Show more

The California Department of Toxic Substances Control is implementing an Interim Removal Action at 201 South Glendale Avenue in Glendale, California, to address soil vapor releases of volatile organic compounds, specifically tetrachloroethene and trichloroethene. These contaminants stem from historical dry-cleaning operations dating back to 1955. The project aims to mitigate vapor intrusion risks for the site and adjacent properties by installing and operating a soil vapor extraction system. The scope of work includes the construction of nine extraction wells, consisting of three shallow wells screened from 5 to 30 feet and six deep wells screened from 65 to 85 feet below ground surface. These wells will be connected via a manifold to a treatment system featuring a water knockout tank and three 2,000-pound carbon adsorption canisters plumbed in series. The system is scheduled to operate continuously for two years, after which the DTSC will evaluate its effectiveness and the remaining risk to human health to develop a final remedial approach. The project requires permits from the South Coast Air Quality Management District and the City of Glendale.

General Info

DTSC will install soil vapor extraction systems in Glendale to remove organic contaminants.

Agency

California Toxic Substances Control, Department of

Place of Performance

Glendale, CA, 90025

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

PhaseForecast
Posted

forecast

Prepare for this forecast

Research the agency, track this forecast, and prepare your capture plan before the solicitation opens.

Organization & Contact Information

Show more
AgencyCalifornia Toxic Substances Control, Department of
Contacts2 people available
OfficeN/A
Organization / Agency
California Toxic Substances Control, Department of
Office AddressN/A
Contacts
Bahareh ErtezaeiProject Manager
Thomas SchmidtRepresentative

Full Description

Show more
Project Description: The project consists of installation and operation of a soil vapor extraction (SVE) system to address soil vapor releases from Palace Cleaners located at 201 South Glendale Avenue in the city of Glendale (Site). The project activities consist of constructing nine new extraction wells as part of the overall SVE system. The SVE will be implemented to address elevated volatile organic compounds (VOCs) concentrations in soil vapor at the Site and adjacent properties while a final comprehensive remedial approach is developed to address the VOCs. Background: The Site is located in a mixed commercial and residential area and consists of two adjoining buildings and a parking lot. It consists of two adjoining buildings and a parking lot Palace Cleaners occupies one of the buildings (201 South Glendale Avenue) and Best Liquor Meat and Deli occupies the second building (205 South Glendale Avenue) covers approximately 0.1 acres. The Site is bound to the south by Shiraz Restaurant and Banquet Hall, to the west by an alley and parking lot, to the north by commercial and residential apartment buildings across East Harvard Street, and to the east by commercial buildings across South Glendale Avenue. Dry-cleaning operations began at the Site in approximately 1955 which included Palace Cleaners from 1955 to the present, and Norge Coin Operated Laundry & Dry-Cleaning Village that operated at 205 South Glendale Avenue between approximately 1961 and 1972. The dry-cleaning solvent tetrachloroethene (PCE) was used at Palace Cleaners between 1955 and March 2017, after which the PCE machine was replaced by a dry-cleaning machine using a petroleum hydrocarbon solvent. Previous Investigations: Based on previous investigations the contaminants concern include PCE and trichloroethene (TCE) in soil vapor because these exceeded applicable regulatory screening criteria. Soil vapor releases of VOCs have been identified at and in the vicinity of the Site through multiple environmental investigations conducted since 2016. A total of 33 soil samples have been collected at depths ranging from 5 feet to 130 feet below ground surface (bgs) and PCE was detected at 5 feet bgs in 3 soil samples. A total of 74 soil vapor probes have been installed at depths ranging from 5 feet 130 feet bgs and PCE has been detected in all soil vapor samples. In addition, sub-slab soil vapor probes have been installed and sampled repeatedly since 2015 at 201 South Glendale Avenue, 205 South Glendale Avenue, 211 South Glendale Avenue. Data from a December 2024 sampling event showed the highest PCE concentrations located beneath and directly west of Site. PCE concentrations decrease radially with distance from the Site with the exception of elevated concentrations to the north that may be associated with an off-Site source yet to be identified. Project Activities: The project is intended to address elevated VOCs in soil vapor and to prevent accumulation of residual soil vapor at the Site and adjacent properties thereby reducing the potential for vapor intrusion. An SVE system will be implemented to remove soil vapor at the Site and the vapor stream will be treated to prevent VOC emissions to the atmosphere. The SVE system will consist of: Vapor extraction wells and associated piping connecting the wells to the vapor treatment system; A water knockout tank with transfer pump; A soil vapor extraction and carbon adsorption unit to extract and treat soil gas from the vapor extraction wells; Required valves, gauges, hoses, and sample ports for the SVE systems; On-Site power to the system; and Meters and gauges as required to obtain system operation data. Three new extraction wells (screened from 5 to 30 feet below ground surface (bgs)) will be located at the following locations in the upper 30 feet of the subsurface: EX-2 – immediately to the north of the Site on the south side of East Harvard Street (approximately 20 feet north of the Site) EX-3 – immediately to the south of the Site in the northeast corner of the 211 South Glendale Avenue (approximately 30 feet south of the Site) EX-4 –on the northern boundary of the 217 South Glendale Avenue (approximately 80 feet south of the Site) Six new deep extraction wells (screened from 65 to 85 feet bgs) will be located at the following locations: EX-5 – on the southern corner of the East Harvard Street before the intersection of South Glendale Avenue (approximately 75 feet northeast of the Site) EX-6 – on the western side of South Glendale Avenue (approximately 90 feet south of the Site) EX-7 – in the parking lot immediately east (approximately 5 feet east of the Site) EX-8 – in the parking lot (approximately 170 feet west of the Site) EX-9 – on the western side of South Isabel Street (approximately 150 feet north of the Site) EX-10 – on the in the parking lot (approximately 200 feet southwest of the Site) All extraction wells will be constructed of 2-inch diameter casing and screen. Piping trenches will be installed to connect each vapor extraction well to a manifold in the SVE system enclosure. Each extraction well will have a dedicated pipe connecting the well to the manifold. At the manifold, the dedicated pipe from each well will be fitted with a valve and sampling port so that each well can be individually controlled and sampled. A single 4-inch diameter pipe will convey vapor exiting the manifold into the knockout pot and activated carbon tanks. The vapor treatment system will consist of three, 2,000-pound carbon adsorption canisters plumbed in series. Ports will be installed to sample vapors at the inlet to the first canister, between each canister, and the exhaust stack to the atmosphere. Once installed, the system will operate continuously for 2 years except for as needed for maintenance and brief shutdowns to collect soil vapor samples to evaluate remedial progress. Once SVE operations cease DTSC will evaluate the risk to human health and the SVE’s effectiveness in removing and treating VOCs in the subsurface. This evaluation along with any additional sampling will be used in preparation for the development of a final remedy to address releases in all media. A Permit to Operate the SVE system will be obtained from the South Coast Air Quality Management District (SCAQMD). Requisite permits/releases from the City of Glendale Building, Planning, and Fire Departments will also be obtained as necessary. The Site is in a previously developed area and does not provide habitat value. The project is consistent with applicable state and local environmental permitting requirements including, but not limited to, air quality rules such as those governing VOC emissions and approved by the regulatory body with jurisdiction over the Site (e.g., SCAQMD, City of Glendale). In addition, a Permit to Operate will be obtained from SCAQMD for the SVE system. For these reasons, the project would not have the potential to negatively impact any nearby receptors, which include industrial and commercial land uses. Although not anticipated, in the event biological, cultural or historical resources are discovered in the course of project activities, work will be suspended while a qualified biologist, cultural or historical specialist makes an assessment of the area and arrangements are made to protect or preserve any resources that are discovered. If human remains are discovered, no further disturbance will occur in the location where the remains are found, and the County Coroner will be notified pursuant to the Health and Safety Code, Chapter 2, Section 7050.5.

Similar Contracts

Same NAICS industry code

NAICS: 562910
New
Theatre Mold Remediation Scope of Work
Solicitation # AT25-0006
Solicitation AT25-0006 is a subcontracting opportunity with Adams and Associates, Inc. for comprehensive mold remediation at Theatre Building 1086 of the Atterbury Job Corps Center in Edinburgh, Indiana. The project was initiated following a sprinkler system failure and requires the remediation of mold throughout the building, including the cleaning or replacement of damaged theater seating cushions. All work must be performed in accordance with ANSI/IICRC S520 standards, EPA and OSHA regulations, and the Micro Air Inc. Mold Testing report dated April 11, 2024. Key technical requirements include the provision of a Certified Industrial Hygienist to verify materials and conduct final clearance, the implementation of HEPA filtration and negative air pressure, and dehumidification to maintain humidity levels at or below 50 percent. This is a single lump sum contract set aside for small businesses, including VOSB, SDVOSB, WOSB, and HUBZone certifications. Award will be based on best value, with evaluation weights distributed across price (60 points), quality (20 points), past performance (10 points), and schedule (10 points). Bidders must have attended a mandatory site visit on October 27, 2026, and must provide a valid Indiana Contractor's License, proof of specific automobile and workers compensation insurance, and certification of compliance with Davis Bacon Act wage rates. The selected contractor must start work within 14 days of the Notice to Proceed and adhere to Net 30 payment terms.
Atterbury Job Corps Center

POSTED

about 8 hours ago

DEADLINE

in about 17 hours
View Details
NAICS: 562910
New
SLED
C5613679-D - ASBESTOS ABATEMENT, LEAD-BASED PAINT, LEAD-CONTAINING PAINT, LEAD-CONTAINING MATERIALS AND MOLD REMOVAL SERVICES
Solicitation # C5613679-D
This Master Agreement establishes a contract for the California Department of Corrections and Rehabilitation (CDCR) to obtain as-needed services for the cleaning, removal, transport, and disposal of hazardous materials, including asbestos-containing construction materials, lead-based paint, lead-containing materials, and mold-contaminated materials. The scope of work covers various CDCR institutions and facilities, such as High Desert State Prison, Ironwood State Prison, and Kern Valley State Prison. The contractor is responsible for all associated costs, including labor, equipment, personal protective equipment, and disposal fees, with compensation based on the Public Works Rate Sheet. Key performance requirements include a four-hour response time for emergency abatement and a strict submittal process that must be completed five business days before site work begins. The contract is awarded to the lowest responsive bidder, with preferences granted to California-based companies and certified Small, Micro, or Disabled Veteran Business Enterprises. Compliance with Federal, State, and local laws is mandatory, specifically Title 17 of the California Code of Regulations for lead abatement and Senate Bill 854 for prevailing wage requirements. Contractors must provide proof of pollution liability insurance and a payment bond upon award. Work is generally performed Monday through Friday from 6:30 AM to 3:00 PM, and the CCM Site Supervisor serves as the sole authority for determining the acceptance and satisfactory completion of all work.
California Department of Corrections & Rehabilitation

POSTED

1 day ago

DEADLINE

in 27 days
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Prepare for this forecast

Research this forecast and prepare for the solicitation

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS