7-Eleven Store No. 13799 and Former Quick Quality Cleaners Removal Action Workplan

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The project involves implementing a Removal Action Workplan to address volatile organic compound (VOC) contamination, primarily tetrachloroethene (PCE), at a 0.6-acre commercial site in Tustin, California, formerly home to a 7-Eleven store and a dry-cleaning business. Approximately 1,210 cubic yards of impacted soil will be excavated during the construction of a new underground storage tank basin as part of an approved redevelopment plan and transported offsite to a licensed disposal facility, with an estimated 101 truckloads expected over a six-week period. Following excavation, soil vapor conditions will be reassessed to determine if a soil vapor extraction (SVE) system is necessary to mitigate vapor intrusion risks, with a conceptual design involving multiple-depth SVE wells, granulated activated carbon, and a knock-out tank based on pilot testing results. All activities are conducted under a Standard Voluntary Agreement with the California Department of Toxic Substances Control and must comply with South Coast Air Quality Management District rules governing VOC emissions, particulate matter, and dust control, including ambient air monitoring by a Certified Industrial Hygienist and use of a Various Locations Plan for emissions compliance. The project must halt immediately if biological, cultural, historical resources, or human remains are discovered, requiring notification of appropriate authorities under state law. The site redevelopment includes replacing the existing 7-Eleven structure and installing fuel dispensing infrastructure across both properties, with remediation activities coordinated to align with construction timelines and regulatory oversight. The total project cost is capped at $1 million to qualify for a categorical environmental exemption under California law, though no formal contract pricing or line-item breakdowns are specified.

General Info

Excavate 1,210 cubic yards of VOC-contaminated soil, assess vapor intrusion, install SVE if needed, comply with California regulations, halt for cultural finds, cap cost at $1 million.

Agency

California Toxic Substances Control, Department of

NAICS

562910 - Remediation ServicesView NAICS

Place of Performance

16791 and 16795 McFadden Avenue, Tustin, CA, 92780

Set-Aside

NONE

Documents

(1)

7-Eleven Store No. 13799 Removal Action Workplan Notice of Exemption

PDFnotice-of-exemption

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia Toxic Substances Control, Department of
Contacts2 people available
OfficeN/A
Organization / Agency
California Toxic Substances Control, Department of
Office AddressN/A
Contacts
Jennifer DartSenior Manager, Environmental Services

Full Description

Show more
Project Description: The project consists of implementing the 7-Eleven Store No. 13799 and Former Quick Quality Cleaners Removal Action Workplan (RAW). The goal of the RAW is to address volatile organic compounds (VOCs) contamination in soil vapor on an approximately 0.6-acre commercial parcel located at 16791 and 16795 McFadden Avenue in the city of Tustin (Site). The project activities consist of the excavation and offsite disposal of approximately 1,210 cubic yards (CYs) of VOC-impacted soil along with potential installation and operation of a soil vapor extraction (SVE) system. Background: The Site is currently occupied by a 7-Eleven-branded convenience store. Adjacent to the eastern side of the existing building was a second suite that included a former dry-cleaning business and laundromat. The building was demolished in August 2023, and the footprint of the former building currently consists of bare dirt. The former dry-cleaning/laundromat suite and the 7-Eleven building are located in the central portion of the Site. The Site is part of an approved redevelopment project that entails demolition of the existing 7-Eleven-branded convenience store, construction of a replacement building on the east-adjacent vacant property, and the installation of fuel dispensing infrastructure across both properties (including an underground storage tank (UST) basin on the southern portion of the Site). The City of Tustin approved the project on December 22, 2020, and filed a Notice of Exemption (Class 32) dated February 2, 2021. In March 2021, 7-Eleven entered into a Standard Voluntary Agreement (Docket No. HSA-FY20/21-081) with the Department of Toxic Substances Control (DTSC), for the investigation and remediation of subsurface impacts at the Site. Previous Investigations: Historical Site investigation activities assessed Site soil, soil vapor, and groundwater for VOCs because of the former operation of a dry-cleaning facility at the Site. Limited soil assessment was also conducted to evaluate potential petroleum hydrocarbon and metals impacts. The RAW addresses VOCs previously identified in Site soils and VOCs (most notably tetrachloroethene (PCE)) likely present in Site soils based on observed vapor phase VOC concentrations. In February 2019, a Phase I Environmental Site Assessment (ESA) was completed for the Site. According to the ESA, Quick Quality Cleaners occupied an eastern tenant space of previous commercial building on the Site (16795 McFadden Avenue) from at least 1980 to 2014. Permits were issued to the facility in 1983 and 1998 for the operation of on-site dry-cleaning equipment that utilized PCE. In March 2019, as part of a Phase II ESA, four soil borings and four sub-slab soil vapor probes were advanced to analyze underlying soil. PCE was detected in all analyzed soil and soil vapor samples. All the detected PCE vapor concentrations in the sub-slab probes exceeded the DTSC screening levels (SL) and the San Francisco Bay Regional Water Quality Control Board’s (SFBRWQCB’s) Environmental Screening Level (ESL) for sub-slab commercial soil vapor. Between June and October 2020, two soil vapor extraction events occurred. Subsequently, soil vapor samples showed a rebound in vapor concentrations over time. On August 25, 2023, 7-Eleven removed the concrete slab at the former dry-cleaning suite in the area of the former dry-cleaning equipment. The demolition activities were conducted under the oversight of DTSC. Ambient air monitoring and field soil screening were conducted during demolition activities for chlorinated solvents. PCE vapors were not detected in the ambient air or in surface soil during removal activities. During May 2025, a 4-day SVE pilot test was conducted, during which a trailer-mounted SVE system was operated to extract vapors from existing SVE wells. Lastly, during May and June 2025, five triple-nested soil vapor probes were installed and sampled on the east-adjacent vacant property to evaluate soil vapor conditions in preparation for upcoming redevelopment of the property and the Site. PCE, the primary VOC of concern on the Site, was detected in soil vapor samples collected below the SL for indoor air in a commercial/industrial land use scenario. No other VOCs were detected at concentrations that exceeded their respective RSLs or (when established) SLs for indoor air in a commercial/industrial land use scenario. The RAW was prepared to facilitate remedial actions (i.e., soil excavation) at the Site during the redevelopment activities, associated post-excavation confirmation soil and soil vapor sampling activities, and subsequent remedial actions (potential installation and operation of an SVE) to be performed after Site redevelopment. Project Activities: Based on the proposed Site redevelopment activities, approximately 1,210 CY of potentially VOC-impacted soil will be excavated during the construction of the UST basin and transported offsite for disposal at an appropriately licensed facility. The proposed excavation area will be located inside the footprint of the proposed UST basin associated with Site redevelopment. Assuming trucks will be loaded to hold 18 CYs of soil, and the excavation and loading process results in a 50% increase in volume, it will take approximately 101 truckloads to remove the anticipated volume of waste soil from the Site over a period of approximately 6 weeks. Based on the observed concentrations of VOCs (particularly PCE) in soil vapor beneath the Site and the lack of delineation of vapor phase VOC concentrations, an SVE system may be installed and operated at the Site to remove vapor phase VOCs present in the subsurface and to limit potential off-site migration of vapor-phase VOCs. However, excavation of potentially VOC-impacted soil as proposed above may result in a localized reduction in observed vapor phase VOC impacts. Therefore, following completion of the proposed soil excavation activities and assessment of the west-adjacent property, soil vapor conditions will be reevaluated, and the need of further remediation will be confirmed. The RAW does not include design specifications for an SVE system that may be installed at the Site. If Site conditions are still found to warrant remediation following the soil excavation and western-adjacent property assessment, a remedial design package will be prepared for installation of an SVE system at the Site to mitigate potential vapor intrusion concerns associated with vapor phase VOCs present in soil across the Site. Based on currently available data, the conceptual design of the SVE system entails the installation of a network of SVE wells screened at multiple depth intervals. Based on the observed mass recovery rates during the recent SVE pilot testing, vapor abatement will likely involve the use of granulated activated carbon and a knock-out tank for capturing entrained moisture. The vacuum extraction blower sizing and associated electrical service requirements will be dictated by the designed network of vapor extraction wells. The activities described in this RAW are subject to South Coast Air Quality Management District (SCAQMD) Rule 1166 – Volatile Organic Compound Emissions from Decontamination of Soil. Because the quantity of potentially impacted soil to be disturbed (less than 2,000 CYs), a Various Locations Plan will be utilized in lieu of preparation of a Site-specific compliance plan to describe the measures and monitoring to be implemented to identify and limit potential emissions of VOCs from impacted soils. The project is also subject to the provisions of SCAQMD Rule 1466 – Control of Particulate Emissions from Soils with Toxic Air Contaminants. Ambient monitoring of particulate matter smaller than 10 micrometers (PM10), appropriate signage, stockpile covering, and recordkeeping will be completed in accordance with the provisions of Rule 1466. On-site activities will also be completed to adhere to SCAQMD Rule 403 – Dust Control, to minimize emission of fugitive dust. Monitoring will be conducted during all soil disturbance activities by qualified technicians under the supervision of a Certified Industrial Hygienist. Although not anticipated, in the event biological, cultural or historical resources are discovered in the course of project activities, work will be suspended while a qualified biologist, cultural or historical specialist makes an assessment of the area and arrangements are made to protect or preserve any resources that are discovered. If human remains are discovered, no further disturbance will occur in the location where the remains are found, and the County Coroner will be notified pursuant to the Health and Safety Code, Chapter 2, Section 7050.5.

Similar Contracts

Same NAICS industry code

NAICS: 562910
New
902/903 Dorm Mold Remediation & Removal
Solicitation # 902/903 Dorm Mold Remediation and Removal
This contract is for mold remediation and removal services at the Earle C. Clements Job Corps Center in Morganfield, Kentucky, targeting life safety and environmental deficiencies in two dormitory buildings—0902 and 0903—where visible mold growth and moisture intrusion have been identified. The scope includes removing contaminated materials such as drywall, insulation, ceiling finishes, and other affected surfaces, followed by thorough cleaning, sanitization, dehumidification, and restoration to match original conditions. Work must comply with EPA guidelines and IICRC S520 standards, utilizing negative air pressure, HEPA filtration, and proper containment procedures. All hazardous materials must be handled and disposed of according to federal, state, and local regulations, with Safety Data Sheets submitted for any chemicals used. Daily debris removal and secure storage of materials are required, and post-remediation verification including air quality testing must be provided. The total remediation area covers approximately 1,760 square feet in each building, with all work to be completed within 60 consecutive business days after receipt of a Notice to Proceed, beginning no later than five business days after the agreed-upon start date established during a mandatory pre-construction meeting. The contract is a fixed-price, single lump sum award with an estimated value between $25,000 and $100,000. Bidders must submit a detailed cost breakout on company letterhead, itemizing labor, materials, equipment, permits, disposal, testing, bonds, subcontractor costs, overhead, and profit, along with three comparable project references. A bid bond equal to 20% of the base bid is required if the bid equals or exceeds $25,000, and performance and payment bonds at 100% of the contract value are mandatory under the same threshold. Contractors must hold valid insurance, including worker’s compensation with $500,000 employer liability, general liability of $1 million per occurrence and $3 million aggregate, and other applicable coverages. Wage rates must comply with the Construction Wage Rate Requirements and Executive Order 13658, and certified payroll must be submitted weekly using AIA G702 and G703 forms. Retainage of 10% will be held until substantial completion and final acceptance. Additionally, bidders must complete a physical site visit with signed attendance, provide a completed MTC Supplier Packet including Form W-9 and self-certification, and
Earle C. Clements Job Corps Center

POSTED

about 12 hours ago

DEADLINE

in 1 day
View Details
NAICS: 562910
New
Mold Remediation
Solicitation # mold-remediation
The contract seeks a licensed mold remediation contractor to perform remediation services at the Solo Parent Dormitory within the Flint Hills Job Corps Center located in Manhattan, Kansas. Work is required in specific areas including rooms 208, 209, 210, 302, 310, and the 300 hallway linen closet, with a strict performance period of 10 business days. The contractor must adhere to the IICRC S520 Mold Remediation Standard, EPA guidelines, OSHA regulations, and Job Corps safety and facility standards. All work must include mold assessment, site preparation, containment using critical barriers and HEPA negative air machines, removal and disposal of contaminated porous materials like drywall, insulation, and carpeting, surface sanitization with EPA-registered antimicrobial or fungicide treatments, and a comprehensive post-remediation verification process that includes visual inspections, air and surface sampling, and a written report with lab results and photographs. Waste must be properly bagged, sealed, and disposed of in accordance with all regulatory requirements. The contractor must also provide an initial assessment report, daily work logs, and a minimum one-year warranty on the remediation work. The solicitation is restricted to small business set-asides including Small Business, Small Disadvantaged Business, Women-Owned Small Business, HUBZone, Veteran-Owned Small Business, and Service-Disabled Veteran-Owned Small Business. Proposals must include a vendor’s W-9 and DUNS number and a detailed pricing schedule broken down into labor hours, total labor cost, materials, other expenses, and the total price. The contract is subject to Davis-Bacon prevailing wage requirements, and successful offerors must submit an SF-1413 form and, if the award exceeds $30,000, the Serrato 542 form. Proof of applicable licenses and a Certificate of Liability Insurance naming the Job Corps Center as both certificate holder and additional insured are mandatory. Proposals are evaluated solely on price and price-related factors under a pass/fail compliance gate—any failure to meet material requirements in the solicitation will result in disqualification. The award will go to the most advantageous proposal based entirely on price and related criteria. All submissions must be received by 4:00 PM CST on August 13, 2026.
Serrato Corporation DBA Flint Hills Job Corps

POSTED

about 12 hours ago

DEADLINE

in 5 days
View Details
NAICS: 562910
New
Federal
Hazardous Material Abatement and DisposalThe contract titled Hazardous Material Abatement and Disposal outlines the critical tasks of identifying, containing, and safely disposing of hazardous substances including asbestos, lead-based paint, and PCBs during demolition activities at a site in Lemont, Illinois, with a ZIP code of 60439. This subcontract, posted on August 7, 2026, requires respondents to meet strict safety and regulatory standards for handling materials that pose significant health and environmental risks, ensuring compliance with federal and state protocols throughout the abatement process. The response deadline is set for August 27, 2026, emphasizing the urgency and precision needed in planning and execution. The work is being procured under NAICS code 562910, which classifies it under Other Remediation Services, and it is being managed by Argonne National Laboratory, a Department of Energy contractor, indicating the federal involvement and high-level oversight of the project. Performance is expected to occur entirely within Lemont, with no indication of remote or multiple-site work. While the solicitation number and point of contact details are not provided, the contract underscores the necessity for qualified contractors with demonstrated experience in hazardous material abatement, specialized equipment, certified personnel, and approved disposal facilities, with all operations strictly adhering to environmental protection and worker safety guidelines.
Argonne National Labor - DOE Contractor

POSTED

1 day ago

DEADLINE

in 19 days
View Details