This Solicitation opportunity from Nevada was posted on January 1, 1970. The submission period has ended. Browse the details below for market research, or find similar active opportunities.
Call 100 13366
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
Active Opportunities Like This One
AI Contract Overview
The Lincoln Beal Slough Trail project, under solicitation number 13366 issued by the Nebraska Department of Transportation on behalf of the City of Lincoln, is a highway construction initiative focused on extending an existing trail by 1.88 miles in Lancaster County, Nebraska, from the east side of 56th Street north of London Road southeast to Yankee Hill Road Trail near the intersection with 70th Street. The work includes constructing a 10-foot-wide concrete trail surface with 2-foot-wide earthen or concrete shoulders, installing a prefabricated bridge over Beal Slough south of Pine Lake Road, and building a gravity retaining wall system in compliance with project specifications. The project is governed by the 2017 Edition of the Standard Specifications for Highway Construction and requires adherence to Form FHWA 1273 (Rev. 10-23), the Davis-Bacon Act for wage determinations, Executive Order 11246, and affirmative action requirements dated November 3, 1980. Contractors must also comply with flood plain management provisions of the Lincoln Municipal Code Section 27.52 or 27.53 and Lancaster County Zoning Resolution Article 11. Prequalification in Class 3,10 for Concrete Pavement, General is mandatory for bid acceptance, and all bidders must certify they are not debarred, suspended, or ineligible under federal standards, including the absence of felony convictions or unpaid federal tax liabilities within specified timeframes. The contract mandates full compliance with the Buy America Act, the Build America, Buy America Act, Title VI nondiscrimination provisions, and U.S. DOT regulations on DBE participation. Bonding and insurance requirements are stipulated to ensure complete payment and performance, and labor wage standards under the Davis-Bacon Act apply to all work and subcontracts. The tentative start date is November 16, 2026, with a contract duration of 120 working days. Materials not stored on-site must be clearly marked and segregated, and shipping documentation for domestic and international shipments must be submitted within 20 and 30 working days respectively. Partial payments are permitted for nonperishable materials upon submission of verified cost documentation, and subcontractor payment reporting must occur via the Department's designated system. Bids must be submitted by August 27, 2026, at 1:30 PM, either electronically via www.bidx.com, by mail
General Info
Agency
Place of Performance
Lancaster, NV, USASet-Aside
Timeline
Submission Closed
Organization & Contact Information
Full Description
Find Active Opportunities Like This
Get AI-powered intelligence on the opportunities still open
Every page of the solicitation package shredded into a compliance breakdown
AI-powered matching based on your capabilities and past performance
Competitor and incumbent history on the requirement
Automated alerts on amendments, Q&A deadlines, and award
Join 750+ contractors already using CLEATUS
