Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, August 19 at 2:00 PM EDT

Register Free →

Calleguas Water Campus Staff Housing Replacement

Active
20260723020State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The Calleguas Water Campus Staff Housing Replacement project involves the complete phased demolition and replacement of three existing manufactured homes and their associated garages, with the design and construction of three new engineered foundations, three new detached two-car garages, and six covered decks. The scope encompasses all aspects of the work including connections to existing electrical, water, sewer, and communications utilities, full installation of mechanical, electrical, plumbing, and fire protection systems, and comprehensive site restoration and landscaping. Work will be executed in three distinct phases to allow for the relocation of tenants between the old and new housing units. The project is governed by a firm-fixed-price contract, with bid submissions due by August 18, 2026, and performance is required at 2100 E. Olsen Rd., Thousand Oaks, California. All materials must meet ANSI, ASTM, and AWWA standards, be new and conform to approved samples, and comply with CARB regulations, particularly regarding vehicle emissions. Workmanship must adhere to best modern practices and be performed in full compliance with OSHA and Cal/OSHA safety codes. Bidders are required to submit a Noncollusion Declaration, evidence of required bonds including Faithful Performance and Payment Bonds, proof of Workers’ Compensation and Liability Insurance, and detailed qualifications for key personnel including the Project Manager and Superintendent, with verifiable references for past projects of similar scale. Subcontractors representing more than 0.5% of the total bid value must be disclosed. Contractors must provide a pre-construction video of the site, comply with Valley Fever mitigation protocols, implement erosion and sediment control measures, and adhere to scheduled work hours and prohibited work days. Factory inspections and witnessed testing are mandatory for materials, and utilities must be formally notified prior to excavation. The award will be made to the lowest responsible bidder without trade-offs, and the contract includes liquidated damages for delays, retention of payments until completion, and liability for damage to existing District facilities. While no formal FAR clauses or federal identification codes are used, the procurement follows California public works procedures, and all submissions must be made through the designated e-procurement platform in PDF format, with no specified page limits. Payment will be processed via monthly estimates based on a Schedule of Values, with no mention of electronic invoicing systems.

General Info

Demolish three homes, build three new ones with garages and decks, connect utilities, restore site, phase relocation in Thousand Oaks.

Agency

California → Calleguas Municipal Water DistrictView Agency

NAICS

236115 - New Single-Family Housing Construction (except For-Sale Builders)View NAICS

Place of Performance

Thousand Oaks, CA, 91360, USA

Set-Aside

NONE

Documents

(5)

Proposal for Calleguas Water Campus Staff Housing Replacement Project No. 633

PDFrfp

633 Drawings Location Map

PDFother

Calleguas Water Campus Staff Housing Replacement - Notice Inviting Bids

PDFnotice-inviting-bids

CWC Staff Housing Replacement Pre-Bid Sign-In Sheet

PDFpre-bid-sign-in-sheet

Calleguas Water Campus Staff Housing Replacement IFB Project No. 633

PDFifb

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseSolicitation
Posted

Solicitation

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → Calleguas Municipal Water District
Contacts1 person available
OfficeN/A
Organization / Agency
California → Calleguas Municipal Water District
View Agency Profile
Office AddressN/A
Contacts
Gabriela Araujo

Full Description

Show more
Bid #633: The project involves the phased demolition and replacement of three existing staff manufactured homes and their associated garages. The scope includes the design and construction of new engineered foundations, procurement and installation of three new manufactured homes, construction of three new detached two-car garages, and six covered decks. The work is all-inclusive, covering connections to existing utilities (electrical, water, sewer, communications), installation of all mechanical, electrical, plumbing, and fire protection systems, as well as final site restoration and landscaping. The project will be executed in three phases to accommodate tenant relocation between the existing and newly constructed homes.

Similar Contracts

Same NAICS industry code