Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

Castle Crags Defensible Space and Hardening

Forecast
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The California Department of Parks and Recreation, Northern Buttes District, is implementing a wildfire risk reduction project at Castle Crags State Park in Redding, California. The project focuses on structure hardening and the creation of defensible space for mission-critical facilities, including the Visitor Center, a Day Use Restroom, a Maintenance Shop, and three park residences. Key structural improvements include replacing wood shake shingles with Class A fire-rated roofing, installing metal doors with weather stripping, repairing siding, and utilizing Chapter 7A compliant ember-resistant screening on vents and under exposed wood decking. To further mitigate fire intensity, the project will establish defensible space zones by reducing vegetation and fuel continuity within a minimum of 100 feet surrounding the structures. This includes removing landscaping shrubs and replacing combustible bark with noncombustible, weed-resistant hardscape materials within five feet of the buildings. Managed by District Resources Manager Sabrina Bell, the project is categorized under NAICS code 238160 and is supported by categorical exemptions for minor alterations and maintenance.

General Info

Hardening structures and creating defensible space to reduce wildfire risk at Castle Crags State Park facilities.

Agency

California Parks and Recreation, Department of

Place of Performance

I-5 and Castle Creek Road, Redding, CA

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseForecast
Posted

forecast

Prepare for this forecast

Research the agency, track this forecast, and prepare your capture plan before the solicitation opens.

Organization & Contact Information

Show more
AgencyCalifornia Parks and Recreation, Department of
Contacts1 person available
OfficeN/A
Organization / Agency
California Parks and Recreation, Department of
Office AddressN/A
Contacts
Sabrina BellDistrict Resources Manager

Full Description

Show more
This project proposes structure hardening improvements and defensible space fuels reduction in Castle Crags State Park to reduce wildfire risk and increase structural resilience within the park. Work will prioritize identified high-risk and mission-critical facilities essential to park operations. At the Visitor Center, a Day Use Restroom, a Maintenance Shop, and three (3) park residence, work will include the following: • Replace existing wood shake shingles with Class A fire-rated roofing materials consistent with existing roofing within the park; • Within 5-ft of park structures, remove all landscaping shrubs and replace combustible bark with noncombustible, weed-resistant hardscape materials to prevent embers from igniting vegetation and spreading to structure; • Where shrubs remain, create spacing between shrubs to establish breaks between the fuel continuity; • Repair and patch holes in siding to reduce ember intrusion potential; • Replace rotten wood doors with metal doors and install weather stripping on doors/garage doors to seal and eliminate entry points for embers; • Replace all deteriorated fascia boards; • Replace existing vent screens with Chapter 7 A compliant ember-resistant screening; and • Install Chapter 7 A compliant screening to enclose the underside of any exposed wood decking to prevent ember accumulation and debris. This project will establish and maintain defensible space zones in compliance with State and Department guidelines by reducing vegetation and fuel continuity within a minimum of 100-ft surrounding structures within the park, lowering overall fire intensity potential near structures. These improvements in conjunction with defensible space and fuel reduction treatments around structures will create a comprehensive, layered wildfire risk reduction strategy for park infrastructure.

Similar Contracts

Same NAICS industry code

NAICS: 238160
New
SLED
26-11171 IFB Temporary Repair of Salt Shed Roof
Solicitation # 26-11171
Greene County, Missouri, is soliciting sealed bids for a one-time contract to perform temporary repairs on a salt shed roof located at 2065 N Clifton, Springfield, Missouri. The project is a response to hail storm damage from April 28, 2026, and requires the contractor to provide a leak-proof roof designed to last between 12 and 18 months. The scope of work includes pressure washing the existing roof, patching holes and gaps using sealant or Aluminum Roll Tap Flashing, smoothing the surface by trimming edges and sinking nails, fastening loose metal to rafters, and applying a waterproof material over the entire roof. Bidders must submit a Product Specification Sheet and Safety Data Sheet for the intended sealant and ensure work is performed within the product's required temperature specifications. The contract is governed by the laws of the State of Missouri and the Uniform Commercial Code. Award evaluation factors include the bidder's prior work experience, financial statements, subcontractor qualifications, material data, and proposed completion time. Contractors must adhere to Missouri prevailing wage rates and maintain comprehensive general liability and automobile liability insurance, with automobile coverage of at least $3,547,658.00 to meet sovereign immunity limits. Additional requirements include a 10-hour OSHA construction safety program for on-site employees and a notarized E-Verify affidavit for contracts exceeding $5,000.00. Bids must be submitted via the Greene County Electronic Bidding Portal by the December 1, 2026, deadline.
Greene County

POSTED

about 11 hours ago

DEADLINE

in 25 days
View Details
NAICS: 238160
New
SLED
ON CALL AS NEEDED ROOF MAINTENANCE, INSPECTION, DIAGNOSTIC, TROUBLESHOOTING AND REPAIR SERVICES
Solicitation # 902780
The Alameda County General Services Agency is soliciting proposals for on-call, as-needed roof maintenance, inspection, diagnostic, troubleshooting, and repair services for 64 facilities managed by the GSA-BMD North County CPL. This portfolio includes a diverse range of assets such as courthouses, administrative offices, and detention facilities across Alameda, Albany, Oakland, and San Leandro. The scope of work covers various roofing systems, including TPO, PVC, EPDM, metal, tile, and asphalt shingle, and specifically excludes full or partial roof replacements. Selected contractors must provide 24/7 emergency response capabilities and adhere to strict timelines, including acknowledging routine requests within four business hours and submitting written quotations within one to two business days. The contract is intended as a three-year agreement with two optional one-year renewals, starting February 9, 2027. The County plans to award the contract to a pool of up to two qualified bidders based on a best-value evaluation where qualitative competence is weighted more heavily than cost. Financial terms include a total estimated value of 390,000 dollars for parts and equipment allowances over three years, with labor costs quoted separately. Contractors must be registered with the California Department of Industrial Relations and pay prevailing wages. Additionally, the contract mandates a minimum 80 percent direct-employee performance requirement and caps material markups at 15 percent.
General Services Agency-Procurement

POSTED

about 11 hours ago

DEADLINE

in 11 days
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Prepare for this forecast

Research this forecast and prepare for the solicitation

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS