Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

Tadpole Creek Tributary Remediation Project (Notification of Lake or Streambed Alteration, No. EPIMS-SHA-50417-R1)

Forecast
EPIMS-SHA-50417-R1State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The Tadpole Creek Tributary Remediation Project, identified as Lake and Streambed Alteration Agreement EPIMS Notification No. EPIMS-SHA-50417-R1, is executed by the California Department of Fish and Wildlife Northern Region to Ryan Muse. The project is located in Shasta County, California, specifically on an unnamed tributary to Tadpole Creek. Its primary purpose is to remediate damages to fish and wildlife resources resulting from Fish and Game Code violations by restoring pre-violation hydrology and implementing erosion control measures to prevent sediment transport into the stream. The scope of work is divided into two main components. The Tributary Restoration involves removing an in-channel impoundment and an earthen dam, grading a 2-acre area to re-establish an ephemeral drainage, and replanting the area with native vegetation. The Pond Spillway Improvement includes installing a 30-foot long, 24-inch diameter culvert through the levee, constructing a rocked overflow and a three-foot wide spillway lined with non-woven geotextile and various sizes of rock. This second component will disturb 0.07 acres and require 80 cubic yards of rock. The project is managed by the Department of Fish and Wildlife under the authority of Section 1602 of the Fish and Game Code.

General Info

Ryan Muse will remediate Tadpole Creek tributary damages through restoration and spillway improvements.

Agency

California → Fish and Wildlife, Region 1 - Northern Region, Redding and Eureka

Place of Performance

Simmons Road, Redding, CA

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseForecast
Posted

forecast

Prepare for this forecast

Research the agency, track this forecast, and prepare your capture plan before the solicitation opens.

Organization & Contact Information

Show more
AgencyCalifornia → Fish and Wildlife, Region 1 - Northern Region, Redding and Eureka
Contacts1 person available
OfficeN/A
Organization / Agency
California → Fish and Wildlife, Region 1 - Northern Region, Redding and Eureka
Office AddressN/A
Contacts
Matthew MitchellSenior Environmental Scientist

Full Description

Show more
The project is intended to remediate damages incurred to fish and wildlife resources resulting from Fish and Game Code violations and restoration of pre-violation hydrology allowing unobstructed flow from the unnamed tributary to Tadpole Creek, restoration of the channel, and installation of appropriate erosion control measures to reduce or eliminate sediment transport to the stream. : The California Department of Fish and Wildlife has executed Lake and Streambed Alteration Agreement EPIMS Notification No. EPIMS-SHA-50417-R1 pursuant to Section 1602 of the Fish and Game Code to Ryan Muse. The project is intended to remediate damages incurred to fish and wildlife resources resulting from Fish and Game Code violations and restoration of pre-violation hydrology allowing unobstructed flow from the unnamed tributary to Tadpole Creek, restoration of the channel, and installation of appropriate erosion control measures to reduce or eliminate sediment transport to the stream. The project has two components: 1) Tributary Restoration- Removal of an in-channel impoundment will include grading of earthen material within a 2-acre area to re-establish an ephemeral drainage. The earthen dam at the downstream end of the impoundment will be removed. Material from the dam and the elevated levee will be used to create a slope within the impoundment allowing surface flow through the area without ponding. Some of the elevated levee material will be left in place and compacted to avoid potential erosion of sediment to adjacent Tadpole Creek. The restored area will be replanted with native vegetation. 2) Pond Spillway Improvement- Spillway improvements will require installation of a 30-foot long, 24-inch diameter culvert installed through the southern end of the levee/dam with a 5-foot wide, rocked overflow above the culvert. The overflow and spillway will be lined with non-woven geotextile. Two to four-inch rock will be installed within the overflow. The spillway will be three feet wide and lined with 12 to 24-inch diameter rock. Spillway improvements will result in a disturbed area of 0.07 acres and will require 80 cubic yards of rock.

Similar Contracts

Same NAICS industry code

NAICS: 562910
New
Theatre Mold Remediation Scope of Work
Solicitation # AT25-0006
Solicitation AT25-0006 is a subcontracting opportunity with Adams and Associates, Inc. for comprehensive mold remediation at Theater Building 1086 of the Atterbury Job Corps Center in Edinburgh, Indiana. The project was necessitated by a sprinkler system failure and requires the remediation of mold throughout the entire building, including the cleaning or replacement of damaged theater seating cushions. All work must be performed in accordance with ANSI/IICRC S520 Standards for Professional Mold Remediation, EPA guidelines, and OSHA regulations, with Indiana state laws prevailing if they are more stringent. Key requirements include the provision of a Certified Industrial Hygienist for daily site visits, a detailed remediation plan featuring HEPA filtration and negative air pressure, and a final clearance walkthrough. The contract is awarded on a best-value basis, evaluating price (60 points), quality (20 points), past performance (10 points), and schedule (10 points). Bidders must submit a single lump sum proposal on company letterhead, including a detailed cost breakdown, a timeline for substantial completion, and a 90-day bid guarantee. Mandatory requirements for submission include attendance at the pre-bid site visit, proof of a valid Indiana Contractor's License, and certification of compliance with Davis-Bacon Act wage rate decisions. Additionally, contractors must provide proof of automobile liability and workers compensation insurance, naming Adams and Associates, Inc. as an additional insured. Payment terms are Net 30, and work must commence within 14 days of the Notice to Proceed.
Atterbury Job Corps Center

POSTED

about 4 hours ago

DEADLINE

in 2 days
View Details
NAICS: 562910
New
SLED
C5613679-D - ASBESTOS ABATEMENT, LEAD-BASED PAINT, LEAD-CONTAINING PAINT, LEAD-CONTAINING MATERIALS AND MOLD REMOVAL SERVICES
Solicitation # C5613679-D
This Master Agreement establishes a contract for the California Department of Corrections and Rehabilitation (CDCR) to obtain as-needed services for the cleaning, removal, transport, and disposal of hazardous materials, including asbestos-containing construction materials, lead-based paint, lead-containing materials, and mold-contaminated materials. The scope of work covers various CDCR institutions and facilities, such as High Desert State Prison, Ironwood State Prison, and Kern Valley State Prison. The contractor is responsible for all associated costs, including labor, equipment, personal protective equipment, and disposal fees, with compensation based on the Public Works Rate Sheet. Key performance requirements include a four-hour response time for emergency abatement and a strict submittal process that must be completed five business days before site work begins. The contract is awarded to the lowest responsive bidder, with preferences granted to California-based companies and certified Small, Micro, or Disabled Veteran Business Enterprises. Compliance with Federal, State, and local laws is mandatory, specifically Title 17 of the California Code of Regulations for lead abatement and Senate Bill 854 for prevailing wage requirements. Contractors must provide proof of pollution liability insurance and a payment bond upon award. Work is generally performed Monday through Friday from 6:30 AM to 3:00 PM, and the CCM Site Supervisor serves as the sole authority for determining the acceptance and satisfactory completion of all work.
California Department of Corrections & Rehabilitation

POSTED

about 4 hours ago

DEADLINE

in 28 days
View Details
NAICS: 562910
New
SLED
Range Backstop Rebuild
Solicitation # 26-493ISP-OPERA-B-54769
The Illinois State Police is soliciting a contractor for the Range Backstop Rebuild under solicitation 26-493ISP-OPERA-B-54769. The project requires the contractor to rebuild a bullet trap backstop within a strict 10-day range closure window. The scope of work includes furnishing and installing approximately 34,000 pounds of new granular rubber media, leveling and grading the trap according to manufacturer specifications for ballistic performance, and removing displaced rubber and debris using methods that prevent the spread of lead-contaminated dust. The vendor must act as the hazardous waste generator, managing all manifests, labeling, and documentation for lead-contaminated materials. Due to the nature of the work, the contractor must adhere to stringent safety and environmental regulations, including OSHA Lead and Respiratory Protection Standards and EPA RCRA hazardous waste requirements. All lead-contaminated waste and PPE must be packaged in UN-DOT approved containers. To be eligible for award, the vendor must provide a detailed work plan and schedule, a site-specific safety plan covering RCRA waste management, and manufacturer specifications for the rubber media. Additionally, the vendor must maintain comprehensive insurance, specifically including 10 million dollars in Lead Pollution Liability insurance. Payments are processed upon contract completion or based on agreed-upon milestones in accordance with the State Prompt Payment Act.
OPERATIONS493 - Operations

POSTED

about 5 hours ago

DEADLINE

in 10 days
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Prepare for this forecast

Research this forecast and prepare for the solicitation

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS