Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

3139 Sea Cliff Soil Remediation

Forecast
PLN2024- 00State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The 3139 Sea Cliff Soil Remediation project, managed by the City of Santa Barbara Planning Division under solicitation PLN2024-00, involves environmental cleanup on a 3.02-acre lot containing a single-unit residence. The primary scope of work includes the excavation and exportation of contaminated soil to a permitted landfill in compliance with Title 22 requirements and local air district standards. Excavated areas will be backfilled using a combination of on-site uncontaminated soil and fill. The project requires the establishment of a construction staging area and a stabilized entrance at the southeast corner of the site. To facilitate remediation, the project involves the clearing and grubbing of approximately 17 front setback and 38 interior trees. In accordance with an arborist's report from February 13, 2025, these removed trees will be replaced with approximately 55 new trees, while any retained trees must be managed with specific protection measures. The project must strictly adhere to the Remedial Action Plan approved by Santa Barbara County Environmental Health Services on April 30, 2019, and comply with the Permit to Operate issued by the Santa Barbara County Air Pollution Control District on December 13, 2024. Environmental safeguards include the implementation of erosion and sediment control measures during all excavation and grading activities, followed by hydroseeding disturbed areas with a native erosion control mix. This project is exempt from further environmental review under CEQA Section 15330, as it is classified as a minor action related to hazardous waste remediation with no anticipated significant environmental impacts. The place of performance is located in Santa Barbara, California, 93109.

General Info

City of Santa Barbara soil remediation project involving contaminated soil excavation and tree replacement.

Place of Performance

Sea Cliff and Braemar Drive, Santa Barbara, CA, 93109

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseForecast
Posted

forecast

Prepare for this forecast

Research the agency, track this forecast, and prepare your capture plan before the solicitation opens.

Organization & Contact Information

Show more
AgencyCalifornia → City of Santa Barbara
Contacts2 people available
OfficeN/A
Office AddressN/A
Contacts
Julia PujoEnvironmental Analyst
Linda BlackbernPrincipal Planner

Full Description

Show more
The 3.02-acre lot is developed with an 1,845-square-foot single-unit residence and 480-square-foot attached garage on the southwest corner of the lot. The project proposes soil remediation by removal of contaminated soil. The project would result in excavation and exportation of contaminated soil to an appropriate permitted landfill. Excavations would be backfilled with uncontaminated soil from the site and with fill, balanced on site. The project includes a construction staging area and stabilized construction entrance at the southeast corner of the project site. Vegetation clearing and grubbing to accommodate the soil remediation includes the removal of approximately seventeen (17) front setback and approximately thirty-eight (38) interior trees. Retained trees would be protected with tree protection measures and removed trees would be replaced per the arborist’s recommendations in the report dated February, 13 2025 with approximately fifty-five (55) new trees. Erosion and sediment control measures would be implemented during excavation and grading activities. All areas disturbed would be hydroseeded with a native erosion control mix following completion of grading activities. No changes to the existing residence are proposed. The project would implement the Remedial Action Plan (RAP) approved by Santa Barbara County Environmental Health Services (EHS) dated April 30, 2019. The remediation would be completed under permit by the Santa Barbara County Air Pollution Control District (APCD) and the conditions of the Permit to Operate (PTO) issued by APCD on December 13, 2024.

Similar Contracts

Same NAICS industry code

NAICS: 562910
New
Theatre Mold Remediation Scope of Work
Solicitation # AT25-0006
Solicitation AT25-0006 is a subcontracting opportunity with Adams and Associates, Inc. for comprehensive mold remediation at Theater Building 1086 of the Atterbury Job Corps Center in Edinburgh, Indiana. The project was necessitated by a sprinkler system failure and requires the remediation of mold throughout the entire building, including the cleaning or replacement of damaged theater seating cushions. All work must be performed in accordance with ANSI/IICRC S520 Standards for Professional Mold Remediation, EPA guidelines, and OSHA regulations, with Indiana state laws prevailing if they are more stringent. Key requirements include the provision of a Certified Industrial Hygienist for daily site visits, a detailed remediation plan featuring HEPA filtration and negative air pressure, and a final clearance walkthrough. The contract is awarded on a best-value basis, evaluating price (60 points), quality (20 points), past performance (10 points), and schedule (10 points). Bidders must submit a single lump sum proposal on company letterhead, including a detailed cost breakdown, a timeline for substantial completion, and a 90-day bid guarantee. Mandatory requirements for submission include attendance at the pre-bid site visit, proof of a valid Indiana Contractor's License, and certification of compliance with Davis-Bacon Act wage rate decisions. Additionally, contractors must provide proof of automobile liability and workers compensation insurance, naming Adams and Associates, Inc. as an additional insured. Payment terms are Net 30, and work must commence within 14 days of the Notice to Proceed.
Atterbury Job Corps Center

POSTED

about 4 hours ago

DEADLINE

in 2 days
View Details
NAICS: 562910
New
SLED
C5613679-D - ASBESTOS ABATEMENT, LEAD-BASED PAINT, LEAD-CONTAINING PAINT, LEAD-CONTAINING MATERIALS AND MOLD REMOVAL SERVICES
Solicitation # C5613679-D
This Master Agreement establishes a contract for the California Department of Corrections and Rehabilitation (CDCR) to obtain as-needed services for the cleaning, removal, transport, and disposal of hazardous materials, including asbestos-containing construction materials, lead-based paint, lead-containing materials, and mold-contaminated materials. The scope of work covers various CDCR institutions and facilities, such as High Desert State Prison, Ironwood State Prison, and Kern Valley State Prison. The contractor is responsible for all associated costs, including labor, equipment, personal protective equipment, and disposal fees, with compensation based on the Public Works Rate Sheet. Key performance requirements include a four-hour response time for emergency abatement and a strict submittal process that must be completed five business days before site work begins. The contract is awarded to the lowest responsive bidder, with preferences granted to California-based companies and certified Small, Micro, or Disabled Veteran Business Enterprises. Compliance with Federal, State, and local laws is mandatory, specifically Title 17 of the California Code of Regulations for lead abatement and Senate Bill 854 for prevailing wage requirements. Contractors must provide proof of pollution liability insurance and a payment bond upon award. Work is generally performed Monday through Friday from 6:30 AM to 3:00 PM, and the CCM Site Supervisor serves as the sole authority for determining the acceptance and satisfactory completion of all work.
California Department of Corrections & Rehabilitation

POSTED

about 5 hours ago

DEADLINE

in 28 days
View Details
NAICS: 562910
New
SLED
Range Backstop Rebuild
Solicitation # 26-493ISP-OPERA-B-54769
The Illinois State Police is soliciting a contractor for the Range Backstop Rebuild under solicitation 26-493ISP-OPERA-B-54769. The project requires the contractor to rebuild a bullet trap backstop within a strict 10-day range closure window. The scope of work includes furnishing and installing approximately 34,000 pounds of new granular rubber media, leveling and grading the trap according to manufacturer specifications for ballistic performance, and removing displaced rubber and debris using methods that prevent the spread of lead-contaminated dust. The vendor must act as the hazardous waste generator, managing all manifests, labeling, and documentation for lead-contaminated materials. Due to the nature of the work, the contractor must adhere to stringent safety and environmental regulations, including OSHA Lead and Respiratory Protection Standards and EPA RCRA hazardous waste requirements. All lead-contaminated waste and PPE must be packaged in UN-DOT approved containers. To be eligible for award, the vendor must provide a detailed work plan and schedule, a site-specific safety plan covering RCRA waste management, and manufacturer specifications for the rubber media. Additionally, the vendor must maintain comprehensive insurance, specifically including 10 million dollars in Lead Pollution Liability insurance. Payments are processed upon contract completion or based on agreed-upon milestones in accordance with the State Prompt Payment Act.
OPERATIONS493 - Operations

POSTED

about 5 hours ago

DEADLINE

in 10 days
View Details
NAICS: 562910
New
SLED
Mold Remediation at the Town Hall
Solicitation # BD-24-1688-TOW94-TOW-135194
The Town of Wendell is seeking professional contracting services for mold remediation in the men's and women's bathrooms and the repair of water damage in the basement utility room at the Town Hall located at 6 Center St., Wendell, MA. The contractor is responsible for providing all necessary labor, equipment, and technical expertise, including the installation of temporary containment barriers in bathrooms and the use of fans, dehumidifiers, or ozone machines to dry the basement. To maintain operational continuity, the contractor must ensure that at least one bathroom remains available at all times. Specific technical requirements include the use of HEPA rated filters for vacuuming, the installation of 1/2 inch MR gypsum board with three coats of joint compound, and a painting process consisting of one coat of seal/prime and two coats of glossy paint. Additionally, the vinyl sheet product must be Tarkett Performa Stonework Dover 55031. This public works project is subject to prevailing wage rules, and a certificate of insurance is required upon bid acceptance. The scope of work specifically excludes duct cleaning and furnace servicing. Contractors must report any hidden issues discovered during subfloor and wall cavity inspections to the project manager, and the use of ozone machines must be supervised by the facilities engineer. The solicitation, numbered BD-24-1688-TOW94-TOW-135194, has a bid opening date of November 18, 2026, with a project walk-through scheduled for November 12, 2026. Electronic quotes are permitted through the procurement system.
Town of Wendell

POSTED

about 10 hours ago

DEADLINE

in 12 days
View Details

More opportunities from California → City of Santa Barbara

Same awarding agency

NAICS: 237990
SLED
Santa Barbara Airport Master PlanThe Santa Barbara Airport Master Plan is a comprehensive 15 to 20 year guidance framework managed by the City of Santa Barbara to oversee the development, maintenance, and operation of the Santa Barbara Municipal Airport. The project focuses on accommodating existing and forecast passenger demands through a series of phased improvements targeting short-term, intermediate-term (2022), and long-term (2032) activity levels. Key airfield enhancements include the extension of Taxiway H, the restriping of paved areas, and the relocation of taxiway entrances and exits. Landside improvements involve consolidating general aviation operations into two Fixed Base Operator lease areas and relocating the Airport Maintenance Yard. A primary focus of the current project is the Terminal Improvement Project, which includes expanding the John T. Rickard Airline Terminal by 16,500 square feet and redeveloping approximately 20,400 square yards of the terminal and overflow apron. Other terminal area upgrades include the construction of a new long-term parking lot with 1,315 spaces and the demolition of Building 122 to facilitate parking expansion. The project adheres to Federal Aviation Administration standards and California Environmental Quality Act requirements, with a design life intended to mitigate sea level rise hazards over 75 years. The project was formally approved on June 30, 2026, following a CEQA addendum to the original 2017 Master Plan.
Other Heavy and Civil Engineering Construction

POSTED

4 months ago

DEADLINE

N/A
View Details
NAICS: 237990
SLED
Vic Trace Reservoir Replacement Project
Solicitation # PRE2025-0035
The Vic Trace Reservoir Replacement Project, identified by solicitation number PRE2025-0035 and project number 41510, is a public works initiative by the City of Santa Barbara to modernize aging water infrastructure. The primary objective is to enhance the reliability, resiliency, and operational flexibility of the city water system while complying with federal security regulations. The scope of work includes the demolition of an existing 10-million-gallon reservoir and the construction of two new 5-million-gallon circular, prestressed concrete reservoirs that will be fully buried. Onsite improvements feature a new valve building for pumps and disinfection systems, the re-abandonment of an existing oil well, and the installation of retaining walls and landscaping. Offsite work involves the replacement and relocation of underground water pipelines within the Alta Mesa neighborhood and the relocation of a pressure reducing valve station. The project is scheduled for construction over a three-year period, anticipated to begin in July 2028 and conclude by August 2031. Performance will occur at the Vic Trace Reservoir parcel at 740 Dolores Drive, with additional work in surrounding public rights-of-way and the use of a city-owned property at 1633 La Coronilla Drive for temporary offices. Environmental reviews have identified potential impacts on air quality, biological resources, and cultural assets, with noise impacts noted as significant and unavoidable. The project is managed by the City of Santa Barbara Public Works Department, with Kelly Bourque serving as the Supervising Engineer and primary point of contact.
Other Heavy and Civil Engineering Construction

POSTED

5 months ago

DEADLINE

N/A
View Details
NAICS: 562910
SLED
3139 Sea Cliff Soil Remediation
Solicitation # PLN2024-00398
The 3139 Sea Cliff Soil Remediation project, identified by solicitation number PLN2024-00398, involves the excavation and removal of contaminated soil from a 3.02-acre lot in Santa Barbara, California. The scope of work includes the exportation of contaminated soil to a permitted landfill in compliance with Title 22 and local air district requirements, followed by backfilling the site with uncontaminated soil and fill. The project requires strict adherence to the Remedial Action Plan approved by Santa Barbara County Environmental Health Services on October 10, 2025, and the Permit to Operate issued by the Santa Barbara County Air Pollution Control District on December 13, 2024. Site activities include the establishment of a construction staging area and stabilized entrance at the southeast corner of the property. Vegetation management involves the removal of approximately 17 front setback and 38 interior trees, with the planting of 55 new trees based on an arborist report dated February 13, 2025. To mitigate environmental impact, the project will implement erosion and sediment control measures and hydroseed all disturbed areas with a native mix. The project is subject to land use approval by the Staff Hearing Officer and design review approval by the Single Family Design Board, and it is exempt under CEQA Section 15330 as a minor action to mitigate hazardous waste release.
Remediation Services

POSTED

11 months ago

DEADLINE

N/A
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Prepare for this forecast

Research this forecast and prepare for the solicitation

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS