El Camino Real Widening Project, Arenal Road to La Costa Avenue
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
AI Contract Overview
The City of Carlsbad is proposing to widen El Camino Real between Arenal Road and La Costa Avenue, adding a third southbound lane, installing 8-foot buffered bike lanes with 3-foot buffers, and constructing a new sidewalk along the corridor. The project includes building two pedestrian bridges over San Marcos Creek, upgrading intersections with ADA-compliant curb ramps and restriping to improve traffic flow, and relocating or abandoning utilities in the project area. While most work occurs within existing right-of-way, additional land acquisition is necessary, and grading will impact native vegetation. The project lies within the Coastal Zone and requires compliance with California Coastal Commission regulations, as well as amendments to the Habitat Management Plan to permanently remove 0.201 acre of protected preserve land, necessitating a waiver from open space boundary adjustment requirements under the General Plan. Environmental compliance is governed by CEQA, with mitigation measures detailed in the Mitigated Negative Declaration, including ongoing monitoring by qualified archaeologists, paleontologists, and tribal representatives during construction to protect cultural and biological resources. Construction is scheduled to occur between October 24, 2025, and November 24, 2025, with all work performed at the project site in Carlsbad, California, 92009. The City of Carlsbad serves as the lead agency and retains responsibility for inspection and acceptance, with oversight coordinated through key personnel including the Senior Planner and Associate Engineer, and supported by consulting firm AECOM. No federal contract clauses, pricing details, evaluation factors, or packaging specifications are documented, and the project operates under a forecast status with no formal contract type identified. Key regulatory conditions include adherence to the Carlsbad Municipal Code, U.S. Army Corps of Engineers Section 404 permits, and tribal consultation protocols, while all environmental mitigation actions are binding contractual obligations derived from permits and approvals. Public comments on the project are accepted through written submission or email until November 24, 2025, and project documentation is available online via the City’s Planning Division portal.
General Info
Agency
NAICS
Place of Performance
ARENAL ROAD / COSTA DEL MAR ROAD / LA COSTA AVENUE, Carlsbad, CA, 92009Set-Aside
Timeline
Organization & Contact Information
Interested Companies (1)
Full Description
Similar Contracts
Same NAICS industry code
