Final Removal Action Workplan for 3512 & 3518 Clayton Road (aka Clayton Road Townhomes Project)

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The Ashbury Apartments Interim Removal Action Workplan involves site remediation activities on a 1.81-acre property located at the northwest corner of Ashbury Drive and Amador Avenue in Concord, California. Managed by the City of Concord with oversight from the Department of Toxic Substances Control (DTSC), the project aims to address soil contamination caused by lead and organochlorinated pesticides (OCPs) that exceed residential screening and California hazardous waste levels. The scope of work includes the excavation of approximately 1,000 cubic yards of impacted soil, estimated at 1,500 tons, across four specific areas on the site. Excavation depths are expected to range from two to four feet below the ground surface, and the process will continue until confirmation sampling verifies that cleanup criteria have been met. Following successful remediation, the areas will be backfilled with clean import fill as necessary. The project is scheduled to commence in Fall 2025 and is anticipated to last for a duration of up to six weeks. Under the California Environmental Quality Act (CEQA), the DTSC has issued a Statement of Findings and a Notice of Determination, concluding that the remediation activities will not have significant environmental effects. The workplan requires strict adherence to environmental and noise regulations, dust control measures, and specific procedures for handling any cultural or historical resource discoveries. Key points of contact for the project include Project Manager Karri Peters and Senior Planner Ryan Lenhardt. While the specific contract value is not disclosed, the project is classified under NAICS code 562910 for remediation services.

General Info

Concord will excavate lead and pesticide contaminated soil at Ashbury Apartments starting Fall 2025.

Agency

California → City of Concord

NAICS

562910 - Remediation ServicesView NAICS

Place of Performance

Ashbury Drive and Amador Avenue, Concord, CA, 94520

Set-Aside

NONE

Documents

(2)

DTSC Ashbury Apartments Interim Removal Action Workplan Statement of Findings

PDFstatement-of-findings

DTSC Ashbury Apartments Interim Removal Action Workplan NOD

PDFnotice-of-determination

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → City of Concord
Contacts3 people available
OfficeN/A
Organization / Agency
California → City of Concord
Office AddressN/A
Contacts
Karri PetersProject Manager
Ryan LenhardtSenior Planner

Full Description

Show more
he Ashbury Apartments Interim Removal Action Workplan (“Interim RAW”) sets forth site remediation activities on approximately 1.81 acres located at the northwest corner of Ashbury Drive and Amador Avenue in Concord, CA (Site). The Interim RAW addresses the presence of lead and organochlorinated pesticides (OCPs) in soils at concentrations above residential screening levels or California Hazardous waste levels. Remediation activities to be implemented as part of the Interim RAW include excavation of impacted soil followed by confirmation soil sampling. The estimated amount of impacted soil to be excavated is approximately 1,000 cubic yards (approximately 1,500 tons, assuming that a cubic yard of soil weighs approximately 1.5 tons). The excavations to remove impacted soils would occur at four areas on the Site with proposed excavation depths ranging from two to four feet below ground surface (bgs). Excavation would continue until confirmation sampling shows that the cleanup criteria have been met. Upon completion of soil remediation work and confirmation sampling, the excavation will be backfilled with clean import fill, if and as may be determined necessary. Remediation activities are anticipated to begin in Fall 2025 and take place for a duration of up to six weeks.

Similar Contracts

Same NAICS industry code

NAICS: 562910
New
Federal
Asbestos Abatement Services
Solicitation # 2031ZA26N00066
The Bureau of Engraving and Printing is conducting market research via a Sources Sought notice to identify qualified small business contractors for asbestos-containing material removal services at the Eastern Currency Facility in Washington, D.C. The government intends to establish a three-year Firm-Fixed-Price Blanket Purchase Agreement starting November 22, 2026, with individual task orders issued based on an established pricing schedule. The scope of work involves abatement services within the Main and Annex Buildings, requiring strict adherence to federal and local regulations, including NESHAPS, OSHA, and District of Columbia Municipal Regulations. Contractors must implement rigorous quality control and packaging standards, such as double-bagging waste in 6-mil polyethylene bags and maintaining materials in a wet state. Key deliverables include providing abatement plans and cost estimates within five days of inspection and uploading clearance results to the DOEE Asbestos e-Permitting System within 24 hours of completion. Due to the secure nature of the facility, personnel must obtain access to the Controlled Industrial Area, maintain strict confidentiality, and adhere to stringent security protocols, including the prohibition of weapons on site. Interested respondents must submit a capability statement and specific socioeconomic information by September 25, 2026, to assist the government in determining the final acquisition strategy.
Office Of The Chief Procurement Officer

POSTED

about 16 hours ago

DEADLINE

in 4 days
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS