Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Washington was posted on March 2, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Cedar Falls Fire Main Replacement

Closed
PW#2024-031State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237110
New
IEUA RMPU Basin Improvements Project Montclair Basin Improvements
Solicitation # ieua-rmpu-basin-improvements-project-montclair-basin-improvements
The IEUA RMPU Basin Improvements Project involves construction improvements at Montclair Basin 2 and 3 in Chino, California. The primary objective is to divert available storm flows from the San Antonio Creek Channel into existing basins to facilitate groundwater recharge. The scope of work is comprehensive, requiring all materials, labor, tools, equipment, and transportation necessary to furnish, install, commission, and deliver a fully functional project. Key activities include civil and site work such as grading, demolition, saw cutting, cold planing, and trucking, as well as the installation of concrete pipes and structures. Specialized services required for the project include traffic control, SWPPP, construction surveying, electrical work, welding, and preconstruction video. Norstar Plumbing and Engineering, Inc. is the prime contractor seeking certified and qualified DBE, MBE, SBE, and WBE subcontractors and suppliers to support these efforts. The solicitation is categorized under NAICS code 237110. Interested parties must submit their bids by October 29, 2026, at 2:00 PM. Detailed plans and specifications are available through the Inland Empire Utilities Agency bidding website. Primary points of contact for this opportunity are Nathan Plummer and Destiny Plummer.
Norstar Plumbing and Engineering, Inc

POSTED

about 4 hours ago

DEADLINE

in 5 days
NAICS: 237110
New
Morgans Branch Force Main and Pump Station Improvements
Solicitation # SRP-W-134-0290
The Morgans Branch Force Main and Pump Station Improvements project, solicitation number SRP-W-134-0290, is a construction effort for the City of Belmont, North Carolina, with a project estimate of 16,690,000 dollars. The scope of work involves the installation of 16,435 linear feet of new 20-inch ductile iron force main and comprehensive upgrades to the Morgans Branch Pumping Station. Key station improvements include the installation of a new wet well, valve vault, and associated appurtenances, as well as the demolition of existing pumps and piping. The project also requires the installation of new gravity sewers, manholes, and related site work including excavation, paving, and erosion control. The contract will be awarded to the responsible bidder submitting the lowest responsive bid, with a strong emphasis on qualifications, financial ability, and MWBE compliance. Bidders must submit a signed EJCDC C-410 Bid Form, a bid bond, and evidence of authority to sign. The project is governed by EJCDC standard general and supplementary conditions, requiring performance and payment bonds and insurance with an A.M. Best rating of A-VII or better. Performance begins upon the issuance of a Notice to Proceed, and payments are processed monthly via applications for payment submitted to the Engineer, becoming due 30 days after presentation to the owner.
Don Moorhead Construction, Inc.

POSTED

about 4 hours ago

DEADLINE

in 17 days
NAICS: 237110
New
Alvarado Trunk Sewer Ph IV and Water Main Relocations Bid Package A, Contract K-27-2470-DBB-3-C
Solicitation # K-27-2470-DBB-3-C
Flatiron Dragados Constructors, Inc. is soliciting bids for the Alvarado Trunk Sewer Ph IV and Water Main Relocations Bid Package A, Project No. K-27-2470-DBB-3-C, for the City of San Diego. This CASRF and EPA funded project is located in California and seeks quotes from subcontractors and suppliers for a wide range of services, including infrastructure and utilities such as electrical work, pipe supply, and water truck services; material supply for aggregate, geotextile, and ready mix concrete; and professional services including surveying, QC testing, and biological services. The solicitation is set aside for SBA certified Women-Owned Small Businesses and Disadvantaged Business Enterprises. Bids must be submitted via email or fax by October 28, 2026, at 2:00 PM and must remain valid for 120 days. All subcontractors are required to hold a valid California contractor license and be registered with the California Department of Industrial Relations per Public Contract Code Section I725.5. The project is subject to a Project Labor Agreement. Additionally, Flatiron Dragados reserves the right to require payment and performance bonds equal to 100 percent of the contract value, with actual bond premium costs reimbursed up to a maximum of 3 percent. Primary contact for this solicitation is Veronica Garcia.
Flatiron Dragados Constructors, Inc.

POSTED

about 4 hours ago

DEADLINE

in 4 days
NAICS: 237110
New
Main Wastewater Treatment Plant Secondary Reactors Rehabilitation Phase 2 in CA
Solicitation # main-wastewater-treatment-plant-secondary-reactors-rehabilitation-phase-2-ca
Garney Pacific, Inc. is seeking quotes from qualified subcontractors for the Main Wastewater Treatment Plant Secondary Reactors Rehabilitation Phase 2 project located in Oakland, California, for the East Bay Municipal Utility District. The comprehensive scope of work involves the rehabilitation of covered and open concrete structures, including concrete resurfacing, restoration, and the installation of platforms and access improvements. Mechanical and piping requirements include the relining, modification, or replacement of small and large diameter steel and ductile iron pipes, pipe supports, valves, and piping appurtenances, as well as the installation and operation of a temporary 11 MGD pumped bypass. Additionally, the project entails the rehabilitation of reactor mixers and aerators, modifications to sluice and slide gates, rerouting of sump pump discharge lines, excavation, trench work, and surveying. Electrical and instrumentation work includes the installation of new systems, improvements to existing instrumentation, and the rehabilitation and replacement of motor control center components. This solicitation is open to small businesses, including certified Veteran Owned, Service-Disabled Veteran Owned, Women-Owned, and HUBZone small businesses. All subcontractors are required to utilize union labor and must be prepared to provide a 100 percent Payment and Performance Bond from a US Treasury listed Surety Company, providing their bond rate at the time of bid for reimbursement. Quotes for services and supplies, including lead abatement, metals fabrication, and painting and coatings, are due by November 17, 2026, with the final bid date set for November 18, 2026.
Garney Pacific, Inc.

POSTED

about 4 hours ago

DEADLINE

in 25 days

AI Contract Overview

Show more

This contract involves the replacement of the fire water system located in the Cedar Falls Historic District within the Cedar River Municipal Watershed, near North Bend, Washington. The project scope includes installing approximately 550 linear feet of 6-inch ductile iron pipe with corrosion protection, along with new fire hydrants, removal and disposal of contaminated soils, and surface restoration work. The improvements are targeted to service the area around the Cedar Falls Powerhouse and related facilities, situated behind secured gates. The engineer's cost estimate for completing the work stands at $400,000, exclusive of taxes. The solicitation, titled "Cedar Falls Fire Main Replacement," was posted by the Washington Public Works agency with a response deadline of March 25, 2026. The contract is managed by the Seattle office of Public Works, with primary contact Mark Fredrickson, a Supervising Civil Engineer, and secondary contact Gina Owens, a Senior Construction Contracts Specialist. Prospective bidders can access further details and submit responses through the agency's online procurement portal.

General Info

Replace fire water system with 550 ft ductile iron pipe, hydrants, soil removal, $400,000 budget.

Documents

7

Bid Forms for Cedar Falls Fire Main Replacement PW#2024-031

PDF, High priority: read this first11 pages · bid-forms
High

PW#2024-031 Cedar Falls Fire Main Replacement Project Manual

PDF, High priority: read this first138 pages · rfp
High

2017 SPU Watershed Protection Plan Update

PDF, Low priority85 pages · plan-document
Low

Cedar Falls Fire Main Subsurface Soil Data Report June 2022

PDF, Low priority241 pages · soil-sampling-report
Low

Drawings PW#2024-031 Survey and Civil Mapping Symbology

PDF, Low prioritydrawings
Low

Forest Fire Protection Requirements for Operations On or Near Forest Land - 2018

PDF, Low priority76 pages · other
Low

Prevention of Aquatic Invasive Species in Seattle Water Supply Watersheds - August 2014

PDF, Low priority52 pages · other
Low

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyWashington → Public Works
Contacts2 people available
OfficeSeattle, WA, 98104, USA
Organization / AgencyWashington → Public Works
Office AddressSeattle, WA, 98104, USA
Contacts
Mark FredricksonSupervising Civil Engineer
Gina OwensSr. Construction Contracts Specialist

Interested Companies (10)

Willdan Energy SolutionsSan Francisco, CA
Genesis Excavation and DemoltionTacoma, WA
Ryatt ConstructionSeattle, WA

See All 10 Interested Companies

Start a free trial to view all interested companies, their contact details, and full contractor profiles.

Start Free Trial

Full Description

Show more
PROJECT LOCATION: This Project is located at the Cedar Falls Historic District in the Cedar River Municipal Watershed (CRMW), 9 miles southeast of North Bend, WA behind secured gates. PROJECT DESCRIPTION: This Project consists of the following elements of Work: construction of a replacement fire water system to service the area surrounding the Cedar Falls Powerhouse and associated facilities. System includes approximately 550 LF of 6 inch DI pipe, corrosion protection, fire hydrants, removal and disposal of contaminated soils, other miscellaneous removals and surface restoration work. ESTIMATE: The Engineer's Estimate for this Project is $400,000 (before tax).

More opportunities from Washington → Public Works

Same awarding agency

NAICS: 541330
New
SLED
2026 AC Water Main Replacement
Solicitation # 2026-RFQ-042
Solicitation 2026-RFQ-042 is a request for qualifications from the City of Mercer Island Public Works department for professional engineering services to design water system upgrades. The project focuses on replacing approximately 5,000 linear feet of aging asbestos cement water mains with ductile iron mains along SE 40th St and E Mercer Way. The scope is divided into two phases: Phase 1 involves water system and PRV vault replacement on SE 40th St from Greenbrier Ln to 97th Ave SE, and Phase 2 extends the replacement to 97th Ave SE and the 3700 and 3800 blocks of East Mercer Way. Additional components for replacement include fire hydrants and water services. The design must comply with the Reduction of Lead in Drinking Water Act and the City of Mercer Island Standard Details Water. The project follows a goal-based timeline with bid-ready plans for Phase 1 due by Q2 2027 and Phase 2 by Q3 2027, with overall construction completion targeted for Q2 2028. Qualified firms must be licensed in the State of Washington and submit a Statement of Qualifications limited to 12 pages, including a proposed timeline and three references from the last five years. Selection is at the sole discretion of the City, and the awarded firm will negotiate a scope and fee schedule using the City's standard professional services agreement. Administration is managed by the City Manager, with payments issued via City warrant within 45 days of receiving a proper monthly invoice.
Engineering Services

POSTED

3 days ago

DEADLINE

in 11 days
View Details

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS