Call 021 49041-211047

Active
49041-211047State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

This project involves the resurfacing of 0.48 miles of M-134 in Mackinac County, specifically from the I-75SB ramps to the I-75NB ramps. The scope of work includes hot mix asphalt base crushing, shaping, and resurfacing, along with the installation of concrete curb and gutter, aggregate shoulders, corrugations, guardrails, signing, and pavement markings. A five year materials and workmanship pavement warranty is required for this contract. Prime contractors must meet a minimum prequalification requirement of 787 Cb and a subclassification of Ea. If the prime contractor is not prequalified in the Ea subclassification, they must utilize a prequalified subcontractor who must be designated before the contract is awarded to the confirmed low bidder. This solicitation is issued by MIDOT in the state of Michigan.

General Info

MIDOT project for resurfacing 0.48 miles of M-134 in Mackinac County, Michigan.

Agency

Michigan → MIDOTView Agency

NAICS

237310 - Highway, Street, and Bridge ConstructionView NAICS

Place of Performance

Mackinac County, MI, USA

Set-Aside

NONE

Documents

(0)

No documents available

AI Contract Breakdown

Uniform Contract Format

No contract breakdown available.

Cannot generate Contract Breakdown because no documents were found from this contract's source.

Timeline

PhaseSolicitation
Posted

Solicitation

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyMichigan → MIDOT
ContactsNo contacts available
OfficeMI, USA
Organization / Agency
Michigan → MIDOT
View Agency Profile
Office AddressMI, USA
ContactsNo contact information available

Full Description

Show more
0.48 mi of hot mix asphalt base crushing shaping and resurfacing, concrete curb and gutter, aggregate shoulders, corrugations, guardrail, signing and pavement markings on M-134 from I-75SB ramps to I-75NB ramps, Mackinac County. This project includes a 5 year materials and workmanship pavement warranty. ** 787 Cb **In addition to the above minimum prequalification requirement for prime contractors this project includes a subclassification of Ea. If the prime contractor is not prequalified in this subclassification it must use a prequalified subcontractor. This subcontractor must be designated prior to award of the contract to the confirmed low bidder.

Similar Contracts

Same NAICS industry code

NAICS: 237310
New
SLED
ATP Cycle 6 Improvements Project
Solicitation # 20260922003
The ATP Cycle 6 Improvements Project, solicitation number 20260922003, is a public works contract issued by the City of El Centro, California, Department of Public Works. The project focuses on roadway and intersection enhancements, specifically targeting the installation of new curbs, gutters, sidewalks, and concrete curb ramps. Key project locations include Main Street between Solana Drive and LaBrucherie Road, and State Street at the 14th Street intersection. Major deliverables include the installation of a Rectangular Rapid Flashing Beacon (RRFB), high visibility crosswalks, and general ADA improvements adhering to CalTAS 2025 and ADAAG standards. The contract mandates a 120-calendar day completion timeline, with liquidated damages set at 1,000 dollars per day for delays. Technical requirements specify the use of thermoplastic for traffic striping and a minimum concrete compressive strength of 4,000 psi. All work must comply with the Greenbook, Caltrans Standard Specifications, and the California Manual on Uniform Traffic Control Devices. Payment for traffic control is structured as a lump sum, with 35 percent paid after installation, 35 percent at the second pay request, and the final 30 percent upon completion. Contractors are required to provide performance and payment bonds and maintain all federal and state labor law postings at the project site.
City of El Centro

POSTED

about 11 hours ago

DEADLINE

in 9 days
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS