Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, August 19 at 2:00 PM EDT

Register Free →

Pier View Way Bridges and Lifeguard Headquarters and Beachfront Facilities Phase II Project

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The Project involves comprehensive improvements to critical infrastructure and public spaces in Oceanside, California, including the Pier View Way Bridges and Lifeguard Headquarters, the Junior Seau Beach Culture Center, the Junior Seau Amphitheater and Bandshell, and the surrounding pier plaza and public areas. Additional conceptual development is proposed for Betty’s Lot, which envisions elevated built elements above the existing surface parking lot to create a new beachfront park featuring community recreation classrooms, terraced landscaping, and accessible ramped paths. The scope also includes lead and asbestos abatement on the Pier View Way Bridge and Lifeguard Headquarters prior to any restoration or demolition, requiring strict adherence to federal and state hazardous materials regulations, including EPA, OSHA, NIOSH, HUD, and California Title 8 and Title 17 codes. Work must be executed by certified personnel with documented training, respiratory protection, and proper decontamination protocols, and all hazardous waste must be handled, transported, and disposed of in compliance with state licensing requirements. The project is supported by a robust set of technical attachments including conceptual alternatives, as-built plans, cost estimates, seismic deficiency assessments, historic preservation evaluations, sea-level rise analyses, and correspondence with regulatory agencies such as the California Coastal Commission. The project has undergone environmental review with three alternatives analyzed: one focused on core infrastructure upgrades, another incorporating Betty’s Lot development, and a “No Project” baseline. While no formal contract value or pricing structure is available, performance is expected to occur primarily at 301 The Strand N., Oceanside, CA 92054, with the City of Oceanside Engineering Division serving as the controlling authority. Key personnel, including a Senior Civil Engineer and a Senior Project Manager, are designated for coordination, and the City’s Development Services Department manages submittals through the eTrakt portal. All contractors are required to submit detailed plans, permits, contingency protocols, and daily logs, with strict accountability for safety, compliance, and quality control throughout the project lifecycle.

General Info

Oceanside infrastructure upgrades include bridge repairs, beachfront developments, hazardous material abatement, and compliance with state/federal environmental and safety regulations.

Agency

California → City of Oceanside

NAICS

562910 - Remediation ServicesView NAICS

Place of Performance

North Pacific Street, North The Strand, Civic Center Drive, Mission Avenue, Oceanside, CA, 92054

Set-Aside

NONE

Documents

(27)

Appendix A-1 Notice of Preparation for Pier View Way Bridge & Lifeguard Headquarters Project

PDFnotice-of-preparation

Appendix G-2 Built Environment Inventory and Evaluation Report for Pier View Way Bridge Project

PDFreport

Appendix D Oceanside Beachfront Lighting Plan

PDFsow

Appendix K-2 Coastal Hazard and Sea Level Rise Vulnerability Assessment

PDFvulnerability-assessment

Appendix C Landscape Design Plan

PDFspecifications

SCH 2024010611 Pier View Way Bridges and Beachfront Facilities Summary

PDFenvironmental-summary

Appendix H-3 Confidential Paleontological Records Search Results for Oceanside Pier View Way

PDFother

Appendix F Biological Resources Records Search

PDFother

Appendix B-2 Pier View Way HQ Feasibility Study August 2023

PDFfeasibility-study

Appendix K-1 Coastal Hazard and Sea Level Rise Vulnerability Assessment

PDFvulnerability-assessment

Appendix J Storm Water Quality Management Plan - Beachfront Phase II Projects

PDFstorm-water-quality-management-plan

SCH 2024010611 Pier View Way Bridges and Lifeguard Headquarters Environmental Document

PDFnotice-of-completion

Appendix A-3 Scoping Meeting Materials for Pier View Way Bridge & Lifeguard Headquarters and Beachfront Phase II Projects

PDFpresolicitation

Appendix N-3 Summary Data Utilities and Service Systems

PDFother

Appendix M AB 52 Consultation - Native American Tribes Contact List

PDFconsultation-list

Appendix E_AQGHG_TechReport

PDF

Appendix G-1 Cultural Resources Inventory Report for Pier View Way Bridge Project

PDFcultural-resources-report

Appendix I Hazardous Materials Technical Report Oceanside Pier May 2025

PDFhazardous-materials-technical-report

Appendix N-1 Beachfront Phase II Design Plans + Report

PDF

Appendix H-1 Geotechnical Report Oceanside Beachfront Phase II Project

PDFgeotechnical-report

Appendix N-2 Pier View Way Design Plans + Report

PDF

Oceanside Pier View Way Beachfront Facilities Draft PEIR November 2025

PDFprogram-environmental-impact-report

Appendix A-2 NOP Comments - Native American Heritage Commission Response

PDFother

Appendix L Noise Modeling Results for Oceanside Pier View Way Project

PDFsupporting-document

Appendix H-2 Preliminary Foundation Report Pier View Way Bridge and Lifeguard HQ Project

PDFpreliminary-foundation-report

Appendix B-1 Phase II Beachfront Improvements Feasibility Study

PDFfeasibility-study

Oceanside Pier View Way Beachfront Facilities DEIR Notice

PDFspecial-notice

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → City of Oceanside
Contacts2 people available
OfficeN/A
Organization / Agency
California → City of Oceanside
Office AddressN/A
Contacts
Kymberly CorbinSenior Civil Engineer
Jason ReynoldsSenior Project Manager

Interested Companies (1)

Show more
Dudek
Encinitas, CA

Full Description

Show more
The Project consists of proposed improvements to the Pier View Way Bridges and Lifeguard Headquarters, the JSBCC, Junior Seau Amphitheater and Bandshell, along with improvements to the pier plaza and public spaces in between. Conceptual design options for Betty's Lot include built elements atop the existing surface parking lot to support a new beachfront park, community recreation classrooms, and a terraced park with multi-purpose landscaping and ramped paths, are also included as part of the proposed improvements. Due to the range of improvements associated with the Proposed Project, the Draft Program Environmental Impact Report (DPEIR) has analyzed three alternative scenarios: (1) Alternative 1 - Pier View Way Bridges, Lifeguard Headquarters, Lifeguard Support Facilities, JSBCC, Junior Seau Amphitheater/Bandshell, and Community Plaza Area; (2) Alternative 2 includes all the Alternative 1 components along with development of Betty's Lot; and (3) Alternative 3 - No Project Alternative.

Similar Contracts

Same NAICS industry code