Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, August 19 at 2:00 PM EDT

Register Free →

Catavina Residential Development Project

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The Catavina Residential Development Project in Palm Desert, California, entails the construction of 546 single-family homes across four distinct zones on a single site, with varying lot sizes to accommodate different density configurations. The northwest area will feature 100 homes on 5,000-square-foot lots, the northeast will include 255 clustered six-pack units on smaller lots ranging from 1,976 to 2,288 square feet, the central portion will contain 88 homes on 3,000-square-foot lots, and the southern section will develop 103 homes on 4,050-square-foot lots. Approximately 15.4 acres of common open space will be integrated throughout the development, complemented by three retention basins totaling 2.5 acres to manage stormwater runoff. The project is located south of Fred Waring Drive and west of Portola Avenue, with the primary address tied to APN 620-170-009 and the zip code 92260. The grading and paving phases are scheduled for mid-to-late 2027, with building construction set to commence in February 2028 and conclude in November 2030. Public comments and submissions related to the project must be received by October 20, 2025, either by mail to the City of Palm Desert or via email to the Deputy Director of Development Services. The City of Palm Desert is the lead agency overseeing the project, with Kim Molina of Pacific LandPro listed as a secondary point of contact. Environmental compliance is a key component, requiring adherence to standards such as ASTM E 1527-21, RCRA, HMRRP, CERS, and 19 CCR § 2729.5, with inspections conducted by the Riverside County Department of Environmental Health at the project site. While infrastructure components like utility lines and circulation systems are implied, no specific contract value, pricing data, federal acquisition regulation clauses, or formal contract administration elements—such as payment offices, accounting codes, COR/COTR assignments, or invoicing systems—are documented in the available materials. The NAICS code 237210 indicates the project falls under Heavy and Civil Engineering Construction, and no set-aside or socioeconomic preferences are indicated. The only submission deadline and point of contact are clearly defined, but the absence of key federal contract form elements

General Info

546 homes planned in Palm Desert across four zones with open space and stormwater basins, construction starts 2028.

Agency

California → City of Palm Desert

NAICS

237210 - Land SubdivisionView NAICS

Place of Performance

Frank Sinatra Drive and Portola Avenue, Palm Desert, CA, 92260

Set-Aside

NONE

Documents

(18)

Appendix H1 Transportation Impact Analysis Catavina Residential

PDFtransportation-impact-analysis

Appendix F Infiltration Evaluation for Catavina Project

PDFreport

Palm Desert Catavina Residential Development Project Notice of Determination

PDFnotice-of-determination

CDFW Comments on Catavina Residential Development MND SCH# 2025091375

PDFcomment-letter

Appendix G Noise Modeling Report - Job 203638

PDFspecifications

DTSC Comments on Catavina Residential Development MND 2025091375

PDFcomment

Appendix C Cultural Resources Report for Blue Fern Catavina Project

PDFcultural-resources-report

Updated Geotechnical Report for Catavina Project Palm Desert CA

PDFgeotechnical-report

Appendix B Biological Resources Analysis for Catavina Residential Project

PDFbiological-resources-assessment

Appendix I Water Supply Assessment for Catavina Project

PDFwater-supply-assessment

Catavina Residential Development Project Summary Form

PDFenvironmental-summary

Catavina Residential Development Project Notice of Completion

PDFnotice-of-completion

Appendix A Air Quality Greenhouse Gas Energy Modeling Results - Catavina Residential Full Buildout

PDFsow

Palm Desert Catavina Residential Development Project NOI

PDFnotice-of-intent

Response to DTSC Comments on Catavina Residential Development IS/MND

PDFresponse-to-comments

Appendix E Phase I Environmental Site Assessment for Catavina Project

PDFphase-i-esa

Appendix H2_VMT Assessment - Catavina Residential VMT Screening

PDFtechnical-memorandum

Palm Desert Catavina Residential Development Draft ISMND September 2025

PDFinitial-study-mitigated-negative-declaration

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → City of Palm Desert
Contacts3 people available
OfficeN/A
Organization / Agency
California → City of Palm Desert
Office AddressN/A
Contacts
Carlos FloresDeputy Director of Development Services
Alicia GonzalezProject Manager

Interested Companies (1)

Show more
Michael Baker International
Palm Desert, CA

Full Description

Show more
The proposed project includes the development of 546 single-family single- and two-story residences, onsite circulation, utility infrastructure, stormwater improvements, and open space areas. In the northwest portion of the project site, the project would develop 100 single-family units on 5,000-square foot lots. The northeast portion of the site would be developed with 255 six-pack clustered single-family units, on lots ranging from 1,976 to 2,288 square feet. The central portion of the project site would be developed with 88 single-family homes on 3,000-square foot lots. The southern portion of the site would be developed with 103 single- family units on 4,050-square foot lots. Approximately 15.4 acres of common open space would be distributed throughout the project site. Three retention basins totaling 2.5 acres are proposed.

Similar Contracts

Same NAICS industry code

NAICS: 237210
New
SLED
Master Developer For Approximately 240 Acres At Waco Regional Airport
Solicitation # RFP2026-035
The City of Waco is soliciting qualified and financially capable developers or development teams to act as the master developer for approximately 240 acres of land at Waco Regional Airport, aiming to create an airport-compatible development that aligns with operational and zoning requirements. Proposals must be submitted as sealed bids to the City’s Operations Center at 1415 N. 4th Street, Waco, TX, no later than 2:00 P.M. on Tuesday, September 15, 2026, and will be publicly opened at 2:01 P.M. via Zoom and telecom conferencing. The selected developer will be responsible for planning, leasing, marketing, operating, and maintaining the development, ensuring long-term viability and compatibility with airport functions. Interested parties are directed to the project page on Bonfire for comprehensive details and must be prepared to demonstrate financial capacity, relevant experience, and a clear vision for the用地. Primary point of contact for inquiries is Daryle Bullard, Senior Purchasing Agent, reachable at daryleb@wacotx.gov or 254-750-6616, with secondary support provided by Purchasing Manager Kasey Gamblin at kaseyg@wacotx.gov or 254-750-8060. The solicitation, identified as RFP 2026-035, was posted on August 4, 2026, and falls under the City of Waco’s jurisdiction in Texas, with no set-aside specifications noted. The official portal for the solicitation is available through TXSmartBuy, offering access to all documentation required for proposal submission. All applicants must ensure full compliance with the terms outlined in the request and be prepared for public evaluation of their proposals.
CITY OF WACO

POSTED

3 days ago

DEADLINE

in about 1 month
View Details