Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, September 16 at 2:00 PM EDT

Register Free →

This Solicitation opportunity from Washington was posted on August 4, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Camp Murray - Building 8 HVAC Improvements, Washington Military Department, Camp Murray, WA #2024-614

Closed
2024-614State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 238220
New
SLED
ICE 8A - Ft Benning Improvements
Solicitation # 70CMSW25R00000011
This firm-fixed-price task order, issued under an 8(a) Multiple Award Construction Contract (MACC) for the DHS Office of Firearms and Tactical Programs, provides design-build services for life, safety, and operational improvements at Fort Benning, Georgia. The project scope includes a variety of facility enhancements such as installing aluminum awnings, replacing turf at Fiske Range, demolishing and restoring Building 2294, improving gutters and drainage at Building 234, and performing commercial HVAC replacements. Additional work involves general improvements to Building 301 and the DAGr Team facility, including office refreshes, the installation of AV equipment and gear storage lockers, and the reconfiguration of restrooms to include walk-in showers. The estimated magnitude of the project is between 4.0 million and 4.5 million dollars, with a period of performance not to exceed 365 days from the date of award. Award will be based on the lowest total evaluated price, provided the offeror demonstrates a technical understanding of the requirements and possesses the necessary licensed professional resources. The contract is subject to the Davis-Bacon Act, requiring adherence to wage determination GA20260320, including specific federal paid sick leave and minimum wage mandates. Performance and payment bonds are required per FAR 52.228-15. Administrative oversight is managed by the Contracting Officer's Representative, Mr. Joseph Addison, and all payment requests must be submitted electronically via the Invoice Processing Platform with accompanying certified payroll.
Bristol Alliance of Companies

POSTED

about 3 hours ago

DEADLINE

in 5 days
NAICS: 238220
New
SLED
PIDC Project 3 - Dorm RTU Replacement and SCADA
Solicitation # 872287
This project involves the replacement and upgrade of Rooftop HVAC Units (RTUs) for the Alpha, Bravo, Charlie, and Delta dorms, as well as a SCADA system upgrade at the Port Isabel Detention Center in Los Fresnos, Texas. The objective is to replace corroded and obsolete HVAC equipment with high-quality, durable, and coastal weather-resistant systems that exceed commercial and industrial standards. The SCADA portion of the project requires replacing current software and installing two chemical feed pumps to ensure effective water production and wastewater management in compliance with Texas Commission of Environmental Quality standards. The contract is a Firm-Fixed-Price task order issued under an 8(a) Multiple Award Construction Contract (MACC) IDIQ, with an estimated magnitude between 1.2 million and 1.5 million dollars. The period of performance is 365 days from the date of award. Award will be based solely on the lowest total evaluated price. Key requirements include the submission of a Quality Control Plan, a one-year contractor warranty for installation and craftsmanship, and the appointment of a Project Manager with at least five years of recent federal contracting experience. The project is subject to the Davis-Bacon Act and requires performance and payment bonds. All personnel must undergo background checks to access the secure facility. The contractor is responsible for providing a detailed project schedule following the Notice to Proceed and must adhere to specific working hours, typically 7:00 AM to 3:30 PM. Proposals must be submitted by September 24, 2026, and include a detailed pricing breakdown by CSI division.
Bristol Alliance of Companies

POSTED

about 3 hours ago

DEADLINE

in 12 days
NAICS: 238220
New
RFQ7593 Smoke Detector Installation
Solicitation # RFQ7593
Management & Training Corporation (MTC) is soliciting bids for a fee-for-service subcontracting opportunity to provide smoke detector installation and fire system services at the Sierra Nevada Job Corps Center in Reno, Nevada. The scope of work requires the replacement of 43 smoke detectors across specific dormitory rooms, including 12 detectors in rooms 11, 15, and 18, 12 detectors in room 19, and 19 detectors in rooms 20 and 21. The contractor must ensure all installed detectors communicate with the fire panel and that all work adheres to NFPA standards and local Authority Having Jurisdiction requirements. Bids must be submitted via email to Tom Williams by 3:00 PM PST on September 18, 2026. To be considered, applicants must provide a completed bid sheet, proof of insurance, and a supplier packet containing a W-9, self-certification form, and acceptance of terms and conditions. This opportunity is open to various small business set-asides, including SDB, WOSB, HUBZone, and Veteran-Owned businesses, under NAICS code 238220. Award decisions will be based on the best value as determined by MTC. The contract mandates compliance with Service Contract Labor Standards and Wage Determination No. 2015-5595 Revision 28 for labor rates in Washoe and Storey counties. Additionally, subcontractors must provide a 12-digit Unique Entity ID and certify their debarment status under FAR 52.209-6 if the subcontract exceeds 30,000 dollars. Strict adherence to government and Department of Labor guidance regarding the protection of sensitive and proprietary information is required.
Sierra Nevada Job Corps Center

POSTED

about 3 hours ago

DEADLINE

in 6 days
NAICS: 238220
New
2026-Clearfield-Bldg E8 Welding HVAC
Solicitation # 2026- Clearfield- Welding Bldg. E8 HVAC Replacement
Management & Training Corporation (MTC) is seeking fixed-price lump sum bids for a subcontracting opportunity to replace a 20hp motor connected to the rooftop HVAC system at the Clearfield Job Corps Center in Clearfield, Utah. The scope of work includes providing all labor, supervision, materials, equipment, and permits necessary for the removal and replacement of the motor, ensuring the system is fully operational upon completion. Deliverables include the successful installation and the provision of startup, testing, and commissioning documentation. All work must comply with federal, state, and local codes, OSHA requirements, and site safety procedures. Bids are due by September 19, 2026, at 3:00 PM MST and must be submitted via email to Patricia Willover and Nelson Dar. To be considered, bidders must conduct a physical site visit, sign the attendance roster, and submit a bid bond guarantee. The submission package must include a signed MTC Bid for Lump Sum Contract form and a detailed cost breakout on company letterhead. Award will be based on overall best value. The project is a small business set-aside and requires contractors to provide a 12-digit Unique Entity ID and a 9-digit Tax ID. Compliance with Davis-Bacon prevailing wage rates for Davis County, Utah, is mandatory. Additionally, the successful contractor must provide performance and payment bonds from a surety company with at least an A- rating within five business days of an Intent to Award letter. Payment will be processed via pay applications using AIA G702 and G703 forms based on a previously submitted Schedule of Values.
Management & Training Corporation

POSTED

about 3 hours ago

DEADLINE

in 7 days
NAICS: 238220
New
CBP7664 Wellness HVAC Compressor Replacement
Solicitation # CBP7664
Management & Training Corporation is seeking bids for a subcontracting opportunity to replace a failed HVAC/refrigeration compressor at the Wellness facility of the Sierra Nevada Job Corps Center in Reno, Nevada. This fixed-price, single lump sum contract requires the contractor to provide all labor, materials, and equipment to execute a five-phase process including preparation, demolition, installation of an OEM-specified compressor, system testing and commissioning, and final closeout. The project must restore full cooling capacity and operational efficiency while adhering to EPA Section 608 regulations for refrigerant recovery. The work must be completed within thirty consecutive business days following the receipt of a written Notice to Proceed. Bids will be evaluated based on overall best value, considering price, quality, and delivery schedule. The estimated price range is between 0 and 25,000 dollars, though bids equal to or greater than 25,000 dollars require a 20 percent bid bond guarantee and subsequent performance and payment bonds from an A-rated surety company. Submission requirements include a bid sheet, proof of insurance, three comparable project references, and a completed supplier packet containing a W-9 and self-certification of business size under FAR 52.219-8. Contractors must comply with Davis-Bacon Act prevailing wage rates for Washoe County and adhere to FAR 52.204-10 reporting if the award reaches 40,000 dollars. Final payment is contingent upon a successful final inspection and the submission of a notice of final completion, certified payroll reports, and operation and maintenance manuals.
Sierra Nevada Job Corps Center

POSTED

about 3 hours ago

DEADLINE

in 11 days
NAICS: 238220
New
This is a subcontracting opportunity to replace a chiller in McKinney, TX.
Solicitation # subcontracting-opportunity-replace-chiller-mckinney-tx
Serrato Corporation is seeking subcontractors to replace a failing air-cooled chiller in Building 214/215 at the North Texas Job Corps Center in McKinney, Texas. The project requires the installation of a like-kind, similar model to the existing 246-ton Carrier unit, including demolition and disposal of the old equipment. The scope of work extends to building automation controls via the installation of a JACE 9000 central integration point with a graphical user interface, the installation of four 3-way control valves, and the replacement of three out of four air handler VFDs. Additionally, the contractor must clean and inspect four air handling units, including blower motors, wheels, coils, and screens. Bids must be submitted by September 18, 2026, and must remain valid for 90 days. Required submission documentation includes manufacturer equipment specifications, Form 1413 for Davis-Bacon Act certified payroll for work exceeding 2,000 dollars, and a Certificate of Liability Insurance naming Serrato Corporation as the holder. Insurance minimums include 1 million dollars for Commercial General Liability and Comprehensive Automobile Liability, and 500,000 dollars for Employers Liability. The contractor is responsible for performing startup and operational tests and providing all warranty information and final job documentation. This opportunity is set aside for various small business categories, including SDB, WOSB, HUBZone, and SDVOSB.
Serrato Corporation DBA North Texas Job Corps

POSTED

about 3 hours ago

DEADLINE

in 6 days
NAICS: 238220
New
Main Building 1 Wing 5 – Six Rooftop HVAC Unit Replacement – Glenmont Job Corps Center
Solicitation # S26-010
The Glenmont Job Corps Center is soliciting proposals from qualified, New York State licensed contractors for the replacement and installation of HVAC equipment within Main Building No. 1, Wing 5 (Education Building) in Glenmont, New York. The project involves replacing two 7.5-ton split-system units for the auditorium, one 6-ton rooftop unit for the library and computer lab, and one 12.5-ton rooftop unit for the north and east wing classrooms. Additionally, the scope includes installing four 2-ton ductless mini-split heat pump systems, removing a window air-conditioning unit, and abandoning two 5-ton rooftop units in place. Comprehensive associated work encompasses demolition, roof curbs and penetrations, ductwork, refrigerant and condensate piping, electrical work, controls, structural roof evaluations, and fire alarm and duct smoke detector installations, concluding with testing, balancing, and commissioning. This solicitation is set aside for various small business categories, including SDB, WOSB, HUBZone, and Veteran-Owned Small Businesses. The project must be completed within 210 calendar days following the written Notice to Proceed, and the facility will remain operational throughout the construction period. Key deadlines include a pre-proposal site walkthrough on September 10, 2026, with vendor questions due by September 14, 2026. Final proposals must be submitted by September 21, 2026, at 4:00 PM ET. All work must comply with applicable New York State codes, safety regulations, and environmental requirements.
Adams and Associates, Inc.

POSTED

about 3 hours ago

DEADLINE

in 9 days
NAICS: 238220
New
Replace HVAC Systems in the following buildings on our campus –1.) 1091 – Glazing/Welding/Heavy Mechanics Bldg
Solicitation # 26-140
Adams and Associates, Inc. is soliciting a single lump sum contract to replace a failing 10-ton gas-fired packaged HVAC unit at the Atterbury Job Corps Center in Edinburgh, Indiana, specifically within Building 1091. The project requires the installation of a new 12.5 SEER packaged unit utilizing non-R22 refrigerants, such as R-410A or R-454B, while reusing existing ductwork, thermostat wiring, and electrical disconnects. The contractor must leave the old unit at the maintenance building for parts and provide labeled recovered refrigerant to the facility. Proposals are due by October 5, 2026, and require a mandatory site visit on September 23, 2026. Award will be based on best value, evaluating price (60 points), quality (20 points), past performance (10 points), and schedule (10 points). Eligible bidders must possess a valid Indiana Contractor's License, an active SAM.gov registration with a Unique Entity ID, and provide proof of specific automobile and workers compensation insurance naming Adams and Associates, Inc. as an additional insured. The contractor must comply with EPA, OSHA, and Davis Bacon Act wage determinations. Deliverables include a sequenced construction schedule within 10 days of the notice to proceed, a one-year workmanship guarantee, and manufacturer product warranties. Final payment is contingent upon a successful substantial completion walk-through, submission of a completed SF 1413, and the release of liens from all subcontractors.
Adams & Associates, Inc.

POSTED

about 3 hours ago

DEADLINE

in 22 days
NAICS: 238220
New
Replace HVAC Systems in the following buildings on our campus –1.) ABL Dormitory
Solicitation # 26-141
Adams & Associates, Inc., operating for the U.S. Department of Labor, is soliciting a single lump sum contract to replace HVAC systems at the Atterbury Job Corps Center's ABL Dormitory in Indiana. The project involves replacing existing R-22 Bryant air cooled condensing units, including an 8.5-ton unit for common areas and 4-ton and 3.5-ton units for dormitory wings A, B, C, and D, with new 12.5 SEER packaged units utilizing non-R22 refrigerants such as R-410A or R-454B. The scope requires the reuse of existing electrical disconnects, ductwork, and thermostat wiring, and mandates that all recovered refrigerant be labeled and left on-site. Eligible bidders must be registered in SAM.gov with a valid Unique Entity ID and hold a valid State of Indiana contractor's license. A mandatory site visit is scheduled for September 23, 2026, with final proposals due by October 5, 2026. Award decisions will be based on best value, evaluating price (60 points), quality (20 points), past performance (10 points), and schedule (10 points). Contractors must comply with EPA and OSHA regulations, Davis-Bacon Act wage determinations, and provide specific insurance coverages, including automobile liability and workers' compensation. Final payment is subject to net 30 terms and is contingent upon the submission of a completed SF 1413, certified payroll records, and a release of liens.
Adams & Associates, Inc.

POSTED

about 3 hours ago

DEADLINE

in 22 days

AI Contract Overview

Show more

The State of Washington Military Department is soliciting bids for HVAC improvements at Building 8, Camp Murray, under solicitation number 2024-614. The scope of work involves removing three existing split system heat pumps and replacing them with a VRF system featuring one outdoor unit and three indoor units equipped with electric duct heaters. Additionally, the contractor must enlarge the existing mechanical mezzanine access and install a pull-down ladder. A mandatory pre-bid meeting is scheduled for July 30 at 10:00 am at the project site in Camp Murray, WA. Interested parties must submit their responses by the deadline of August 12, 2026. The project is managed by the Washington Military Department, with Tiffany Roberts serving as the primary point of contact.

General Info

Washington Military Department seeks bids for Camp Murray HVAC upgrades by August 12, 2026.

Agency

State of Washington Military DepartmentView Agency

NAICS

238220 - Plumbing, Heating, and Air-Conditioning ContractorsView NAICS

Place of Performance

Camp Murray, Tacoma, WA, 98430-5052, USA

Set-Aside

NONE

Documents

(394)

Specs - Page 152.jpg

JPG

Specs - Page 228.jpg

JPG

Specs - Page 350.jpg

JPG

Specs - Page 215.jpg

JPG

Specs - Page 24.jpg

JPG

Specs - Page 371.jpg

JPG

Specs - Page 132.jpg

JPG

Specs - Page 321.jpg

JPG

Specs - Page 62.jpg

JPG

Specs - Page 199.jpg

JPG

Specs - Page 77.jpg

JPG

Specs - Page 186.jpg

JPG

Specs - Page 44.jpg

JPG

Specs - Page 366.jpg

JPG

Specs - Page 156.jpg

JPG

Specs - Page 249.jpg

JPG

Specs - Page 349.jpg

JPG

Specs - Page 201.jpg

JPG

Specs - Page 296.jpg

JPG

Specs - Page 174.jpg

JPG

Specs - Page 184.jpg

JPG

Addendum #1 - Page 2.jpg

JPG

Specs - Page 135.jpg

JPG

Specs - Page 111.jpg

JPG

Specs - Page 269.jpg

JPG

Specs - Page 93.jpg

JPG

Plans - Page 5.jpg

JPG

Plans - Page 11.jpg

JPG

Specs - Page 271.jpg

JPG

Specs - Page 164.jpg

JPG

Specs - Page 185.jpg

JPG

Specs - Page 89.jpg

JPG

Specs - Page 2.jpg

JPG

Specs - Page 114.jpg

JPG

Specs - Page 362.jpg

JPG

Plans - Page 12.jpg

JPG

Specs - Page 153.jpg

JPG

Specs - Page 232.jpg

JPG

Addendum #1 - Page 3.jpg

JPG

Specs - Page 264.jpg

JPG

Specs - Page 283.jpg

JPG

Specs - Page 278.jpg

JPG

Specs - Page 344.jpg

JPG

Specs - Page 208.jpg

JPG

Specs - Page 150.jpg

JPG

Specs - Page 197.jpg

JPG

Specs - Page 317.jpg

JPG

Specs - Page 35.jpg

JPG

Specs - Page 119.jpg

JPG

Specs - Page 122.jpg

JPG

Specs - Page 204.jpg

JPG

Specs - Page 129.jpg

JPG

Specs - Page 30.jpg

JPG

Specs - Page 64.jpg

JPG

Specs - Page 285.jpg

JPG

Specs - Page 275.jpg

JPG

Specs - Page 261.jpg

JPG

Specs - Page 26.jpg

JPG

Specs - Page 207.jpg

JPG

Specs - Page 149.jpg

JPG

Specs - Page 357.jpg

JPG

Specs - Page 298.jpg

JPG

Specs - Page 76.jpg

JPG

Specs - Page 252.jpg

JPG

Specs - Page 359.jpg

JPG

Specs - Page 309.jpg

JPG

Specs - Page 191.jpg

JPG

Specs - Page 127.jpg

JPG

Specs - Page 45.jpg

JPG

Specs - Page 80.jpg

JPG

Specs - Page 241.jpg

JPG

Specs - Page 355.jpg

JPG

Specs - Page 306.jpg

JPG

Specs - Page 373.jpg

JPG

Specs - Page 236.jpg

JPG

Specs - Page 180.jpg

JPG

Specs - Page 340.jpg

JPG

Specs - Page 276.jpg

JPG

Specs - Page 17.jpg

JPG

Specs - Page 53.jpg

JPG

Specs - Page 51.jpg

JPG

Specs - Page 85.jpg

JPG

Specs - Page 290.jpg

JPG

Specs - Page 4.jpg

JPG

Addendum #1 Plan - Page 1.jpg

JPG

Specs - Page 244.jpg

JPG

Specs - Page 145.jpg

JPG

Specs - Page 13.jpg

JPG

Specs - Page 107.jpg

JPG

Plans - Page 9.jpg

JPG

Specs - Page 312.jpg

JPG

Specs - Page 316.jpg

JPG

Specs - Page 189.jpg

JPG

Specs - Page 142.jpg

JPG

Specs - Page 91.jpg

JPG

Specs - Page 247.jpg

JPG

Specs - Page 194.jpg

JPG

Specs - Page 294.jpg

JPG

Specs - Page 166.jpg

JPG

Specs - Page 84.jpg

JPG

Specs - Page 293.jpg

JPG

Specs - Page 188.jpg

JPG

Specs - Page 320.jpg

JPG

Specs - Page 138.jpg

JPG

Specs - Page 43.jpg

JPG

Specs - Page 74.jpg

JPG

Specs - Page 136.jpg

JPG

Specs - Page 19.jpg

JPG

Specs - Page 59.jpg

JPG

Specs - Page 331.jpg

JPG

Specs - Page 140.jpg

JPG

Specs - Page 209.jpg

JPG

Specs - Page 361.jpg

JPG

Specs - Page 63.jpg

JPG

Specs - Page 170.jpg

JPG

Specs - Page 360.jpg

JPG

Specs - Page 256.jpg

JPG

Specs - Page 238.jpg

JPG

Specs - Page 333.jpg

JPG

Specs - Page 97.jpg

JPG

Specs - Page 5.jpg

JPG

Specs - Page 326.jpg

JPG

Specs - Page 31.jpg

JPG

Specs - Page 134.jpg

JPG

Specs - Page 146.jpg

JPG

Specs - Page 370.jpg

JPG

Specs - Page 143.jpg

JPG

Specs - Page 183.jpg

JPG

Specs - Page 193.jpg

JPG

Specs - Page 81.jpg

JPG

Specs - Page 352.jpg

JPG

Specs - Page 8.jpg

JPG

Specs - Page 319.jpg

JPG

Specs - Page 248.jpg

JPG

Specs - Page 364.jpg

JPG

Specs - Page 144.jpg

JPG

Specs - Page 262.jpg

JPG

Specs - Page 178.jpg

JPG

Specs - Page 251.jpg

JPG

Specs - Page 365.jpg

JPG

Specs - Page 73.jpg

JPG

Specs - Page 137.jpg

JPG

Specs - Page 225.jpg

JPG

Specs - Page 94.jpg

JPG

Specs - Page 267.jpg

JPG

Specs - Page 358.jpg

JPG

Specs - Page 281.jpg

JPG

Specs - Page 347.jpg

JPG

Specs - Page 375.jpg

JPG

Specs - Page 237.jpg

JPG

Specs - Page 67.jpg

JPG

Specs - Page 368.jpg

JPG

Specs - Page 231.jpg

JPG

Specs - Page 36.jpg

JPG

Specs - Page 61.jpg

JPG

Specs - Page 159.jpg

JPG

Specs - Page 70.jpg

JPG

Specs - Page 195.jpg

JPG

Specs - Page 336.jpg

JPG

Specs - Page 6.jpg

JPG

Specs - Page 242.jpg

JPG

Specs - Page 176.jpg

JPG

Specs - Page 343.jpg

JPG

Specs - Page 330.jpg

JPG

Specs - Page 243.jpg

JPG

Specs - Page 10.jpg

JPG

Specs - Page 254.jpg

JPG

Specs - Page 95.jpg

JPG

Specs - Page 147.jpg

JPG

Specs - Page 302.jpg

JPG

Addendum #1 - Page 4.jpg

JPG

Specs - Page 303.jpg

JPG

Specs - Page 168.jpg

JPG

Specs - Page 310.jpg

JPG

Specs - Page 99.jpg

JPG

Specs - Page 100.jpg

JPG

Specs - Page 348.jpg

JPG

Specs - Page 60.jpg

JPG

Specs - Page 83.jpg

JPG

Specs - Page 78.jpg

JPG

Specs - Page 90.jpg

JPG

Specs - Page 263.jpg

JPG

Specs - Page 315.jpg

JPG

Specs - Page 57.jpg

JPG

Specs - Page 289.jpg

JPG

Plans - Page 1.jpg

JPG

Specs - Page 300.jpg

JPG

Specs - Page 163.jpg

JPG

Specs - Page 88.jpg

JPG

Specs - Page 211.jpg

JPG

Specs - Page 239.jpg

JPG

Specs - Page 113.jpg

JPG

Specs - Page 221.jpg

JPG

Specs - Page 233.jpg

JPG

Specs - Page 218.jpg

JPG

Specs - Page 280.jpg

JPG

Specs - Page 282.jpg

JPG

Specs - Page 334.jpg

JPG

Specs - Page 22.jpg

JPG

Specs - Page 367.jpg

JPG

Specs - Page 54.jpg

JPG

Specs - Page 23.jpg

JPG

Specs - Page 7.jpg

JPG

Specs - Page 131.jpg

JPG

Specs - Page 311.jpg

JPG

Specs - Page 126.jpg

JPG

Specs - Page 223.jpg

JPG

Specs - Page 250.jpg

JPG

Specs - Page 212.jpg

JPG

Specs - Page 87.jpg

JPG

Specs - Page 327.jpg

JPG

Specs - Page 141.jpg

JPG

Specs - Page 203.jpg

JPG

Specs - Page 52.jpg

JPG

Specs - Page 288.jpg

JPG

Specs - Page 124.jpg

JPG

Specs - Page 34.jpg

JPG

Specs - Page 182.jpg

JPG

Specs - Page 253.jpg

JPG

Specs - Page 68.jpg

JPG

Specs - Page 171.jpg

JPG

Specs - Page 295.jpg

JPG

Specs - Page 292.jpg

JPG

Specs - Page 198.jpg

JPG

Specs - Page 42.jpg

JPG

Specs - Page 287.jpg

JPG

Specs - Page 196.jpg

JPG

Specs - Page 372.jpg

JPG

Specs - Page 104.jpg

JPG

Specs - Page 66.jpg

JPG

Specs - Page 56.jpg

JPG

Specs - Page 265.jpg

JPG

Specs - Page 109.jpg

JPG

Specs - Page 18.jpg

JPG

Specs - Page 214.jpg

JPG

Specs - Page 345.jpg

JPG

Specs - Page 116.jpg

JPG

Specs - Page 274.jpg

JPG

Specs - Page 339.jpg

JPG

Specs - Page 47.jpg

JPG

Specs - Page 49.jpg

JPG

Specs - Page 12.jpg

JPG

Specs - Page 325.jpg

JPG

Specs - Page 374.jpg

JPG

Specs - Page 272.jpg

JPG

Specs - Page 192.jpg

JPG

Specs - Page 301.jpg

JPG

Specs - Page 55.jpg

JPG

Specs - Page 25.jpg

JPG

Specs - Page 162.jpg

JPG

Specs - Page 338.jpg

JPG

Specs - Page 235.jpg

JPG

Specs - Page 37.jpg

JPG

Specs - Page 257.jpg

JPG

Specs - Page 154.jpg

JPG

Specs - Page 139.jpg

JPG

Specs - Page 167.jpg

JPG

Specs - Page 151.jpg

JPG

Specs - Page 177.jpg

JPG

Specs - Page 220.jpg

JPG

Specs - Page 130.jpg

JPG

Specs - Page 230.jpg

JPG

Specs - Page 337.jpg

JPG

Specs - Page 270.jpg

JPG

Specs - Page 27.jpg

JPG

Specs - Page 328.jpg

JPG

Plans - Page 4.jpg

JPG

Specs - Page 266.jpg

JPG

Specs - Page 353.jpg

JPG

Specs - Page 110.jpg

JPG

Plans - Page 2.jpg

JPG

Specs - Page 323.jpg

JPG

Specs - Page 58.jpg

JPG

Specs - Page 308.jpg

JPG

Addendum #1 - Page 1.jpg

JPG

Specs - Page 39.jpg

JPG

Specs - Page 20.jpg

JPG

Specs - Page 50.jpg

JPG

Plans - Page 3.jpg

JPG

Specs - Page 222.jpg

JPG

Plans - Page 10.jpg

JPG

Specs - Page 155.jpg

JPG

Specs - Page 128.jpg

JPG

Specs - Page 29.jpg

JPG

Specs - Page 229.jpg

JPG

Specs - Page 324.jpg

JPG

Specs - Page 72.jpg

JPG

Specs - Page 106.jpg

JPG

Specs - Page 15.jpg

JPG

Specs - Page 202.jpg

JPG

Specs - Page 65.jpg

JPG

Specs - Page 322.jpg

JPG

Specs - Page 277.jpg

JPG

Specs - Page 187.jpg

JPG

Specs - Page 108.jpg

JPG

Specs - Page 148.jpg

JPG

Specs - Page 224.jpg

JPG

Specs - Page 38.jpg

JPG

Specs - Page 14.jpg

JPG

Specs - Page 40.jpg

JPG

Specs - Page 351.jpg

JPG

Specs - Page 101.jpg

JPG

Specs - Page 219.jpg

JPG

Specs - Page 28.jpg

JPG

Specs - Page 342.jpg

JPG

Specs - Page 48.jpg

JPG

Specs - Page 33.jpg

JPG

Specs - Page 112.jpg

JPG

Specs - Page 117.jpg

JPG

Specs - Page 341.jpg

JPG

Specs - Page 205.jpg

JPG

Plans - Page 7.jpg

JPG

Specs - Page 200.jpg

JPG

Specs - Page 103.jpg

JPG

Specs - Page 246.jpg

JPG

Specs - Page 190.jpg

JPG

Specs - Page 181.jpg

JPG

Specs - Page 346.jpg

JPG

Specs - Page 279.jpg

JPG

Specs - Page 86.jpg

JPG

Specs - Page 305.jpg

JPG

Plans - Page 6.jpg

JPG

Specs - Page 1.jpg

JPG

Specs - Page 160.jpg

JPG

Specs - Page 268.jpg

JPG

Specs - Page 258.jpg

JPG

Specs - Page 318.jpg

JPG

Specs - Page 105.jpg

JPG

Specs - Page 118.jpg

JPG

Addendum #1 - Page 5.jpg

JPG

Specs - Page 41.jpg

JPG

Specs - Page 125.jpg

JPG

Specs - Page 284.jpg

JPG

Specs - Page 16.jpg

JPG

Specs - Page 120.jpg

JPG

Specs - Page 255.jpg

JPG

Specs - Page 376.jpg

JPG

Specs - Page 314.jpg

JPG

Specs - Page 304.jpg

JPG

Specs - Page 69.jpg

JPG

Specs - Page 123.jpg

JPG

Specs - Page 11.jpg

JPG

Specs - Page 82.jpg

JPG

Specs - Page 158.jpg

JPG

Specs - Page 169.jpg

JPG

Specs - Page 179.jpg

JPG

Specs - Page 354.jpg

JPG

Specs - Page 297.jpg

JPG

Specs - Page 161.jpg

JPG

Specs - Page 307.jpg

JPG

Specs - Page 273.jpg

JPG

Specs - Page 3.jpg

JPG

Specs - Page 173.jpg

JPG

Specs - Page 9.jpg

JPG

Specs - Page 213.jpg

JPG

Specs - Page 286.jpg

JPG

Specs - Page 75.jpg

JPG

Specs - Page 165.jpg

JPG

Specs - Page 175.jpg

JPG

Specs - Page 299.jpg

JPG

Specs - Page 245.jpg

JPG

Specs - Page 102.jpg

JPG

Specs - Page 226.jpg

JPG

Specs - Page 332.jpg

JPG

Specs - Page 92.jpg

JPG

Specs - Page 32.jpg

JPG

Specs - Page 234.jpg

JPG

Specs - Page 172.jpg

JPG

Specs - Page 240.jpg

JPG

Specs - Page 121.jpg

JPG

Specs - Page 216.jpg

JPG

Specs - Page 329.jpg

JPG

Specs - Page 46.jpg

JPG

Specs - Page 356.jpg

JPG

Specs - Page 291.jpg

JPG

Specs - Page 260.jpg

JPG

Specs - Page 217.jpg

JPG

Specs - Page 96.jpg

JPG

Plans - Page 8.jpg

JPG

Specs - Page 79.jpg

JPG

Specs - Page 259.jpg

JPG

Specs - Page 98.jpg

JPG

Specs - Page 210.jpg

JPG

Specs - Page 363.jpg

JPG

Specs - Page 115.jpg

JPG

Specs - Page 21.jpg

JPG

Specs - Page 71.jpg

JPG

Specs - Page 313.jpg

JPG

Specs - Page 157.jpg

JPG

Specs - Page 227.jpg

JPG

Specs - Page 335.jpg

JPG

Specs - Page 133.jpg

JPG

Specs - Page 369.jpg

JPG

Specs - Page 206.jpg

JPG

AI Contract Breakdown

Uniform Contract Format

What is UCF?

Uniform Contract Format (UCF) uses AI to break down any contract into standardized sections—scope, pricing, deliverables, and evaluation criteria.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyState of Washington Military Department
Contacts1 person available
OfficeN/A
Organization / Agency
State of Washington Military Department
View Agency Profile
Office AddressN/A
Contacts
Tiffany Roberts

Interested Companies (12)

Show more
Capital Heating and Cooling
Lacey, WA
Koivu Electric
KINGSTON, WA
VP Electrical Services
Mount Vernon, WA

See All 12 Interested Companies

Start a free trial to view all interested companies, their contact details, and full contractor profiles.

Start Free Trial

Full Description

Show more
Scope of work includes the following: Remove three existing split system heat pumps and replace with VRF system consisting of three indoor units with electric duct heaters and one outdoor unit. Enlarge the existing mechanical mezzanine access and provide a pull-down ladder.
Pre-Bid Meeting: Mandatory: 7/30 @ 10:00 am at Building 8, Camp Murray, WA 98430

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 650+ contractors already using CLEATUS