Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

Zinfandel Subdivision Project

Forecast
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The Zinfandel Subdivision Project, led by applicant Randy Gularte and the City of Napa, involves the development of a 51-lot residential subdivision on approximately 9.56 acres in Napa, California. The project consists of 51 single-family homes, 12 accessory dwelling units, and 10 junior accessory dwelling units. Development requires the demolition of an existing single-family dwelling, a detached garage, and a private pedestrian bridge, as well as the removal of existing vineyards and 42 trees. Key infrastructure improvements include off-site construction along the Salvador Channel and the dedication of a 10-foot-wide right-of-way along the El Centro frontage to enhance the pedestrian network. The project is governed by the California Environmental Quality Act, with a Final Mitigated Negative Declaration issued on December 4, 2025. Environmental compliance measures include a soil mitigation plan overseen by Napa County Environmental Health to address lead concentrations, adhering to EPA and Cal/OSHA standards. Biological resource protections are in place to manage the removal of native trees and protect jurisdictional wetlands and waters. Additionally, the project must comply with City of Napa Design Guidelines regarding grading, drainage, and landscaping, while coordinating with Caltrans for transportation management and road restoration following pipeline installation.

General Info

Randy Gularte and Napa City develop 51-lot residential subdivision on 9.56 acres.

Place of Performance

El Centro Avenue; Moss Lane, Napa, CA, 94558

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseForecast
Posted

forecast

Prepare for this forecast

Research the agency, track this forecast, and prepare your capture plan before the solicitation opens.

Organization & Contact Information

Show more
AgencyCalifornia → City of Napa
Contacts3 people available
OfficeN/A
Organization / AgencyCalifornia → City of Napa
Office AddressN/A
Contacts
Michael AllenInterim Planning Manager
Laura CampionProject Manager
Randy GularteNot Applicable

Interested Companies (1)

FirstCarbon SolutionsIrvine, California

Full Description

Show more
The project applicant, Randy Gularte, proposes to develop a 51-lot subdivision containing 51 single-family homes, 12 accessory dwelling units (ADUs), 10 junior ADUs, and related improvements on approximately 9.56 acres. The existing single-family dwelling, the detached garage, and the private pedestrian bridge on the project site would be demolished. Additionally, the existing vineyards on the project site would be removed, as well as 42 trees.

Similar Contracts

Same NAICS industry code

NAICS: 562910
New
Theatre Mold Remediation Scope of Work
Solicitation # AT25-0006
Solicitation AT25-0006 is a subcontracting opportunity with Adams and Associates, Inc. for comprehensive mold remediation at Theater Building 1086 of the Atterbury Job Corps Center in Edinburgh, Indiana. The project was necessitated by a sprinkler system failure and requires the remediation of mold throughout the entire building, including the cleaning or replacement of damaged theater seating cushions. All work must be performed in accordance with ANSI/IICRC S520 Standards for Professional Mold Remediation, EPA guidelines, and OSHA regulations, with Indiana state laws prevailing if they are more stringent. Key requirements include the provision of a Certified Industrial Hygienist for daily site visits, a detailed remediation plan featuring HEPA filtration and negative air pressure, and a final clearance walkthrough. The contract is awarded on a best-value basis, evaluating price (60 points), quality (20 points), past performance (10 points), and schedule (10 points). Bidders must submit a single lump sum proposal on company letterhead, including a detailed cost breakdown, a timeline for substantial completion, and a 90-day bid guarantee. Mandatory requirements for submission include attendance at the pre-bid site visit, proof of a valid Indiana Contractor's License, and certification of compliance with Davis-Bacon Act wage rate decisions. Additionally, contractors must provide proof of automobile liability and workers compensation insurance, naming Adams and Associates, Inc. as an additional insured. Payment terms are Net 30, and work must commence within 14 days of the Notice to Proceed.
Atterbury Job Corps Center

POSTED

about 4 hours ago

DEADLINE

in 2 days
View Details
NAICS: 562910
New
SLED
C5613679-D - ASBESTOS ABATEMENT, LEAD-BASED PAINT, LEAD-CONTAINING PAINT, LEAD-CONTAINING MATERIALS AND MOLD REMOVAL SERVICES
Solicitation # C5613679-D
This Master Agreement establishes a contract for the California Department of Corrections and Rehabilitation (CDCR) to obtain as-needed services for the cleaning, removal, transport, and disposal of hazardous materials, including asbestos-containing construction materials, lead-based paint, lead-containing materials, and mold-contaminated materials. The scope of work covers various CDCR institutions and facilities, such as High Desert State Prison, Ironwood State Prison, and Kern Valley State Prison. The contractor is responsible for all associated costs, including labor, equipment, personal protective equipment, and disposal fees, with compensation based on the Public Works Rate Sheet. Key performance requirements include a four-hour response time for emergency abatement and a strict submittal process that must be completed five business days before site work begins. The contract is awarded to the lowest responsive bidder, with preferences granted to California-based companies and certified Small, Micro, or Disabled Veteran Business Enterprises. Compliance with Federal, State, and local laws is mandatory, specifically Title 17 of the California Code of Regulations for lead abatement and Senate Bill 854 for prevailing wage requirements. Contractors must provide proof of pollution liability insurance and a payment bond upon award. Work is generally performed Monday through Friday from 6:30 AM to 3:00 PM, and the CCM Site Supervisor serves as the sole authority for determining the acceptance and satisfactory completion of all work.
California Department of Corrections & Rehabilitation

POSTED

about 4 hours ago

DEADLINE

in 28 days
View Details
NAICS: 562910
New
SLED
Range Backstop Rebuild
Solicitation # 26-493ISP-OPERA-B-54769
The Illinois State Police is soliciting a contractor for the Range Backstop Rebuild under solicitation 26-493ISP-OPERA-B-54769. The project requires the contractor to rebuild a bullet trap backstop within a strict 10-day range closure window. The scope of work includes furnishing and installing approximately 34,000 pounds of new granular rubber media, leveling and grading the trap according to manufacturer specifications for ballistic performance, and removing displaced rubber and debris using methods that prevent the spread of lead-contaminated dust. The vendor must act as the hazardous waste generator, managing all manifests, labeling, and documentation for lead-contaminated materials. Due to the nature of the work, the contractor must adhere to stringent safety and environmental regulations, including OSHA Lead and Respiratory Protection Standards and EPA RCRA hazardous waste requirements. All lead-contaminated waste and PPE must be packaged in UN-DOT approved containers. To be eligible for award, the vendor must provide a detailed work plan and schedule, a site-specific safety plan covering RCRA waste management, and manufacturer specifications for the rubber media. Additionally, the vendor must maintain comprehensive insurance, specifically including 10 million dollars in Lead Pollution Liability insurance. Payments are processed upon contract completion or based on agreed-upon milestones in accordance with the State Prompt Payment Act.
OPERATIONS493 - Operations

POSTED

about 5 hours ago

DEADLINE

in 10 days
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Prepare for this forecast

Research this forecast and prepare for the solicitation

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS