This Solicitation opportunity from Maryland was posted on October 13, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.
Solicitation BPM059062 is an Invitation for Bids issued by the Maryland Department of General Services for the exterior window and storefront replacement at the Baltimore City Community College South Pavilion. This firm fixed price construction project, identified as Project No. CC-624-230-001, has an estimated value between 1,000,000 and 2,500,000 dollars and a construction duration of 210 calendar days. The scope of work involves replacing exterior windows and storefronts for a 15,000 square foot building area, requiring adherence to AAMA 501.2 watertightness standards and ADA accessibility guidelines. Bids are due by November 23, 2026, and must be submitted electronically via eMaryland Marketplace Advantage.
The contract will be awarded by lot to the responsive and responsible bidder offering the most favorable total bid price. Key requirements include a 10 percent Minority Business Enterprise goal and a 1 percent Veteran-Owned Small Business Enterprise goal. Because the project exceeds 250,000 dollars, the Prevailing Wage law applies, and bidders must provide bid bonds for projects over 200,000 dollars. Awardees must also provide performance and payment bonds, as well as certification of American-manufactured goods. Administration includes a mandatory 1 percent electronic transaction fee on approved invoices and payment via electronic funds transfer. Quality assurance is managed through field testing at 5, 50, and 90 percent completion milestones.
General Info
Maryland DGS window replacement at BCCC South Pavilion, $1M-$2.5M, due November 23, 2026.
PDF, High priority: read this first2 pages · amendment
HighAI Summary for Addendum No. 1 - BCCC Exterior Window and Storefront Replacement: Issued on 10/26/26 by the Maryland Department of General Services for Project No. CC-624-230-001. This addendum updates the Project Cost Classification to $1,000,000 - $2,500,000 and corrects the pre-bid meeting location to the Facilities Trailer at 2901 Liberty Heights Avenue, Baltimore, MD.
PDF
PDF, High priority: read this first14 pages · specifications
HighAI Summary for Appendix 4A - Instructions for Attachment D-1A (MBE Utilization): This document provides detailed instructions for bidders/offerors on how to complete Attachment D-1A, the Minority Business Enterprise (MBE) Utilization and Fair Solicitation Affidavit and MBE Participation Schedule. It defines MBE certification requirements, NAICS code usage, and the process for meeting or requesting waivers for MBE participation goals and subgoals. It emphasizes that failure to accurately submit these forms may result in a bid being deemed non-responsive or a proposal not susceptible for award.
PDF
PDF, High priority: read this first4 pages · specifications
HighAI Summary for Appendix 4 - MBE Participation Goal: This document outlines the Minority Business Enterprise (MBE) participation goals and subgoals for a procurement. It details the requirements for bidders to commit to these goals via Attachment D-1A, the process for requesting waivers, and the mandatory documentation (Attachments D-1 through D-5) required for submission and award eligibility. It specifies that failure to submit accurate MBE documentation may result in a bid being deemed non-responsive or a proposal not susceptible for award.
PDF
PDF, High priority: read this first3 pages · specifications
HighAI Summary for Appendix 5 - VSBE Participation Goal: This document outlines the Veteran-Owned Small Business Enterprises (VSBE) participation goals and requirements for a procurement. It details the obligations of bidders to identify VSBE work categories, conduct outreach, and submit a VSBE Utilization Affidavit and Participation Schedule. It also specifies the reporting requirements for the contractor to track VSBE payments and performance in accordance with COMAR 21.11.14.
PDF
PDF, High priority: read this first1 page · specifications
HighAI Summary for Appendix 7 - Bonds: Effective July 2024, this document outlines the bonding requirements for the solicitation and resulting contract. It specifies requirements for Bid, Performance, and Payment bonds, defines acceptable security per COMAR 21.06.07.01, and provides details on the Surety Bond Assistance Program available to qualifying small businesses through the Maryland Small Business Development Financing Authority (MSBDFA).
PDF
PDF, High priority: read this first1 page · contract-document
HighAI Summary for Appendix 9 - Electronic Transaction Fee: This document outlines the requirements for the Contractor to remit a 1% electronic transaction fee to the State based on total approved invoice amounts. It specifies payment methods via ACH or check, the requirement to submit a Monthly Usage Report (Attachment Z), and the effective date of February 2026. Failure to comply is considered a contract default.
PDF
PDF, High priority: read this first22 pages · ifb
HighAI Summary for BCCC Exterior Window and Storefront Replacement at South Pavilion (BPM059062): Invitation for Bids (IFB) issued by the Maryland Department of General Services (DGS) on 10/13/26 for the exterior window and storefront replacement at the Baltimore City Community College South Pavilion. The procurement is a Firm Fixed Price contract with a construction duration of 210 calendar days. Key dates include a pre-bid conference on 10/30/26 and a bid closing date of 11/23/26. The solicitation includes an MBE subcontracting goal of 10% and a VSBE goal of 1%.
PDF
PDF, High priority: read this first199 pages · specifications
HighAI Summary for BCCC Exterior Window and Storefront Replacement at South Pavilion - Project Manual: Project Manual (Bid Set) dated July 7, 2026, for the construction of exterior window and storefront replacements at Baltimore City Community College (South Pavilion), DGS Project No. CC-624-230-001. The document includes procurement requirements, a detailed table of contents for project specifications (Divisions 00-33), a list of drawing sheets, and the project directory.
PDF
PDF, High priority: read this first12 pages · specifications
HighAI Summary for BCCC Exterior Window and Storefront Replacement - Drawings: Architectural bid set drawings (dated 05/08/2026) for the exterior window and storefront replacement at the Baltimore City Community College South Pavilion (DGS Project No. CC-624-230-001). The document includes exterior elevations, construction notes, material specifications for YKK systems, and a drawing list for the 15,000 SF building area.
PDF
PDF, High priority: read this first7 pages · wage-determination
HighAI Summary for BCCC Exterior Window and Storefront Replacement - Prevailing Wage Determination: This document provides the prevailing wage determination and instructions for contractors for Project No: CC-624-230-001 (BCCC Exterior Window and Storefront Replacement). It outlines requirements for electronic submission of certified payroll records, apprentice ratios, overtime pay, and the necessity of maintaining valid state and county licenses. It also specifies penalties for non-compliance and requirements for posting wage rates at the work site.
PDF
PDF, High priority: read this first2 pages · specifications
HighAI Summary for Construction Supplemental - July 2024: Effective July 2024, this supplemental document outlines additional requirements for construction solicitations. It covers security protocols for personnel, bid/proposal bond notices per Maryland State Finance & Procurement laws, contract retainage, and mandates for American-manufactured goods.
PDF
PDF, High priority: read this first63 pages · specifications
HighAI Summary for Maryland Department of General Services General Conditions for Construction Contracts: This document contains the General Conditions for Construction Contracts for the State of Maryland Department of General Services, revised January 18, 2023 (based on the July 1, 2022 version). It establishes the legal and operational framework for construction projects, including definitions, owner and contractor responsibilities, change order procedures, payment terms, insurance requirements, and dispute resolution.
PDF
PDF, High priority: read this first7 pages · instructions-to-bidders
HighAI Summary for Maryland Department of General Services - Instructions to Bidders for Construction Projects: Revised October 1, 2025, this document provides standardized instructions for bidders on construction projects for the State of Maryland Department of General Services. It outlines project cost classifications, bid submission requirements via eMMA, definitions for Base Bids and Unit Prices, MBE documentation requirements, and bid bond mandates for projects exceeding $200,000.
PDF
PDF, Low priority3 pages · supporting-documents
LowAI Summary for Appendix 1 - Abbreviations and Definitions: This document provides a comprehensive list of abbreviations and definitions used within an IFB/RFP issued by the Maryland Department of General Services. It defines key terms such as Bidder/Offeror, Contract Monitor, Procurement Officer, and specific Maryland regulatory terms like COMAR, MBE, and VSBE.
PDF
PDF, Low priority2 pages · vendor-feedback-form
LowAI Summary for Attachment 1 - No Bid Proposal Notice, Vendor Feedback Form: A State of Maryland procurement form (effective July 2024) used by vendors to provide feedback on solicitations or to notify the procurement officer of their decision not to bid, including specific reasons for non-participation.
PDF
PDF, Low priority3 pages · past-performance
LowAI Summary for Attachment AA - Contractor Questionnaire: A contractor qualification questionnaire from the Maryland Department of General Services (DGS 340-8 REV 1/97). The document collects business identification, licensing, bonding capacity, financial data, MBE certification, and a detailed classification index of construction and maintenance services to evaluate a contractor's capabilities and experience.
PDF
PDF, Low priority3 pages · certification-form
LowAI Summary for Attachment AB - Certification of American-Manufactured Goods: A certification form for bidders/offerors to declare whether offered goods are American-manufactured per COMAR 21.11.15.04B(1). It includes options to identify emergency life safety and property safety goods via Form A and non-emergency goods via Form B.
PDF
PDF, Low priority2 pages · bid-bond
LowAI Summary for Bid Bond - CC-624-230-001 BCCC Exterior Window and Storefront Replacement: A standard bid bond template effective May 1, 2018, for the State of Maryland. This document is used by a Principal and Surety to guarantee the execution of a contract for project CC-624-230-001 (BCCC Exterior Window and Storefront Replacement at South Pavilion) upon bid acceptance.
PDF
PDF, Low priority2 pages · bid-bond
LowAI Summary for Bid Bond Template - BCCC Exterior Window and Storefront Replacement: A standard bid bond form effective May 1, 2018, for the State of Maryland. This specific instance is associated with project CC-624-230-001 for the BCCC Exterior Window and Storefront Replacement at South Pavilion. It outlines the obligations of the Principal and Surety to ensure the execution of the contract upon bid acceptance.
PDF
PDF, Low priority2 pages · supporting-documents
LowAI Summary for Exhibit 1 - MBE, VSBE, and SBR Research Factors (BCCC Exterior Window and Storefront Replacement): Effective July 2024, this document provides the research factors used to determine expected participation levels for Minority Business Enterprises (MBE), Veteran-owned Small Business Enterprises (VSBE), and Small Business Reserves (SBR) for solicitation BPM059062 (BCCC Exterior Window and Storefront Replacement). It lists NAICS and UNSPSC codes for metal window/door manufacturing and glass/glazing contractors along with the number of certified firms available in the MDOT and eMMA directories.
PDF
PDF, Low priority25 pages · contract-document
LowAI Summary for Maryland Department of General Services Sample Contract: A sample contract template from the Maryland Department of General Services (DGS). The document outlines standard terms and conditions, including definitions, scope of contract, period of performance, notice to proceed, and payment terms. It references the incorporation of the IFB, Contract Affidavit, and Bid as exhibits.
AI Contract Breakdown
Uniform Contract Format
Sign up to view the full breakdown with detailed analysis of each section.
Timeline
PhaseClosed
Posted
Solicitation
Response Deadline
Submission deadline
Submission Closed
Find active opportunities like this
Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.