Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, August 19 at 2:00 PM EDT

Register Free →

Cedarwoods Fullerton Project

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

General Info

Agency

California → City of Fullerton

NAICS

562910 - Remediation ServicesView NAICS

Place of Performance

2461-2495 East Orangethorpe Avenue, Fullerton, CA, 92838

Set-Aside

NONE

Documents

(17)

Appendix G - Preliminary Water Quality Management Plan for Cedarwoods Fullerton Project

PDFpreliminary-water-quality-management-plan

Appendix A - Air Quality and Greenhouse Gas Modeling Data for Cedarwoods Fullerton Project

PDFsow

Appendix E - Paleontological Resources Records Search

PDFother

Appendix B - Cultural Resources Memorandum for Orangethorpe Avenue Warehouse Project

PDFcultural-resources-memorandum

Appendix J - Water Demand Assessment for Cedarwoods Fullerton Project

PDFwater-demand-assessment

Appendix K - Sewer Capacity Assessment for Cedarwoods Fullerton Project

PDFtechnical-report

Appendix D - Geotechnical Engineering Investigation for Industrial Warehouse Development

PDFgeotechnical-report

Cedarwoods Fullerton Notice of Intent to Adopt Mitigated Negative Declaration

PDFspecial-notice

Appendix C - Energy Calculations

PDFother

Cedarwoods Fullerton Initial Study/Mitigated Negative Declaration November 2025

PDFismnd

Cedarwoods Fullerton Project Notice of Completion

PDFnotice-of-completion

Caltrans Comment Letter on Cedarwoods Fullerton Project MND

PDFcomment-letter

Appendix H - Hydrology and Hydraulics Report for Cedarwoods Fullerton Project

PDFreport

SCH Summary Form for Cedarwoods Fullerton Project

PDFenvironmental-summary

Appendix F - Phase I Environmental Site Assessment Report for Cedarwoods Business Center

PDFenvironmental-site-assessment

Appendix L - Transportation Assessment Policies and Procedures Worksheet and Trip Generation Table

PDFother

Appendix I - Noise and Vibration Data for Cedarwoods Fullerton Warehouse

PDFsow

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → City of Fullerton
Contacts3 people available
OfficeN/A
Organization / Agency
California → City of Fullerton
Office AddressN/A
Contacts
David LopezSenior Planner
Addie SedoffProject Manager
Annie Tavetian GallagherProject Manager

Interested Companies (1)

Show more
Kimley-Horn and Associates
Kansas City, MO

Full Description

Show more
The Project is located on one approximately 4.79-acre (rounded to 4.8 acres) currently developed parcel (Assessor’s Parcel Number [APN] 338-172-24) located at 2461-2495 East Orangethorpe Avenue. The Applicant is proposing the demolition of the existing approximately 85,700-square-foot Cedarwoods Business Park and the construction and operation of a new 110,232-square-foot warehouse facility with a 91 stall surface parking lot, gated truck court with 15 dock doors, and associated improvements. The Project would require a zoning amendment for the southern portion of the parcel from Commercial Manufacturing, Emergency Shelter Overlay (C-M-ES) to Manufacturing Park with a 100,000 square-foot minimum lot size and an Emergency Shelter Overlay (M-P-100ES) to be consistent with the northerly half of the parcel.

Similar Contracts

Same NAICS industry code

NAICS: 562910
New
902/903 Dorm Mold Remediation & Removal
Solicitation # 902/903 Dorm Mold Remediation and Removal
This contract is for mold remediation and removal services at the Earle C. Clements Job Corps Center in Morganfield, Kentucky, targeting life safety and environmental deficiencies in two dormitory buildings—0902 and 0903—where visible mold growth and moisture intrusion have been identified. The scope includes removing contaminated materials such as drywall, insulation, ceiling finishes, and other affected surfaces, followed by thorough cleaning, sanitization, dehumidification, and restoration to match original conditions. Work must comply with EPA guidelines and IICRC S520 standards, utilizing negative air pressure, HEPA filtration, and proper containment procedures. All hazardous materials must be handled and disposed of according to federal, state, and local regulations, with Safety Data Sheets submitted for any chemicals used. Daily debris removal and secure storage of materials are required, and post-remediation verification including air quality testing must be provided. The total remediation area covers approximately 1,760 square feet in each building, with all work to be completed within 60 consecutive business days after receipt of a Notice to Proceed, beginning no later than five business days after the agreed-upon start date established during a mandatory pre-construction meeting. The contract is a fixed-price, single lump sum award with an estimated value between $25,000 and $100,000. Bidders must submit a detailed cost breakout on company letterhead, itemizing labor, materials, equipment, permits, disposal, testing, bonds, subcontractor costs, overhead, and profit, along with three comparable project references. A bid bond equal to 20% of the base bid is required if the bid equals or exceeds $25,000, and performance and payment bonds at 100% of the contract value are mandatory under the same threshold. Contractors must hold valid insurance, including worker’s compensation with $500,000 employer liability, general liability of $1 million per occurrence and $3 million aggregate, and other applicable coverages. Wage rates must comply with the Construction Wage Rate Requirements and Executive Order 13658, and certified payroll must be submitted weekly using AIA G702 and G703 forms. Retainage of 10% will be held until substantial completion and final acceptance. Additionally, bidders must complete a physical site visit with signed attendance, provide a completed MTC Supplier Packet including Form W-9 and self-certification, and
Earle C. Clements Job Corps Center

POSTED

about 9 hours ago

DEADLINE

in 1 day
View Details
NAICS: 562910
New
Mold Remediation
Solicitation # mold-remediation
The contract seeks a licensed mold remediation contractor to perform remediation services at the Solo Parent Dormitory within the Flint Hills Job Corps Center located in Manhattan, Kansas. Work is required in specific areas including rooms 208, 209, 210, 302, 310, and the 300 hallway linen closet, with a strict performance period of 10 business days. The contractor must adhere to the IICRC S520 Mold Remediation Standard, EPA guidelines, OSHA regulations, and Job Corps safety and facility standards. All work must include mold assessment, site preparation, containment using critical barriers and HEPA negative air machines, removal and disposal of contaminated porous materials like drywall, insulation, and carpeting, surface sanitization with EPA-registered antimicrobial or fungicide treatments, and a comprehensive post-remediation verification process that includes visual inspections, air and surface sampling, and a written report with lab results and photographs. Waste must be properly bagged, sealed, and disposed of in accordance with all regulatory requirements. The contractor must also provide an initial assessment report, daily work logs, and a minimum one-year warranty on the remediation work. The solicitation is restricted to small business set-asides including Small Business, Small Disadvantaged Business, Women-Owned Small Business, HUBZone, Veteran-Owned Small Business, and Service-Disabled Veteran-Owned Small Business. Proposals must include a vendor’s W-9 and DUNS number and a detailed pricing schedule broken down into labor hours, total labor cost, materials, other expenses, and the total price. The contract is subject to Davis-Bacon prevailing wage requirements, and successful offerors must submit an SF-1413 form and, if the award exceeds $30,000, the Serrato 542 form. Proof of applicable licenses and a Certificate of Liability Insurance naming the Job Corps Center as both certificate holder and additional insured are mandatory. Proposals are evaluated solely on price and price-related factors under a pass/fail compliance gate—any failure to meet material requirements in the solicitation will result in disqualification. The award will go to the most advantageous proposal based entirely on price and related criteria. All submissions must be received by 4:00 PM CST on August 13, 2026.
Serrato Corporation DBA Flint Hills Job Corps

POSTED

about 9 hours ago

DEADLINE

in 5 days
View Details
NAICS: 562910
New
Federal
Hazardous Material Abatement and DisposalThe contract titled Hazardous Material Abatement and Disposal outlines the critical tasks of identifying, containing, and safely disposing of hazardous substances including asbestos, lead-based paint, and PCBs during demolition activities at a site in Lemont, Illinois, with a ZIP code of 60439. This subcontract, posted on August 7, 2026, requires respondents to meet strict safety and regulatory standards for handling materials that pose significant health and environmental risks, ensuring compliance with federal and state protocols throughout the abatement process. The response deadline is set for August 27, 2026, emphasizing the urgency and precision needed in planning and execution. The work is being procured under NAICS code 562910, which classifies it under Other Remediation Services, and it is being managed by Argonne National Laboratory, a Department of Energy contractor, indicating the federal involvement and high-level oversight of the project. Performance is expected to occur entirely within Lemont, with no indication of remote or multiple-site work. While the solicitation number and point of contact details are not provided, the contract underscores the necessity for qualified contractors with demonstrated experience in hazardous material abatement, specialized equipment, certified personnel, and approved disposal facilities, with all operations strictly adhering to environmental protection and worker safety guidelines.
Argonne National Labor - DOE Contractor

POSTED

1 day ago

DEADLINE

in 19 days
View Details
NAICS: 562910
New
Federal
Hazardous Material Handling and Debris DisposalThe contract titled Hazardous Material Handling and Debris Disposal requires the identification, proper packaging, labeling, and secure disposal of hazardous materials including refrigerants and oils produced during chiller repair operations, with strict adherence to FED-STD-313 and OSHA regulatory standards. The work is scoped to ensure environmental and safety compliance throughout all phases of material handling, from on-site detection to final disposition, and must be executed in accordance with federal guidelines for hazardous waste management. The contract is categorized as a subcontract under a Small Business Set Aside, specifically designated for total small business participation, and the associated NAICS code 562910 confirms the focus on remediation and other waste management services. Performance of this contract is required at a location in Hilliard with a postal code of 32046, and the awarding agency is the Department of Transportation under the 697DCK Regional Acquisitions Svcs. The solicitation was posted on August 7, 2026, with a firm response deadline of August 31, 2026, at 9:00 PM Eastern Time. All contractors must demonstrate capability to meet federal and occupational safety standards while maintaining chain-of-custody documentation and ensuring no unauthorized release or contamination occurs. The terms reflect a high level of accountability, with compliance as a non-negotiable requirement, and no alternative disposal methods permitted outside of established regulatory frameworks.
697DCK Regional Acquisitions Svcs

POSTED

1 day ago

DEADLINE

in 23 days
View Details