This Solicitation opportunity from Colorado was posted on June 25, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.
Call 001 C26942-COMBO
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
Active Opportunities Like This One
AI Contract Overview
The Colorado Department of Transportation is soliciting bids for a major infrastructure project in Jefferson County, Colorado, under solicitation number C26942-COMBO, titled Call 001 C26942-COMBO, with a letting date of June 11, 2026, and a fixed completion date of August 17, 2029. The project involves replacing the existing US 6 and Wadsworth cloverleaf interchange with a tight diamond with loop design, reconstructing the bridge over Wadsworth and the McIntyre culvert, and lengthening all entrance and exit ramps. It also includes connecting the existing six-lane roadway sections between 8th Avenue and 4th Avenue in both directions and constructing approximately 10-foot multi-use paths on both sides of Wadsworth. Scope of work encompasses extensive site preparation including clearing, grubbing, and removal of trees, inlets, manholes, culverts, pipes, fiber optic cables, walls, sidewalks, curbs, gutters, and asphalt and concrete pavements. Earthwork includes over 24,000 cubic yards of structure excavation, class 1 and 2 backfill, flow-fill, mechanical soil reinforcement, and shoring across 17 designated areas. Drainage and erosion control measures involve storm drain inlet protection, erosion logs, and aggregate bags. Structural elements require drilled shafts ranging from 24 to 54 inches in diameter, precast panel facing, architectural precast concrete panels, and galvanized structural steel. Bridge components include special bridge drains, pipe and pedestrian railings, and bridge expansion devices. Utility installations comprise Ethernet switches, optical attenuators, accessible pedestrian signals, traffic signal equipment, communications and controller cabinets, microwave radar detectors, water service lines, 24-inch welded steel pipe, and 3-inch galvanized pipe. Paving includes detour pavement and new concrete surfaces in seven- and eight-inch thicknesses, along with safety edges. Geomembranes, reinforcing steel, reinforced concrete pipes, electrical conduits, signage systems, lighting control centers, and automated irrigation systems are also part of the project. Bidders must be pre-qualified and attend a mandatory pre-bid meeting on May 29, 2026, at CDOT Headquarters in Denver, either in person or virtually via meet.google.com/xzg-keob-bhk, providing full contact information for virtual attendance. Bids will be accepted only from
General Info
Agency
NAICS
Place of Performance
Jefferson, CO, USASet-Aside
Timeline
Submission Closed
Organization & Contact Information
Full Description
Find Active Opportunities Like This
Get AI-powered intelligence on the opportunities still open
Every page of the solicitation package shredded into a compliance breakdown
AI-powered matching based on your capabilities and past performance
Competitor and incumbent history on the requirement
Automated alerts on amendments, Q&A deadlines, and award
Join 650+ contractors already using CLEATUS
