Canyon Lake Hybrid Treatment Process - Phase 1

Forecast
LES-1067State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The Canyon Lake Hybrid Treatment Process - Phase 1, solicitation LES-1067, is an environmental project led by the City of Canyon Lake and the Lake Elsinore and San Jacinto Watersheds Authority (LESJWA) to manage phosphorus levels and control algal blooms. Building upon a pilot program initiated in 2013 and extended through 2025, the current project is a minor modification to extend alum applications for an additional five years through 2030. The scope of work involves applying alum to the Main Body, the East Bay, and the transition area from the San Jacinto River near Vacation Drive. The program provides increased operational flexibility, allowing the Task Force to determine the timing and conditions of applications to maximize effectiveness and minimize unintended impacts. Stakeholders may perform up to two alum applications annually per area, potentially resulting in up to six total application events across the lake. All activities are subject to the review and approval of the Santa Ana Water Quality Control Board and must adhere to mitigation measures established in the 2013 Initial Study to prevent contamination and accidental spills. Project administration is managed by Rick Whetsel of LESJWA and Jim Morrissey of the City of Canyon Lake.

General Info

Canyon Lake alum applications extended through 2030 to control phosphorus and algal blooms.

Agency

California → City of Canyon Lake

Place of Performance

Vacation Drive, Canyon Lake, CA, 92587

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseForecast
Posted

forecast

Prepare for this forecast

Research the agency, track this forecast, and prepare your capture plan before the solicitation opens.

Organization & Contact Information

Show more
AgencyCalifornia → City of Canyon Lake
Contacts2 people available
OfficeN/A
Organization / Agency
California → City of Canyon Lake
Office AddressN/A
Contacts
Rick WhetselInterim LESJWA Administrative Manager
Jim MorrisseyContract City Planner

Full Description

Show more
In 2013, the City of Canyon Lake prepared an Initial Study to evaluate the environmental effects of a pilot alum application program in Canyon Lake. During the pilot program, 840 tons of alum was applied to Canyon Lake in five separate events (Sept., 2013, Feb., 2014, Sept., 2014, April, 2015 and Sept., 2015). The Initial Study states that after the five pilot applications were completed, the Lake Elsinore Canyon Lake Total Maximum Daily Load (TMDL) Task Force (Task Force) agencies would evaluate water quality data from the Lake to determine whether the alum was working as intended, to confirm that there were no adverse environmental effects, and to decide whether additional applications were necessary and appropriate. That evaluation was conducted and reported in the TMDL Progress Report for Evaluation of Compliance with the 2015 Interim Response Targets. In the interim period following the adoption of the 2013 IS/MND, Addendum No. 1 was prepared to in response to the stakeholders’ desire to extend the pilot alum application program in the lake for the next 10 years (2015-2025). Subsequent updates to the effectiveness of alum additions were incorporated into the 2020 TMDL Compliance Demonstration Report (Lake Elsinore and San Jacinto Watersheds Authority (LESJWA), 2021) and annually, in the Riverside County stormwater program report appendices. The current proposal is to continue the phosphorus applications to Canyon Lake for up to five additional years. If this extension is approved/authorized by LESJWA, the Canyon Lake phosphorus applications can be continued as necessary for the next 5 years, i.e., through 2030, subject to Santa Ana Water Quality Control Board review and approval of the existing offsets program as required by the Revised Total Maximum Daily Load for nutrients in Lake Elsinore and Canyon Lake (adopted by the Santa Ana Water Board on July 25, 2025). Thus, the proposed minor modification to the previously approved project is: 1) The extension of the pilot alum application program in Canyon Lake for the next 5 years. 2) Continue treating the transition area immediately above the north causeway (Vacation Drive) at the confluence between the San Jacinto River and Canyon Lake. 3) Provide additional flexibility to apply alum at times and under water quality conditions that will assure the highest level of effectiveness and the lowest potential for any unintended impacts. Greater flexibility in timing is a new operational measure that was developed based on knowledge and experience gained from the pilot program. 4) Provide additional flexibility to make alum applications in the Main Body and in the East Bay of Canyon Lake at different times of year. The decision as to when and how the alum will be applied will be made by the Task Force after consulting with the alum application contractor, their internal consulting team, and the Santa Ana Water Board. 5) Clarify that the program allows, but does not require, stakeholders to make up to two alum applications annually. And, if the alum applications for the Main Body and the East Bay occur at different times, this may result in up to a total of six application events on the Lake (e.g. 2 x Main Body, 2 x San Jacinto/lake interface, and 2 x East Bay). The documentation in this Addendum, combined with the adopted 2013 MND and Initial Study, will serve as the basis for this second tier environmental review of the proposed continued alum treatment program. The alum treatment will continue to be carried out in the Main Body, East Bay, and transition area from the San Jacinto River.

Similar Contracts

Same NAICS industry code

NAICS: 562910
New
Theatre Mold Remediation Scope of Work
Solicitation # AT25-0006
Solicitation AT25-0006 is a subcontracting opportunity with Adams and Associates, Inc. for comprehensive mold remediation at Theater Building 1086 of the Atterbury Job Corps Center in Edinburgh, Indiana. The project was necessitated by a sprinkler system failure and requires the remediation of mold throughout the entire building, including the cleaning or replacement of damaged theater seating cushions. All work must be performed in accordance with ANSI/IICRC S520 Standards for Professional Mold Remediation, EPA guidelines, and OSHA regulations, with Indiana state laws prevailing if they are more stringent. Key requirements include the provision of a Certified Industrial Hygienist for daily site visits, a detailed remediation plan featuring HEPA filtration and negative air pressure, and a final clearance walkthrough. The contract is awarded on a best-value basis, evaluating price (60 points), quality (20 points), past performance (10 points), and schedule (10 points). Bidders must submit a single lump sum proposal on company letterhead, including a detailed cost breakdown, a timeline for substantial completion, and a 90-day bid guarantee. Mandatory requirements for submission include attendance at the pre-bid site visit, proof of a valid Indiana Contractor's License, and certification of compliance with Davis-Bacon Act wage rate decisions. Additionally, contractors must provide proof of automobile liability and workers compensation insurance, naming Adams and Associates, Inc. as an additional insured. Payment terms are Net 30, and work must commence within 14 days of the Notice to Proceed.
Atterbury Job Corps Center

POSTED

about 6 hours ago

DEADLINE

in 2 days
View Details
NAICS: 562910
New
SLED
C5613679-D - ASBESTOS ABATEMENT, LEAD-BASED PAINT, LEAD-CONTAINING PAINT, LEAD-CONTAINING MATERIALS AND MOLD REMOVAL SERVICES
Solicitation # C5613679-D
This Master Agreement establishes a contract for the California Department of Corrections and Rehabilitation (CDCR) to obtain as-needed services for the cleaning, removal, transport, and disposal of hazardous materials, including asbestos-containing construction materials, lead-based paint, lead-containing materials, and mold-contaminated materials. The scope of work covers various CDCR institutions and facilities, such as High Desert State Prison, Ironwood State Prison, and Kern Valley State Prison. The contractor is responsible for all associated costs, including labor, equipment, personal protective equipment, and disposal fees, with compensation based on the Public Works Rate Sheet. Key performance requirements include a four-hour response time for emergency abatement and a strict submittal process that must be completed five business days before site work begins. The contract is awarded to the lowest responsive bidder, with preferences granted to California-based companies and certified Small, Micro, or Disabled Veteran Business Enterprises. Compliance with Federal, State, and local laws is mandatory, specifically Title 17 of the California Code of Regulations for lead abatement and Senate Bill 854 for prevailing wage requirements. Contractors must provide proof of pollution liability insurance and a payment bond upon award. Work is generally performed Monday through Friday from 6:30 AM to 3:00 PM, and the CCM Site Supervisor serves as the sole authority for determining the acceptance and satisfactory completion of all work.
California Department of Corrections & Rehabilitation

POSTED

about 7 hours ago

DEADLINE

in 28 days
View Details
NAICS: 562910
New
SLED
Range Backstop Rebuild
Solicitation # 26-493ISP-OPERA-B-54769
The Illinois State Police is soliciting a contractor for the Range Backstop Rebuild under solicitation 26-493ISP-OPERA-B-54769. The project requires the contractor to rebuild a bullet trap backstop within a strict 10-day range closure window. The scope of work includes furnishing and installing approximately 34,000 pounds of new granular rubber media, leveling and grading the trap according to manufacturer specifications for ballistic performance, and removing displaced rubber and debris using methods that prevent the spread of lead-contaminated dust. The vendor must act as the hazardous waste generator, managing all manifests, labeling, and documentation for lead-contaminated materials. Due to the nature of the work, the contractor must adhere to stringent safety and environmental regulations, including OSHA Lead and Respiratory Protection Standards and EPA RCRA hazardous waste requirements. All lead-contaminated waste and PPE must be packaged in UN-DOT approved containers. To be eligible for award, the vendor must provide a detailed work plan and schedule, a site-specific safety plan covering RCRA waste management, and manufacturer specifications for the rubber media. Additionally, the vendor must maintain comprehensive insurance, specifically including 10 million dollars in Lead Pollution Liability insurance. Payments are processed upon contract completion or based on agreed-upon milestones in accordance with the State Prompt Payment Act.
OPERATIONS493 - Operations

POSTED

about 7 hours ago

DEADLINE

in 10 days
View Details
NAICS: 562910
New
SLED
Mold Remediation at the Town Hall
Solicitation # BD-24-1688-TOW94-TOW-135194
The Town of Wendell is seeking professional contracting services for mold remediation in the men's and women's bathrooms and the repair of water damage in the basement utility room at the Town Hall located at 6 Center St., Wendell, MA. The contractor is responsible for providing all necessary labor, equipment, and technical expertise, including the installation of temporary containment barriers in bathrooms and the use of fans, dehumidifiers, or ozone machines to dry the basement. To maintain operational continuity, the contractor must ensure that at least one bathroom remains available at all times. Specific technical requirements include the use of HEPA rated filters for vacuuming, the installation of 1/2 inch MR gypsum board with three coats of joint compound, and a painting process consisting of one coat of seal/prime and two coats of glossy paint. Additionally, the vinyl sheet product must be Tarkett Performa Stonework Dover 55031. This public works project is subject to prevailing wage rules, and a certificate of insurance is required upon bid acceptance. The scope of work specifically excludes duct cleaning and furnace servicing. Contractors must report any hidden issues discovered during subfloor and wall cavity inspections to the project manager, and the use of ozone machines must be supervised by the facilities engineer. The solicitation, numbered BD-24-1688-TOW94-TOW-135194, has a bid opening date of November 18, 2026, with a project walk-through scheduled for November 12, 2026. Electronic quotes are permitted through the procurement system.
Town of Wendell

POSTED

about 12 hours ago

DEADLINE

in 12 days
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Prepare for this forecast

Research this forecast and prepare for the solicitation

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS