Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, August 5 at 2:00 PM EDT

Register Free →

Zinfandel Subdivision Project

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The Zinfandel Subdivision Project, proposed by Randy Gularte, entails the development of a 51-lot residential subdivision on approximately 9.56 acres in Napa, California, featuring 51 single-family homes, 12 accessory dwelling units, and 10 junior accessory dwelling units, along with associated infrastructure improvements. The existing structures on the site—including a single-family dwelling, detached garage, and private pedestrian bridge—will be demolished, and the current vineyards and 42 trees will be removed to make way for the new development. The project is governed under local planning and environmental review processes, with documentation filed through the California Environmental Quality Act (CEQA) system, and public comments on the Draft Mitigated Negative Declaration were due by September 5, 2025, to the City of Napa’s Community Development Department. The project's environmental compliance efforts include extensive soil and chemical testing, referencing EPA methods such as 8082 and SW8000 series protocols for analyzing pesticides, metals, and volatile organic compounds. Sample collection occurred at multiple on-site locations, with preservation standards mandating pH control for metal samples, zero headspace for VOCs, and chilling via ice chests during transport. Chain of custody documentation, barcoded labels, and laboratory verification through accredited facilities like SGS Rocklin and McCampbell Analytical ensure analytical integrity. Billing and payment for environmental testing services are handled through CKG Environmental, with invoicing routed to their accounts payable in St. Helena and managed via WaterTrax, EQUiS, and CLIP systems, though no formal federal contracting structure, pricing data, or acquisition clauses are present. The City of Napa acts as the lead agency, with Michael Allen serving as Interim Planning Manager and Laura Campion as the project’s technical liaison, while the project applicant, Randy Gularte, coordinates directly with environmental consultants. Although numerous soil-related field protocols and sample handling procedures are detailed, they are operational in nature and do not constitute federal contract clauses, and no procurement-specific information such as contract value, evaluation factors, solicitation numbering, or socioeconomic certifications appears in the materials.

General Info

51-home subdivision in Napa, CA, with ADUs, infrastructure, and environmental testing under CEQA.

Agency

California → City of Napa

NAICS

562910 - Remediation ServicesView NAICS

Place of Performance

El Centro Avenue; Moss Lane, Napa, CA, 94558

Set-Aside

NONE

Documents

(16)

_3552

ZIP

Zinfandel Subdivision Project Notice of Completion

PDFnotice-of-completion

Zinfandel Estates Biological Resources Assessment August 2024

PDFbiological-resources-assessment

Appendix A - CEQA Guidelines Section 15183 Consistency Checklist COMBINED (1)

PDF

DTSC Comments on Zinfandel Subdivision MND 2025080319

PDFcomment

___Updated Documents and Memo

ZIP

35520019 Zinfandel Subdivision Project Summary Form

PDFenvironmental-summary

35520019 Napa Zinfandel Subdivision Project Final Mitigated Negative Declaration

PDFenvironmental-document

Zinfandel Subdivision Project Tree Removal Memorandum

PDFmemorandum

Zinfandel Subdivision Project 2019 Arborist Report

PDFarborist-report

Caltrans Comment Letter on Zinfandel Subdivision Project Draft IS/MND

PDFcomment-letter

Zinfandel Subdivision Project Soil Investigation Report Appendix B

PDFsoils-investigation-report

35520019 Napa Zinfandel Subdivision Draft Mitigated Negative Declaration

PDFmitigated-negative-declaration

35520019 Zinfandel Subdivision Project Draft Mitigated Negative Declaration

PDFnotice-of-availability

__Memo

PDF

SCH #2025080319 Zinfandel Subdivision Project Memo

PDFmemorandum

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → City of Napa
Contacts3 people available
OfficeN/A
Organization / Agency
California → City of Napa
Office AddressN/A
Contacts
Michael AllenInterim Planning Manager
Laura CampionProject Manager
Randy GularteNot Applicable

Interested Companies (1)

Show more
FirstCarbon Solutions
Walnut Creek, CA

Full Description

Show more
The project applicant, Randy Gularte, proposes to develop a 51-lot subdivision containing 51 single-family homes, 12 accessory dwelling units (ADUs), 10 junior ADUs, and related improvements on approximately 9.56 acres. The existing single-family dwelling, the detached garage, and the private pedestrian bridge on the project site would be demolished. Additionally, the existing vineyards on the project site would be removed, as well as 42 trees.

Similar Contracts

Same NAICS industry code

NAICS: 562910
New
SLED
Lead Hazard Reduction & Healthy Homes Intervention 105 Bank ST, Waterbury, CT
Solicitation # 8896
The City of Waterbury is soliciting sealed bids for Lead Hazard Reduction and Healthy Homes Intervention services at 105 Bank Street in Waterbury, Connecticut, under Bid Number 8896. Bids must be submitted by 10:30 AM on August 26, 2026, and will be publicly opened at that time. Participation in a mandatory pre-bid conference on August 18, 2026, at 10:00 AM at the same address is required for all bidders, and attendance must be confirmed by signing in. The solicitation is issued as an Invitation to Bid and remains open for bidding through the city’s procurement platform. All proposals must be submitted in sealed form to the Director of Purchasing’s office and will not be accepted after the deadline. The contract aims to address lead hazards and promote healthier living conditions in the designated residential property. The opportunity is posted in USD and managed by the City of Waterbury’s procurement office, with primary contact information provided as mmccauley@waterburyct.org. Bidders must register through the official portal to access detailed documents and questions, though the process is conducted offline. The clarification deadline for any questions is set for August 19, 2026, at 2:00 PM, after which no further inquiries will be accepted. No set-aside preferences are indicated, and the solicitation falls under state, local, or educational (SLED) government procurement. Failure to attend the mandatory pre-bid meeting will disqualify a bidder from submission. The project seeks qualified contractors to perform comprehensive interventions to ensure compliance with healthy housing standards.
City of Waterbury

POSTED

about 23 hours ago

DEADLINE

in 25 days
View Details
NAICS: 562910
New
Federal
432 SPTS JP-8 Fuel Spill Remediation and Sampling
Solicitation # F3G3JF6174A001
This solicitation, F3G3JF6174A001, is a combined synopsis and request for proposal issued under FAR Part 12 for commercial services related to the remediation and sampling of JP-8 fuel contamination on Bureau of Land Management land near Creech Air Force Base in Nevada. The effort requires a single mobilization to excavate approximately 70 cubic yards of soil contaminated at or above 100 mg/kg of total petroleum hydrocarbons, properly containerize and transport the hazardous waste to an NDEP-approved facility, backfill with clean native material, and fully restore the site to meet regulatory standards. The contractor must provide all personnel, equipment, materials, and supervision, including a Nevada Certified Environmental Manager to oversee the work and ensure compliance with NDEP, BLM, and federal hazardous waste regulations. Performance must be completed within 60 calendar days from the notice to proceed, with inspection and acceptance occurring at the site under FOB Destination terms, meaning the contractor retains responsibility for transport and delivery until the Government accepts the work on-site. The contract is a total small business set-aside under NAICS code 562910 with a $25 million size standard, and offerors must self-certify their small business status and provide valid UEI and CAGE codes. All bids must be submitted electronically by 1000 PDT on August 7, 2026, and only electronic questions submitted by July 28, 2026, will be considered. Evaluation will follow a lowest price, technically acceptable approach, where the lowest-priced offer that meets all technical requirements—demonstrated through a detailed work plan, compliance with sampling protocols, and proper documentation including disposal manifests and a formal NDEP closure report—will be selected. No trade-offs are permitted, and the Government will not engage in discussions. Technical acceptability is assessed on a binary basis, with adherence to specified analytical methods such as EPA 1311, 6010D, 7470A, and NDEP sampling standards being critical. Contractors must also comply with SAM registration, WAWF invoicing, and representation requirements including certifications regarding tax delinquency, responsibility, and socioeconomic status. Packaging and labeling require compliance with federal hazardous waste transport rules, use of approved containers, and display of UEI and CAGE codes, though no specific MIL-STDs apply. Amendments have been issued to update responses and
FA4861 99 Cons Lgc

POSTED

1 day ago

DEADLINE

in 6 days
View Details
NAICS: 562910
New
Federal
AD / West Gate Chapel Mold Remediation on Eglin AFB, FL
Solicitation # FA282326Q0063
The contract is for comprehensive mold and microbial remediation services at Building 2574, the West Gate Chapel, located at Eglin Air Force Base in Florida, covering approximately 7,000 square feet of facility space. The scope of work requires specialized remediation procedures to address mold and microbial contamination in accordance with industry standards and federal guidelines, with detailed requirements outlined on page 4 of the solicitation. All work must be performed on-site at the designated location, and contractors are expected to comply with military site protocols, environmental safety requirements, and health standards applicable to Department of Defense installations. This solicitation is a Small Business Set Aside, total, under NAICS code 562910 for Remediation Services, open exclusively to small businesses. The solicitation was posted on July 31, 2026, with a response deadline of August 7, 2026, at 6:00 PM ET. The contracting office is part of the Department of Defense, specifically under the FA2823 AFTC PZIO organization, based at Eglin AFB, Florida, with Stella D. Cayer serving as the primary point of contact for inquiries. Proposals must be submitted through the official SAM.gov portal, and successful offerors will be required to complete remediation activities while minimizing disruption to facility operations and ensuring full compliance with all applicable regulations governing federal facility maintenance and environmental health.
FA2823 Aftc Pzio

POSTED

1 day ago

DEADLINE

in 6 days
View Details
NAICS: 562910
New
SLED
Downtown Specific Plan Amendments and Regional Performing Arts Theater EIRThe City of Livermore has approved a construction contract to carry out the remediation of contaminated soil and groundwater at the Livermore Village site, fulfilling Mitigation Measure HAZ-4 from the 2009 Downtown Specific Plan Amendments and Regional Performing Arts Theater Subsequent Environmental Impact Report. This remediation involves the excavation, transportation, and lawful disposal of contaminated materials to address historical soil and groundwater pollution, ensuring the site meets environmental safety standards. The work is essential to enable the previously approved Downtown Livermore Apartments project and aligns with the environmental conclusions of the 2009 SEIR, which determined that such remediation would reduce potential contamination impacts to a less-than-significant level. No changes to the original scope of the project or the mitigation measures have occurred, and no new substantial information has emerged that would necessitate additional environmental review under CEQA Guidelines section 15162. The contract strictly implements the remediation actions already analyzed and approved in the 2009 SEIR, ensuring compliance without requiring a supplement or revision to the prior environmental documentation. The City of Livermore, through its Assistant City Engineer, is overseeing the effort, with the project located entirely within Livermore, California, and tied to the broader goal of advancing residential development in alignment with environmental accountability.
City of Livermore

POSTED

1 day ago

DEADLINE

N/A
View Details
NAICS: 562910
New
SLED
Deadwood Creek Tributaries RestorationThe California Department of Fish and Wildlife has authorized a stream and lakebed alteration agreement to support restoration efforts within the historic Brown Bear Mine property, focusing on three specific components located in Donnelly Gulch, Thorne Gulch, and Deadwood Creek. These actions, approved under Section 1602 of the Fish and Game Code, are designed as minor but critical measures to support broader site remediation by decommissioning a degraded roadway in Donnelly Gulch, placing large woody debris in Thorne Gulch to enhance habitat structure, and removing an abandoned vehicle from Deadwood Creek to eliminate pollution and obstruction. The work is targeted strictly within the existing footprint of the mine site and aims to curb illegal dumping and unauthorized occupation by improving site accessibility and environmental conditions. The project is forecasted under the title Deadwood Creek Tributaries Restoration with a posted date of July 31, 2026, and is being administered by Region 1 of the California Department of Fish and Wildlife, based in Redding and Eureka. Senior Environmental Scientist Philip Cramer serves as the primary point of contact for regulatory oversight, while Mark Lancaster of the Northwest California Resource Conservation and Development Council is the executing agent responsible for implementation. All activities are coordinated through the state’s environmental permitting system, with full documentation available via the provided CEQA Net link, ensuring compliance with state ecological protection standards.
Fish and Wildlife, Region 1 - Northern Region, Redding and Eureka

POSTED

1 day ago

DEADLINE

N/A
View Details