El Camino Real Widening Project, Arenal Road to La Costa Avenue

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The City of Carlsbad is proposing to widen El Camino Real between Arenal Road and La Costa Avenue, adding a third southbound lane, installing 8-foot buffered bike lanes with 3-foot buffers, and constructing a new sidewalk along the corridor. The project includes building two pedestrian bridges over San Marcos Creek, upgrading intersections with ADA-compliant curb ramps and restriping to improve traffic flow, and relocating or abandoning utilities in the project area. While most work occurs within existing right-of-way, additional land acquisition is necessary, and grading will impact native vegetation. The project lies within the Coastal Zone and requires compliance with California Coastal Commission regulations, as well as amendments to the Habitat Management Plan to permanently remove 0.201 acre of protected preserve land, necessitating a waiver from open space boundary adjustment requirements under the General Plan. Environmental compliance is governed by CEQA, with mitigation measures detailed in the Mitigated Negative Declaration, including ongoing monitoring by qualified archaeologists, paleontologists, and tribal representatives during construction to protect cultural and biological resources. Construction is scheduled to occur between October 24, 2025, and November 24, 2025, with all work performed at the project site in Carlsbad, California, 92009. The City of Carlsbad serves as the lead agency and retains responsibility for inspection and acceptance, with oversight coordinated through key personnel including the Senior Planner and Associate Engineer, and supported by consulting firm AECOM. No federal contract clauses, pricing details, evaluation factors, or packaging specifications are documented, and the project operates under a forecast status with no formal contract type identified. Key regulatory conditions include adherence to the Carlsbad Municipal Code, U.S. Army Corps of Engineers Section 404 permits, and tribal consultation protocols, while all environmental mitigation actions are binding contractual obligations derived from permits and approvals. Public comments on the project are accepted through written submission or email until November 24, 2025, and project documentation is available online via the City’s Planning Division portal.

General Info

Widen El Camino Real, add bike lanes and sidewalks, build pedestrian bridges, mitigate environmental impacts in Carlsbad.

Agency

California → City of Carlsbad

NAICS

237310 - Highway, Street, and Bridge ConstructionView NAICS

Place of Performance

ARENAL ROAD / COSTA DEL MAR ROAD / LA COSTA AVENUE, Carlsbad, CA, 92009

Set-Aside

NONE

Documents

(6)

El Camino Real Widening Project Notice of Completion & Environmental Document Transmittal

PDFenvironmental-document

Notice of Intent to Adopt Mitigated Negative Declaration for El Camino Real Widening Project

PDFspecial-notice

flat_ECR_Draft 8 ISMND_10162025

PDF

SCH 2025100975 El Camino Real Widening Project Memo

PDFmemorandum

_SCH 2025100975 memo

ZIP

El Camino Real Widening Project Environmental Impact Summary

PDFenvironmental-summary

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → City of Carlsbad
Contacts3 people available
OfficeN/A
Organization / Agency
California → City of Carlsbad
Office AddressN/A
Contacts
SCOTT DONNELLSENIOR PLANNER
BRANDON MILESASSOCIATE ENGINEER
MICHAEL ANGUIANOCONSULTING FIRM

Interested Companies (1)

Show more
Aecom
Los Angeles, CA

Full Description

Show more
This city project proposes to widen El Camino Real between Arenal Road and La Costa Avenue, install buffered bike lanes and a new sidewalk, construct new pedestrian bridges over San Marcos Creek, abandon and relocated utilities, and perform intersection improvements and restriping. While mostly within existing right of way, the project also proposes to acquire right-of-way. The project proposes grading and impacts to native vegetation. Pursuant to the General Plan, the project proposes a waiver from open space boundary adjustment requirements. An amendment is also proposed to adjust a Habitat Management Plan hardline boundary to accommodate the project’s permanent removal of 0.201 acre of hardline preserve areas. The project is in the Coastal Zone.

Similar Contracts

Same NAICS industry code

NAICS: 237310
New
LACSD Surface Water PFAS Removal Project No. 251, CA
Solicitation # lacsd-surface-water-pfas-removal-project-no-251-ca
The contract involves the design and construction of PFAS treatment facilities at the Bernina and Cedar Glen Water Treatment Plants in California, encompassing comprehensive civil, structural, mechanical, electrical, instrumentation, and process system upgrades to remove per- and polyfluoroalkyl substances from surface water. The scope requires integrated engineering solutions to meet evolving regulatory standards for drinking water safety, with specialized focus on advanced filtration and extraction technologies tailored to the existing infrastructure at both sites. Work will include site-specific modifications to ensure seamless operational integration while maintaining continuous water service during implementation. This solicitation, issued by Pyramid Building & Engineering, Inc., is designated for Disadvantaged Business Enterprises under the Department of Transportation set-aside program and falls under NAICS code 237310 for Water and Wastewater Pipeline and Related Structures Construction. Proposals must be submitted by September 3, 2026, with primary point of contact John Garrison available for inquiries via phone or email. The project is located entirely within California, with no specified city or zip details provided in the public record, and all contractual obligations are tied to performance at the two designated treatment plants. Participation is open to qualified firms seeking to support critical public health infrastructure improvements in compliance with state and federal water quality mandates.
Pyramid Building & Engineering, Inc.

POSTED

about 6 hours ago

DEADLINE

in 26 days
View Details