Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Connecticut was posted on April 30, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Ceiling Replacement - Flood Middle School

Closed
BID 2026-28State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

AI Contract Overview

Show more

The contract solicitation BID 2026-28 issued by the Connecticut Department of Administrative Services Procurement for Flood Middle School in Stratford, CT, calls for the complete removal and replacement of the existing ceiling system in the school library. The scope includes removing the entire ceiling structure, safely disconnecting and securing all existing light fixtures and ceiling-mounted devices for later reinstallation, and installing a new suspended ceiling system. Notably, new light fixtures are excluded from this contract and will be provided and installed by a separate entity. Work must be performed under the AIA A201-2007 standard form with supplementary conditions, and all materials must be delivered F.O.B. destination in manufacturer-original sealed packaging, properly labeled and protected to prevent damage during transit and storage. Compliance with preservation standards requires materials to be stored above ground level, under weathertight conditions, and in accordance with manufacturer specifications for temperature and humidity. The project has a strict timeline with mobilization no later than June 22, 2026, substantial completion by July 10, 2026, and final close-out by August 28, 2026. All bids must be submitted in sealed physical envelopes to the Town of Stratford’s Purchasing Department by 10:00 AM on Thursday, May 28, 2026; electronic submissions are prohibited. Offerors are required to include completed bid forms, a non-collusion affidavit, a statement of qualifications using AIA A305, bonding documents, a bid bond if applicable, and supporting documentation—all printed, signed, and free of erasures. No electronic invoicing, federal accounting codes, or FAR-style clauses are referenced; instead, state-level public works regulations apply, including OSHA 10-hour training and certified payroll compliance. The contract does not include socioeconomic set-asides, UEI or CAGE code requirements, or formal evaluation factors, and award is expected to be based on compliance and pricing without a stated trade-off methodology. Any subcontractors or suppliers must be pre-approved by the Owner and Architect before engagement, and the Contractor is fully responsible for inspection, testing, and quality control unless otherwise mandated by law.

General Info

Ceiling removal and reinstallation of fixtures at Flood Middle School; bids due May 28, 2026.

Place of Performance

CT, USA

Set-Aside

NONE

Documents

4

Addendum 1 for Ceiling Replacement at Flood Middle School Library - Project 2026-28

PDF, High priority: read this firstamendment
High

Addendum 2 for Ceiling Replacement Flood Middle School Library 2026-28

PDF, High priority: read this firstamendment
High

Bid 2026-28 Ceiling Replacement Flood Middle School

PDF, High priority: read this firstifb
High

Solicitation Change Details Report BID 2026-28 Ceiling Replacement Flood Middle School

PDF, High priority: read this firstamendment
High

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

1 update
PhaseClosed
Posted

Solicitation

Notice updated

Notice details unchanged. Attachments may have changed.

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyConnecticut → DAS Procurement
Contacts1 person available
OfficeCT, USA
Organization / AgencyConnecticut → DAS Procurement
Office AddressCT, USA
Contacts
Phillip Ryan Purchasing AgentPrimary Contact

Full Description

Show more
Remove entire ceiling system. Remove and safe off all existing light fixtures. Secure and safe off all ceiling devices to remain and be reinstalled. Install new suspended ceiling system. Reinstall all existing ceiling devices. New light fixtures shall be provided and installed by others. Prebid: Tues, May 12th. ***DO NOT SUBMIT BIDS ELECTRONICALLY***

More opportunities from Connecticut → DAS Procurement

Same awarding agency

New
SLED
On-Call - Structural Engineering
Solicitation # 012.5-OC.STRUCT30
The University of Connecticut, through DAS Procurement, is seeking proposals for an On-Call Structural Engineering Master Agreement under a Quality-Based Selection process. The contract is intended to run from May 1, 2027, to October 31, 2030, and involves providing professional engineering services for the new construction, restoration, or repair of steel and concrete buildings, facades, infrastructure, and utility systems. The University may make multiple awards, and individual assignments under the agreement will not exceed 1 million dollars each. Selection for specific assignments will be based on the size and complexity of the work, previous performance, staff resources, current workload, and the submitted fee proposal. Proposals must be submitted via the HuskyBuy portal by November 24, 2026, at 7:00 PM. Required documentation includes a Professional Engineering Company License per Connecticut General Statutes, an executed SEEC Form 10, a Supplier Diversity Certificate if applicable, and an all-inclusive hourly rate form. Proposers must demonstrate technical and managerial ability by providing resumes for key personnel, such as Principals, Project Managers, and Engineers, using the specified ProfServ-RFQ forms. Evaluation will focus on the firm's ability to self-perform the majority of services and their capacity to provide high-quality technical documentation, including plans, specifications, and cost estimates.

POSTED

about 16 hours ago

DEADLINE

in 27 days
View Details

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS