Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

Gateway Village Project

Forecast
VTTM 19352State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The Gateway Village Project is a residential development located at the northeast corner of Portola Parkway and Jeffrey Road in Irvine, California. The project involves the construction of 1,360 attached and detached homes on approximately 105 acres. In addition to housing, the development includes the creation of five parks totaling roughly 7.2 acres, the extension of the Jeffrey Open Space Trail, and the establishment of public access points and improvements within the Gateway Preserve Open Space. The project is being developed by Brookfield Residential, LLC in coordination with the City of Irvine. The project has undergone extensive environmental review to comply with the California Environmental Quality Act, including a full Environmental Impact Report and a Notice of Determination certifying that the project will not have a significant environmental effect provided mitigation measures are adopted. Technical assessments have been completed for hydrology, air quality, greenhouse gas emissions, biological resources, and cultural and paleontological assets. Infrastructure planning includes a Sub-Area Master Plan for potable, sanitary sewer, and non-potable water systems, with water supply verification provided by the Irvine Ranch Water District. Construction is planned in multiple phases from 2026 through 2032, covering grading, site preparation, and building construction. Safety and risk management measures include a fire behavior analysis, a conceptual fuel modification plan, and an evacuation travel time analysis to address wildfire hazards. Environmental site assessments have also identified the need for a Soil Management Plan to handle contaminants from historical agricultural use. The project is supported by various agencies, including Caltrans, and adheres to the City of Irvine's 2045 General Plan Safety Element.

General Info

Brookfield Residential will build 1,360 homes and five parks in Irvine by 2032.

Place of Performance

Northeast corner of Portola Pkwy & Jeffrey Rd, Irvine, Orange County, Orange, CA

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseForecast
Posted

forecast

Prepare for this forecast

Research the agency, track this forecast, and prepare your capture plan before the solicitation opens.

Organization & Contact Information

Show more
AgencyCalifornia → City of Irvine
Contacts2 people available
OfficeN/A
Organization / AgencyCalifornia → City of Irvine
Office AddressN/A
Contacts
ERICA S. HONGSENIOR PLANNER
Derek SpaldingDevelopment Director

Interested Companies (1)

DudekAuburn, CA

Full Description

Show more
The City of Irvine, in partnership with Brookfield, proposes the development of a new approximately 105-acre residential village consisting of two- and three-story attached and detached homes (Project). The Project would create essential public access points, trails and other improvements in the Gateway Preserve Open Space to be located north of the site. The Project also includes the extension of the Jeffrey Open Space Trail (JOST) and a new park located at the northern terminus of the JOST.

Similar Contracts

Same NAICS industry code

NAICS: 562910
New
Theatre Mold Remediation Scope of Work
Solicitation # AT25-0006
Solicitation AT25-0006 is a subcontracting opportunity with Adams and Associates, Inc. for comprehensive mold remediation at Theater Building 1086 of the Atterbury Job Corps Center in Edinburgh, Indiana. The project was necessitated by a sprinkler system failure and requires the remediation of mold throughout the entire building, including the cleaning or replacement of damaged theater seating cushions. All work must be performed in accordance with ANSI/IICRC S520 Standards for Professional Mold Remediation, EPA guidelines, and OSHA regulations, with Indiana state laws prevailing if they are more stringent. Key requirements include the provision of a Certified Industrial Hygienist for daily site visits, a detailed remediation plan featuring HEPA filtration and negative air pressure, and a final clearance walkthrough. The contract is awarded on a best-value basis, evaluating price (60 points), quality (20 points), past performance (10 points), and schedule (10 points). Bidders must submit a single lump sum proposal on company letterhead, including a detailed cost breakdown, a timeline for substantial completion, and a 90-day bid guarantee. Mandatory requirements for submission include attendance at the pre-bid site visit, proof of a valid Indiana Contractor's License, and certification of compliance with Davis-Bacon Act wage rate decisions. Additionally, contractors must provide proof of automobile liability and workers compensation insurance, naming Adams and Associates, Inc. as an additional insured. Payment terms are Net 30, and work must commence within 14 days of the Notice to Proceed.
Atterbury Job Corps Center

POSTED

about 4 hours ago

DEADLINE

in 2 days
View Details
NAICS: 562910
New
SLED
C5613679-D - ASBESTOS ABATEMENT, LEAD-BASED PAINT, LEAD-CONTAINING PAINT, LEAD-CONTAINING MATERIALS AND MOLD REMOVAL SERVICES
Solicitation # C5613679-D
This Master Agreement establishes a contract for the California Department of Corrections and Rehabilitation (CDCR) to obtain as-needed services for the cleaning, removal, transport, and disposal of hazardous materials, including asbestos-containing construction materials, lead-based paint, lead-containing materials, and mold-contaminated materials. The scope of work covers various CDCR institutions and facilities, such as High Desert State Prison, Ironwood State Prison, and Kern Valley State Prison. The contractor is responsible for all associated costs, including labor, equipment, personal protective equipment, and disposal fees, with compensation based on the Public Works Rate Sheet. Key performance requirements include a four-hour response time for emergency abatement and a strict submittal process that must be completed five business days before site work begins. The contract is awarded to the lowest responsive bidder, with preferences granted to California-based companies and certified Small, Micro, or Disabled Veteran Business Enterprises. Compliance with Federal, State, and local laws is mandatory, specifically Title 17 of the California Code of Regulations for lead abatement and Senate Bill 854 for prevailing wage requirements. Contractors must provide proof of pollution liability insurance and a payment bond upon award. Work is generally performed Monday through Friday from 6:30 AM to 3:00 PM, and the CCM Site Supervisor serves as the sole authority for determining the acceptance and satisfactory completion of all work.
California Department of Corrections & Rehabilitation

POSTED

about 4 hours ago

DEADLINE

in 28 days
View Details
NAICS: 562910
New
SLED
Range Backstop Rebuild
Solicitation # 26-493ISP-OPERA-B-54769
The Illinois State Police is soliciting a contractor for the Range Backstop Rebuild under solicitation 26-493ISP-OPERA-B-54769. The project requires the contractor to rebuild a bullet trap backstop within a strict 10-day range closure window. The scope of work includes furnishing and installing approximately 34,000 pounds of new granular rubber media, leveling and grading the trap according to manufacturer specifications for ballistic performance, and removing displaced rubber and debris using methods that prevent the spread of lead-contaminated dust. The vendor must act as the hazardous waste generator, managing all manifests, labeling, and documentation for lead-contaminated materials. Due to the nature of the work, the contractor must adhere to stringent safety and environmental regulations, including OSHA Lead and Respiratory Protection Standards and EPA RCRA hazardous waste requirements. All lead-contaminated waste and PPE must be packaged in UN-DOT approved containers. To be eligible for award, the vendor must provide a detailed work plan and schedule, a site-specific safety plan covering RCRA waste management, and manufacturer specifications for the rubber media. Additionally, the vendor must maintain comprehensive insurance, specifically including 10 million dollars in Lead Pollution Liability insurance. Payments are processed upon contract completion or based on agreed-upon milestones in accordance with the State Prompt Payment Act.
OPERATIONS493 - Operations

POSTED

about 5 hours ago

DEADLINE

in 10 days
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Prepare for this forecast

Research this forecast and prepare for the solicitation

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS