha District for work at the Mather Army Aviation Support Facility in California. This small business set-aside project involves comprehensive repairs and upgrades to AVGAS fueling infrastructure. Key technical requirements include installing a sampling gauge hatch and mechanical gauge on a manway, recoating the tank exterior, replacing collision barriers, adding a full-length catwalk, and replacing audible and visual alarms. Additional scope includes repairing remote containment basin drainage, replacing asphalt and concrete pavement in multiple areas, replacing the POL operation building, installing and testing an Automatic Tank Gauge system, and relocating a generator from a compartmentalized area. The contract will be awarded using the Lowest Price Technically Acceptable method, with evaluations focusing on project experience—requiring three examples of projects exceeding 1 million dollars—and a detailed Gantt chart covering preconstruction, on-site construction, and post-construction phases. The projected period of performance is 365 days. Awardees must provide performance and payment bonds and adhere to Davis-Bacon Act prevailing wage rates. Quality control is managed through a three-phase process, with final acceptance following punch-out and pre-final inspections. The project also includes optional line items for the remediation of petroleum-contaminated soil, lead-based paint, and asbestos-containing materials.
W071 Endist Omaha

POSTED

about 23 hours ago

DEADLINE

in 27 days
View Details
NAICS: 237120
New
Federal
Nelson Drive Fuel Tank Removal
Solicitation # 1240LT27Q0012
Solicitation 1240LT27Q0012 is a firm fixed price contract issued by the USDA Forest Service for the removal of two 300-gallon steel underground fuel storage tanks at the Nelson Drive housing complex on the Bridger-Teton National Forest in Wyoming. The scope of work includes the extraction and disposal of the tanks, the cleanup and disposal of contaminated soils, and potential surface restoration. The contractor is required to field verify all existing conditions before ordering products and must adhere to OSHA standards for excavation and shoring, as well as IDEQ and government regulations for waste hauling and disposal. The estimated period of performance is from June 1, 2027, to June 30, 2027. This project is a total small business set-aside under NAICS code 237120. Award will be made based on the lowest price technically acceptable (LPTA) criteria, evaluating technical capability through an experience questionnaire, a project-specific quality control plan, and a review of past performance. Required submissions include a technical narrative detailing the approach to tank removal and soil remediation, as well as the qualifications of key personnel. The contract mandates performance and payment bonds and compliance with the Davis-Bacon Act for wage requirements. Quotes were due by November 13, 2026, with a requirement to hold pricing firm for 90 calendar days.
Csa Intermountain 8 Usda-Fs

POSTED

about 23 hours ago

DEADLINE

in 21 days
View Details
NAICS: 237120
New
International
REPLACEMENT OF KWSC PIPELINE FROM KWSC VALVE PIT TOWARDS PRL 1000-RFT SECTION
Solicitation # Doc342008664
Pakistan Refinery Limited is seeking sources for the replacement of a 1,000-RFT section of the KWSC pipeline located within its premises. The scope of work involves comprehensive civil and mechanical activities, including the manual excavation of at least 25 test pits to identify underground utilities, excavation in various terrains, and backfilling compacted to 95% ASHTO dry density in layers not exceeding 6 inches. Key technical deliverables include the installation of an HDPE pipeline with heat or butt fusion joints and the supply and installation of a 16-inch diameter MS globe valve, which requires prior approval from the relevant PRL department. The project also necessitates the construction of masonry valve pits, cement concrete pads, and block masonry protection walls. Strict adherence to safety and quality standards is required, with all pipeline joints and hydrotesting performed in accordance with ASTM 2164. The contractor must provide hard barricades and safety signage every 50 feet, utilize steel scaffolding for shoring, and implement dewatering bores. All machinery, including cranes and trolleys, along with their operators, must be third-party certified. Potential vendors will be evaluated based on their corporate status, financial turnover, and specific experience within the oil and gas industry, as well as their HSEQ policies and availability of experienced staff and equipment.
Pakistan Refinery Limited

POSTED

2 days ago

DEADLINE

in 13 days
View Details
NAICS: 237120
New
Federal
WH Ford RTC Fueling System Repairs
Solicitation # W9128F27RA054
Solicitation W9128F27RA054 is a firm fixed price contract issued by the Omaha District of the U.S. Army Corps of Engineers for fueling system repairs at the W.H. Ford Regional Training Center in Greenville, Kentucky. This project is a total small business set-aside under NAICS code 237120. The scope of work involves comprehensive repairs and upgrades to a fuel storage and dispensing facility, specifically focusing on two 10,000 gallon above ground storage tanks. Key tasks include repairing concrete and pavement, installing emergency fuel shutoff stations and leak detection equipment, recoating fuel system canopies and piping, replacing tank vents, improving grounding systems, and upgrading the automatic tank gauging system and associated controls. All work must be completed by June 18, 2027, with a proposed performance period of 410 calendar days. The government will award the contract using the Lowest Price Technically Acceptable (LPTA) source selection process. To be deemed technically acceptable, offerors must provide evidence of specialized experience through three to five completed projects from the last five years, a logical Gantt chart covering preconstruction, on-site construction, and post-construction phases, and a well-defined technical approach for construction and risk mitigation. The contract mandates strict adherence to EM 385-1-1 safety requirements, the Davis-Bacon Act, and Buy American regulations. Additionally, the contractor must ensure a minimum of 60 percent of total project solid waste is diverted from landfills. Proposals must be submitted in two separate volumes, keeping pricing information isolated from the technical submission.
W071 Endist Omaha

POSTED

4 days ago

DEADLINE

in about 1 month
View Details
NAICS: 237120
New
Federal
DESC2103C - Bulk Fuel Storage Tanks Phase II, Yokota Air Base, Japan
Solicitation # W912HV26RA009
Solicitation W912HV26RA009, titled DESC2103C - Bulk Fuel Storage Tanks Phase II, is a construction project at Yokota Air Base, Japan, issued by the USACE Japan Engineer District. The project involves the construction of one 100,000-barrel cut-and-cover JP-8 storage tank featuring a reinforced concrete pump house with four 600-gpm issue vertical turbine pumps and one 50-gpm water draw-off pump. The scope includes the installation of a product saver tank, piping, valves, and vaults connecting to an existing filter separator building, as well as the integration of an automatic tank gauging system and control systems into the existing PLC and HMI infrastructure. The estimated project magnitude is between 7.5 and 15 billion Yen, with a performance period of 1,020 calendar days after the Notice to Proceed. This solicitation is restricted to local sources in Japan and utilizes the Lowest Price Technically Acceptable (LPTA) source selection process. To be eligible, offerors must be rated as acceptable in construction experience, system supplier subcontractor experience, and past performance. Specifically, prime contractors must demonstrate experience with fuel facility construction exceeding 1 billion JPY within the last 20 years. Proposals are due by January 25, 2027, and must be submitted via PIEE. The contract includes a priority rating of DO-C2 and specifies liquidated damages of 615,000 Yen per calendar day of delay. Compliance with EM 385-1-1 March 2024 safety procedures and the submission of a Contractor Quality Control Plan are mandatory requirements.
W2SN Endist Japan

POSTED

5 days ago

DEADLINE

in 3 months
View Details

More opportunities from Alabama → Public Works

Same awarding agency

NAICS: 562219
New
SLED
Request for Proposals - Landfill Gas Beneficial Use Project NMLF
Solicitation # PW-5-27
The City of Montgomery has issued solicitation PW-5-27 seeking qualified developers to finance, design, permit, construct, own, operate, maintain, and decommission a landfill gas beneficial use project at the North Montgomery Landfill. The objective is to maximize the recovery of landfill gas while ensuring regulatory compliance with the Alabama Department of Environmental Management, public safety, and the preservation of landfill operations. Proposers may suggest various commercially demonstrated alternatives, including Renewable Natural Gas, electricity generation, high-Btu beneficial use, or direct-use projects. The anticipated agreement term is twenty years, and the selected developer will be responsible for all infrastructure, including pipelines, utilities, and environmental approvals. Proposals are due by November 19, 2026, and must remain valid for 180 days. The City will evaluate submissions based on technical reliability and financial sustainability, considering both owner-paid and developer-funded operation and maintenance alternatives. Key requirements include the provision of audited financial statements for the last three years, a detailed logic-linked project schedule, and comprehensive financial and performance security, such as construction bonds and decommissioning security. The developer must also provide secure real-time visibility into operational parameters and adhere to strict site safety and cybersecurity standards. Selection is not binding until all required agreements are executed, and the City may negotiate with the highest-ranked proposer or multiple candidates.
Other Nonhazardous Waste Treatment and Disposal

POSTED

about 16 hours ago

DEADLINE

in 26 days
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS