Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, September 30 at 2:00 PM EDT

Register Free →

Jewett Creek Remediation Project

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The Jewett Creek Remediation Project, identified by notification number EPIMS-TEH-58957-R1, is a California Department of Fish and Wildlife initiative located in Tehama County, California. The project aims to remediate damages to fish and wildlife resources caused by Fish and Game Code violations within Jewett Creek, a tributary of the Sacramento River. The scope of work includes hydrology restoration through the removal of a 1,400-linear foot earthen levee on the north branch to facilitate water overflow, the relocation of a 1,600-linear foot unauthorized earthen levee to a position fifteen feet further from the stream edge, and the removal of approximately 10 to 15 vehicle tires from the creek bed and bank. Technical specifications for the project require all excavation cuts and fill placements to be constructed at 2:1 slopes. Additionally, all clean fill material must be moisture conditioned and compacted to a 90% relative compaction standard. The project site is specifically located at Tehama County assessor's parcel number 061-320-002-000, with performance centered near Corning, California. Administrative oversight is provided by the California Department of Fish and Wildlife Northern Region, with Matthew Mitchell serving as the primary contact and Adam McKannay as the Environmental Program Manager. A CEQA Notice of Exemption for the project was issued on October 8, 2025, based on regulatory actions for environmental protection.

General Info

CDFW project in Tehama County remediating Jewett Creek via levee removal and cleanup.

Agency

California → Fish and Wildlife, Region 1 - Northern Region, Redding and Eureka

NAICS

562910 - Remediation ServicesView NAICS

Place of Performance

10th Avenue, Corning, CA

Set-Aside

NONE

Documents

(1)

EPIMS-TEH-58957-R1 Jewett Creek CEQA Notice of Exemption

PDFnotice-of-exemption

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → Fish and Wildlife, Region 1 - Northern Region, Redding and Eureka
Contacts1 person available
OfficeN/A
Organization / Agency
California → Fish and Wildlife, Region 1 - Northern Region, Redding and Eureka
Office AddressN/A
Contacts
Matthew MitchellSenior Environmental Scientist

Full Description

Show more
The project is intended to remediate damages incurred to fish and wildlife resources resulting from Fish and Game Code violations documented within Jewett Creek, a tributary to the Sacramento River. The Project includes the following activities: 1) North/South Branch Hydrology Restoration- An approximately 1,400-linear foot section of earthen levee on the south bank of the north branch of Jewett Creek beginning at and west of approximately 39.934811°, -122.264529° will be removed to allow water to overflow into the south branch during high flow events. The area will be graded smooth, stabilized with stormwater best management practices, and spoils hauled to a suitable upland location where they cannot return to the stream. 2) North Branch Bank Remediation- An approximately 1,600 linear foot section of unauthorized earthen levee will be relocated approximately fifteen feet further from the stream edge from its current location. All cuts will be excavated at 2:1 slopes, all fills placed at 2:1 slopes, and all clean fill material moisture conditioned and compacted to 90% relative compaction. 3) Upstream Tire Removal- At approximately 39.933477°, -122.269724° an estimated 10 to 15 vehicle tires that washed down from an upstream parcel will be removed from the bed and bank of the north branch of Jewett Creek. Minimal bank excavation is expected due to most tires being in loose soil within the channel bed.

Similar Contracts

Same NAICS industry code

NAICS: 562910
New
Federal
Asbestos Abatement Services
Solicitation # 2031ZA26N00066
The Bureau of Engraving and Printing is conducting market research via a Sources Sought notice to identify qualified small business contractors for asbestos-containing material removal services at the Eastern Currency Facility in Washington, D.C. The government intends to establish a three-year Firm-Fixed-Price Blanket Purchase Agreement starting November 22, 2026, with individual task orders issued based on an established pricing schedule. The scope of work involves abatement services within the Main and Annex Buildings, requiring strict adherence to federal and local regulations, including NESHAPS, OSHA, and District of Columbia Municipal Regulations. Contractors must implement rigorous quality control and packaging standards, such as double-bagging waste in 6-mil polyethylene bags and maintaining materials in a wet state. Key deliverables include providing abatement plans and cost estimates within five days of inspection and uploading clearance results to the DOEE Asbestos e-Permitting System within 24 hours of completion. Due to the secure nature of the facility, personnel must obtain access to the Controlled Industrial Area, maintain strict confidentiality, and adhere to stringent security protocols, including the prohibition of weapons on site. Interested respondents must submit a capability statement and specific socioeconomic information by September 25, 2026, to assist the government in determining the final acquisition strategy.
Office Of The Chief Procurement Officer

POSTED

about 15 hours ago

DEADLINE

in 4 days
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS