Zinfandel Subdivision Project
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
AI Contract Overview
The Zinfandel Subdivision Project, proposed by Randy Gularte, entails the development of a 51-lot residential subdivision on approximately 9.56 acres in Napa, California, featuring 51 single-family homes, 12 accessory dwelling units, and 10 junior accessory dwelling units, along with associated infrastructure improvements. The existing structures on the site—including a single-family dwelling, detached garage, and private pedestrian bridge—will be demolished, and the current vineyards and 42 trees will be removed to make way for the new development. The project is governed under local planning and environmental review processes, with documentation filed through the California Environmental Quality Act (CEQA) system, and public comments on the Draft Mitigated Negative Declaration were due by September 5, 2025, to the City of Napa’s Community Development Department. The project's environmental compliance efforts include extensive soil and chemical testing, referencing EPA methods such as 8082 and SW8000 series protocols for analyzing pesticides, metals, and volatile organic compounds. Sample collection occurred at multiple on-site locations, with preservation standards mandating pH control for metal samples, zero headspace for VOCs, and chilling via ice chests during transport. Chain of custody documentation, barcoded labels, and laboratory verification through accredited facilities like SGS Rocklin and McCampbell Analytical ensure analytical integrity. Billing and payment for environmental testing services are handled through CKG Environmental, with invoicing routed to their accounts payable in St. Helena and managed via WaterTrax, EQUiS, and CLIP systems, though no formal federal contracting structure, pricing data, or acquisition clauses are present. The City of Napa acts as the lead agency, with Michael Allen serving as Interim Planning Manager and Laura Campion as the project’s technical liaison, while the project applicant, Randy Gularte, coordinates directly with environmental consultants. Although numerous soil-related field protocols and sample handling procedures are detailed, they are operational in nature and do not constitute federal contract clauses, and no procurement-specific information such as contract value, evaluation factors, solicitation numbering, or socioeconomic certifications appears in the materials.
General Info
Agency
NAICS
Place of Performance
El Centro Avenue; Moss Lane, Napa, CA, 94558Set-Aside
Timeline
Organization & Contact Information
Interested Companies (1)
Full Description
Similar Contracts
Same NAICS industry code
