Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, December 9 at 2:00 PM ET

Register Free →

CDP 2023-0044 (DEV2023-0141) – Ocean Street Residence

Forecast
CDP 2023-0044State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

General Info

NAICS

N/A

Place of Performance

Carlsbad, CA

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Get what you need to respond

No documents were posted with this contract.

  • Buyer contactEmail and phone
  • Original solicitationLink to the source posting
Get the buyer contact

Ask CLEATUS

I've read this contract. Ask me anything.

Timeline

PhaseForecast
Posted

forecast

Prepare for this forecast

Research the agency, track this forecast, and prepare your capture plan before the solicitation opens.

Organization & Contact Information

Show more

Full Description

Show more
A Coastal Development Permit for the demo of a 360-square-foot garage, and the construction of a new 3,730-square-foot, three-story, 30-feet-tall, single-family residence and an attached 480-square-foot garage.

More opportunities from California → City of Carlsbad

Same awarding agency

NAICS: 237310
New
SLED
El Camino Real Widening Project, Arenal Road to La Costa Avenue
Solicitation # CIP 6051
The El Camino Real Widening Project, managed by the City of Carlsbad, involves expanding El Camino Real between Arenal Road and La Costa Avenue from two southbound vehicular travel lanes to three. The scope of work includes installing eight-foot buffered bike lanes in both directions, constructing a new sidewalk between Arenal Road and the San Marcos Creek Bridge, and building new pedestrian bridges on both sides of the creek. Additionally, the project entails relocating and abandoning utilities at the San Marcos Creek Crossing, performing grading, and implementing intersection improvements at La Costa Avenue and Costa Del Mar Road to ensure ADA-compliant curb ramps. The southbound approach to Arenal Road will also be restriped to include one left turn lane, two through lanes, and one shared through-right lane. Located within the Coastal Zone in Carlsbad, California, the project requires the acquisition of some right-of-way and the permanent removal of 0.201 acre of hardline preserve areas via a Habitat Management Plan amendment. Due to environmental and cultural sensitivities, the contractor must provide paleontological monitoring by a professional paleontologist and tribal cultural monitoring by a qualified archaeologist and Luiseño Native American. All construction crews are required to undergo cultural awareness and sensitivity training. The project is subject to oversight by the California Coastal Commission and the U.S. Fish and Wildlife Service, with a public review period scheduled from October 24 to November 24, 2025.
Highway, Street, and Bridge Construction

POSTED

1 day ago

DEADLINE

N/A
View Details
NAICS: 236116
SLED
SALK AVENUE APARTMENTS PROJECT
Solicitation # 202603043
The Salk Avenue Apartments Project, approved by the City of Carlsbad on June 3, 2026, involves the development of a multifamily residential complex on a 9.8-acre site located south of Salk Avenue between College Boulevard and El Camino Real. The project consists of 397 residential units, including 59 units restricted to low-income households at 80% Area Median Income to comply with the Fenton Carlsbad Center Specific Plan. The development features a five-story building with a maximum height of 59 feet and a gross area of approximately 416,152 square feet. Amenities include 27,000 square feet of outdoor open space, a swimming pool, fitness facilities, and a five-level parking structure providing 541 spaces, 70 of which are equipped with electric vehicle charging stations. The project is subject to a 22-month construction timeline and requires specific infrastructure improvements, including the replacement of 875 linear feet of sewer pipeline beneath College Boulevard and the repaving of Salk Avenue following utility tie-ins. Environmental compliance was managed through a Final Focused Initial Study and Mitigated Negative Declaration, addressing a single disqualifying condition regarding protected species habitat. Key requirements include adherence to the Carlsbad Habitat Management Plan Adjacency Standards to protect a 0.33-acre Diegan coastal sage scrub patch and the approval of a final fire protection plan under the California Fire Code. The project was evaluated for CEQA exemptions under Assembly Bill 130 and Senate Bill 131 to streamline the housing development process.
New Multifamily Housing Construction (except For-Sale Builders)

POSTED

5 months ago

DEADLINE

N/A
View Details
NAICS: 237310
SLED
Avenida Encinas Coastal Rail Trail and Pedestrian Improvements Project, CDP2024-0010/HMP2024-0009
Solicitation # CDP2024-0010/HMP2024-0009
The Avenida Encinas Coastal Rail Trail and Pedestrian Improvements Project (CDP2024-0010/HMP2024-0009) is a City of Carlsbad initiative to enhance roadway, bikeway, and pedestrian infrastructure along a one-mile segment of Avenida Encinas between Palomar Airport Road and the Poinsettia Coaster Station Driveway. This project implements Reach 5 of the City of Carlsbad Trails Master Plan and includes the construction of seven-foot-wide striped buffered Class II bike lanes, roadway widening, new pavement, sidewalks, and curb ramps. Additional site improvements feature landscaped medians, bio-filtration swales, lighting, fencing, parking, retaining walls, and median passageways equipped with flashing beacons. The project was approved on January 21, 2026, following an environmental review process under CEQA and NEPA that resulted in a Mitigated Negative Declaration. Key compliance requirements include adherence to the Americans with Disabilities Act, NPDES permit requirements for erosion and sediment control, and the City of Carlsbad's Master Drainage Plan and Storm Water Ordinance. The project requires a Major Coastal Development Permit and a Habitat Management Plan Permit due to its location within the Coastal Zone. Administrative oversight is led by Senior Planner Scott Donnell, with technical environmental support provided by HELIX Environmental Planning Inc.
Highway, Street, and Bridge Construction

POSTED

10 months ago

DEADLINE

N/A
View Details

Prepare for this forecast

Research this forecast and prepare for the solicitation

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS