Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, September 30 at 2:00 PM EDT

Register Free →

Capistrano Pointe Pressure Reducing Station Replacement and new fence enclosure

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The Capistrano Pointe Pressure Reducing Station Replacement and new fence enclosure project, solicitation number C-9640A, is an emergency infrastructure initiative managed by the Santa Margarita Water District. Located at 26585 Camino De Vista in San Juan Capistrano, California, the project involves the critical replacement of severely corroded pressure reducing station piping and valve equipment currently housed within a below-ground vault. Because this facility provides the sole domestic water service to The Palmer Residences, the work is classified as an emergency replacement. The scope includes the installation of new above-ground pressure reducing station equipment and the construction of a fenced and gated enclosure equipped with slats and a roof to ensure both security and visual screening of the new piping. The project site is situated within a Santa Margarita Water District easement on private property. Due to the nature of the work, the Santa Margarita Water District has filed a Notice of Exemption under the California Environmental Quality Act, claiming both an Emergency Project status and a Categorical Exemption for existing facilities. Key administrative contacts for the project include Chief Engineer Tricia Butler and Senior Project Engineer Jaime Aguilar. While the technical requirements for the replacement and enclosure are clearly defined to maintain essential water services, specific contract pricing, period of performance, and evaluation factors for award are not detailed in the available documentation.

General Info

Emergency replacement of pressure reducing station and fence for Santa Margarita Water District.

Agency

California → Santa Margarita Water District

NAICS

237110 - Water and Sewer Line and Related Structures ConstructionView NAICS

Place of Performance

Camino Las Rambles and Avenida California, San Juan Capistrano, CA, 92675

Set-Aside

NONE

Documents

(1)

Notice of Exemption for Capistrano Pointe PRS Replacement C-9640A

PDFnotice-of-exemption

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → Santa Margarita Water District
Contacts1 person available
OfficeN/A
Organization / Agency
California → Santa Margarita Water District
Office AddressN/A
Contacts
Tricia ButlerChief Engineer

Full Description

Show more
Emergency replacement of severely corroded pressure reducing station (PRS) piping and valve equipment within a below ground vault. The PRS facility is within a SMWD easement or private property. New above ground PRS equipment is being installed as the PRS facility provides the only domestic water service to The Palmer Residences (former Capistrano Pointe complex). Includes a fenced and gated above ground enclosure with slats and roof from visual screening of the new above ground piping and security.

Similar Contracts

Same NAICS industry code

NAICS: 237110
New
Federal
Z2NZ-- 658-23-108 Correct Stormwater Drainage
Solicitation # 36C24626B0031
Solicitation 36C24626B0031 is an Invitation for Bids (IFB) issued by the Department of Veterans Affairs Network Contracting Office 6 for Project 658-23-108, which involves correcting stormwater drainage at the Salem VA Medical Center in Salem, Virginia. The project is a 100% set-aside for Service-Disabled Veteran-Owned Small Businesses (SDVOSB), with an estimated construction magnitude between $10,000,000 and $20,000,000. The scope of work includes providing all labor, materials, and equipment for general construction and utility work, specifically the installation of a dewatering system to control ground surface water during excavation. The performance period is 450 calendar days from the issuance of the Notice to Proceed. The contract will be awarded based on FAR Part 14 Sealed Bidding procedures, typically to the lowest responsive and responsible bidder. Eligible SDVOSB bidders must be registered in the System for Award Management (SAM) and are required to perform at least 25% of the construction work. Key requirements include a bid guarantee of at least 20% of the bid price (capped at $3,000,000), adherence to Davis-Bacon wage determinations, and the ability to demonstrate the completion of three similar projects within the last three years. The final bid submission deadline was extended to October 20, 2026, with a public bid opening on October 21, 2026.
246-NETWORK Contracting Office 6 (36C246)

POSTED

about 1 hour ago

DEADLINE

in 28 days
View Details
NAICS: 237110
New
Inland Feeder/SBVMWD Foothill PS Intertie, Stage 1
Solicitation # inland-feedersbvmwd-foothill-ps-intertie-stage-1
The Inland Feeder/SBVMWD Foothill PS Intertie, Stage 1 project in Highland, California, involves extensive infrastructure installation for the Metropolitan Water District of Southern California. The scope of work includes furnishing and installing approximately 2,150 linear feet of 54-inch to 66-inch diameter steel pipe and 200 linear feet of 144-inch diameter steel pipe. The project also requires the installation of various large-diameter valves, including contractor-furnished valves and Metropolitan-furnished 54-inch and 132-inch valves, along with 54-inch and 145.5-inch diameter tie-ins and associated fittings. Additional construction requirements include the installation of four surge tanks, two valve vaults, an air compressor yard structure, and various drainage improvements. The project encompasses electrical upgrades, instrumentation and controls, piping systems, the excavation of cobbles and large boulders, welding, disinfection, and surface restoration. This solicitation, issued by James W. Fowler Co., is open to small businesses, including SDVOSB, MBE, and WBE certified firms, with a response deadline of September 29, 2026. The prime contractor encourages M/W/DBE participation and the use of apprentices, offering assistance with bonding, insurance, and materials to qualified subcontractors.
James W. Fowler Co.

POSTED

about 9 hours ago

DEADLINE

in 6 days
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS