CEMEX Mining and Reclamation Plan Permit Amendment (ZF #2018-0015)

Forecast
ZF #2018-0015State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

CEMEX seeks to amend its existing mining permit and reclamation plan for its off-channel operations in Yolo County, California, to extend the permit term by 20 years through 2047 and expand operational capacity. The amendment increases the total allowable tonnage, expands the area of simultaneous disturbance and processing activities, and adjusts phase boundaries while removing Phase 7 entirely. Reclamation timing is deferred for certain phases, and the plan shifts the balance of reclaimed land uses by reducing agricultural recovery and increasing the area designated for lake formation, while also expanding habitat restoration. The proposal includes corrections to inconsistencies between approved plans and actual on-the-ground conditions, ensuring alignment with current operations. The permitting process is governed by Yolo County’s Mining Ordinance and the California Environmental Quality Act, with oversight from the County’s Department of Community Services. The site, located at 30288 State Route 16 in Woodland, has been in operation since the 1970s, and the amendment requires compliance with strict reclamation standards including soil horizon restoration, groundwater protection, dust control, and long-term monitoring to meet SMARA requirements. No federal procurement elements are present—the process is a local land-use regulatory approval, not a contracted procurement—so there are no contract clauses, pricing details, delivery terms, or federal acquisition regulations applied. Performance obligations center on environmental mitigation, cultural resource protection, and adherence to approved reclamation benchmarks, with formal acceptance granted by Yolo County Planning Division upon verification of compliance. Technical attachments support the amendment with revised figures on reclaimed uses, evaporation estimates, habitat maps, and correspondence, all tied to CEQA-mandated environmental review rather than federal contracting procedures.

General Info

CEMEX seeks 20-year permit extension through 2047, expands mining capacity, shifts reclamation to more lake formation and habitat restoration in Yolo County.

Place of Performance

Hwy 16 and I-505, CA, 95653

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

View Full Breakdown

Get what you need to respond

No documents were posted with this contract.

  • Buyer contactEmail and phone
  • Original solicitationLink to the source posting
Get the buyer contact

Ask CLEATUS

I've read this contract. Ask me anything.

Timeline

PhaseForecast
Posted

forecast

Prepare for this forecast

Research the agency, track this forecast, and prepare your capture plan before the solicitation opens.

Organization & Contact Information

Show more
AgencyCalifornia → Yolo County
Contacts2 people available
OfficeN/A

Interested Companies (1)

Compass Land GroupMcClellan, CA

Full Description

Show more
CEMEX proposes to modify the approved mining permit and reclamation plan for an existing off-channel mining operation, which includes: 1) extending the term of the permit approvals by 20 years; 2) allowing mining of more total tonnage; 3) increasing the allowed acreage of simultaneous disturbance; 4) increasing the allowed area for processing activities; 5) allowing overall reclamation to occur later, including for certain phases; 6) removing Phase 7 from the operation; 7) addressing inconsistencies in approved plans versus on the ground conditions; 8) modifying phase boundaries; 9) modifying reclamation plans to reclaim more area and modifying reclamation end uses to decrease the area of reclaimed agriculture and increase the area of reclaimed lake; 10) increasing the area of reclaimed habitat; and 11) modifying other approvals to be consistent with the request.

Similar Contracts

Same NAICS industry code

NAICS: 541620
New
SLED
RFP for Preparation of an Initial Study Under CEQA
Solicitation # RFP-PLN-2504
The County of San Benito is soliciting proposals for the preparation of an Initial Study under the California Environmental Quality Act (CEQA). This project, identified as RFP-PLN-2504, requires the selected contractor to perform services in accordance with the Public Resources Code and the California Code of Regulations. The scope of work is divided into three primary tasks: project management, scope of services, and a traffic impact analysis. To support the study, the County has provided reference materials from planning files PLN250084 and PLN180004, which include grading and utility plans, a mitigated negative declaration, and various technical reports. Proposals must be submitted electronically via the OpenGov system by December 7, 2026, at 5:00 pm. The submission must be split into a technical proposal and a separate cost proposal using a specific pricing table. Award selection is based on a points-based scoring system that weights cost at 30%, firm qualifications at 25%, experience in similar CEQA analysis at 25%, and the quality of the written scope of work at 20%. The County reserves the right to award the contract to the highest-rated proposer rather than the lowest bidder. The resulting contract will be governed by the County of San Benito's Standard Contract, featuring a net-30 payment term with invoicing occurring one month in arrears. Contractors must certify compliance with various federal non-discrimination laws, including the Americans with Disabilities Act and the Civil Rights Act of 1964, and must provide a debarment certification. Final project schedules, including milestones and critical paths, will be required from the proposer, while specific insurance and indemnification terms will be finalized during the negotiation process.
Planning

POSTED

about 11 hours ago

DEADLINE

in 21 days
View Details
NAICS: 541620
New
International
Source Water Protection Plan - Baptiste Lake
Solicitation # 235899
The Regional District of East Kootenay is seeking a qualified consultant to develop a comprehensive and implementable Source Water Protection Plan for Baptiste Lake in British Columbia. The scope of work involves characterizing the lake and watershed as a drinking water source, identifying hazards and vulnerabilities, and evaluating current protection measures, governance, and climate-related risks. The final deliverables must include a detailed Source Water Protection Plan with recommended actions for land use and monitoring, a practical implementation plan with budget-level cost estimates, and a monitoring framework with decision triggers. The plan must align with the Edgewater Water System Master Plan, Interior Health permit conditions, and DFO screening requirements. The contract is expected to be awarded by December 18, 2026, with a project start-up meeting scheduled for mid-January 2027, a draft report due by May 28, 2027, and a final report due by July 2, 2027. Proposals are evaluated on a 100-point scale, with 40 points allocated to the project team and experience, 40 points for project understanding and methodology, and 20 points for the fee. The selection process prioritizes the highest overall ranking and best value rather than the lowest bid. Submissions must be delivered in PDF format to the designated Engineering Technician by the closing deadline.
Regional District of East Kootenay

POSTED

about 14 hours ago

DEADLINE

in 25 days
View Details

More opportunities from California → Yolo County

Same awarding agency

NAICS: 237990
SLED
Clark Pacific Facility Expansion Project
Solicitation # 2025031376
The Clark Pacific Facility Expansion Project, managed by the Yolo County Department of Community Services, involves the development of up to 500,000 square feet of new industrial buildings on a 76.76-acre site at 40307 Best Ranch Road in unincorporated Yolo County, California. The project scope includes site preparation, grading, trenching for utilities, paving, and the construction of facilities for the prefabrication of building materials and ancillary outdoor storage. To facilitate this expansion, the project requires a General Plan Amendment to redesignate the land use from Agriculture to Industrial and a rezone to Heavy Industrial. Site access will be provided via new driveways from Clark Junction, a private road owned and maintained by Clark Pacific. The project has undergone a comprehensive environmental review process in compliance with the California Environmental Quality Act, resulting in a Final Environmental Impact Report and a Notice of Determination filed on July 24, 2026. Key regulatory requirements include the submission of a Construction Traffic Control Plan to the County Public Works Division and the provision of FEMA Letters of Map Revision to the Chief Building Official prior to the acceptance of grading permits. Strict safety and operational mandates are in place regarding PG&E facility protections, including specific clearance requirements for towers and poles, the prohibition of hazardous materials or septic systems within easements, and adherence to California Division of Industrial Safety and CPUC General Order 95 standards. All excavation must follow 811 protocols before commencing.
Other Heavy and Civil Engineering Construction

POSTED

4 months ago

DEADLINE

N/A
View Details
NAICS: 541620
SLED
Addendum #2 to the Yolo County Central Landfill Permit Revisions EIR
Solicitation # 2020080465
Yolo County is implementing a series of updates to the Yolo County Central Landfill Permit Revisions Environmental Impact Report, specifically through Addendums 2 and 3. These modifications focus on expanding the operational capabilities and infrastructure of the facility. Key updates include the clarification of ancillary operational hours for Compost Facility 2, extending before-hours activities from 4:00 a.m. to 6:30 a.m. and after-hours activities until 9:00 p.m. Additionally, the project scope has been expanded to include a Landfill Gas Beneficial Use Project, which involves upgrading landfill gas collection and establishing a new processing facility to produce renewable natural gas and generate electricity to reduce emissions and improve energy efficiency. The project is managed by the Yolo County Department of Community Services, with Stephanie Cormier serving as the primary point of contact. All modifications have been conducted in compliance with the California Environmental Quality Act, with findings indicating that the changes do not result in new significant environmental effects or require additional mitigation measures beyond those established in the original 2021 EIR. The project is identified by solicitation number 2020080465 and is being executed in accordance with CEQA Guidelines and the Public Resources Code.
Environmental Consulting Services

POSTED

6 months ago

DEADLINE

N/A
View Details
NAICS: 925110
SLED
Yolo County Cannabis Land Use Ordinance
Solicitation # ZF2023-041
Yolo County has issued a Cannabis Use Permit authorizing the cultivation of cannabis on up to two acres of canopy under the provisions of the Yolo County Cannabis Land Use Ordinance (CLUO), which was established consistent with the certified Program Environmental Impact Report (SCH#2018082055) approved on September 14, 2021. The project qualifies for streamlined environmental review under CEQA Guidelines Sections 15168, 15162, and 15183, as it is deemed a later activity fully encompassed by the existing CLUO EIR, meaning no additional environmental documentation or mitigation planning is required beyond the standards already incorporated into the ordinance. Approval is contingent upon adherence to specified regulatory conditions including a minimum 530-foot buffer from residential properties, compliance with zoning and facility density limits, and submission of revised site plans if modifications are made. The permit is not a federal procurement contract and contains no FAR clauses, federal acquisition elements, or contract types such as FFP or IDIQ. Instead, it functions as a local land use authorization administered under California environmental law and county regulations. The applicant, Jack Brown, is required to submit documentation including a Notice of Exemption, a California Department of Fish and Wildlife No Effect Determination, and proof of prior fee payment, all of which must be physically attached to the application. Fees related to environmental review processing—such as $50, $3,495.25, and $4,123.50—are collected through internal county cash receipt form DFW 753.5a and deposited into account #137 under the Community Services department, with payments processed via check, cash, or electronic transfer to the county’s designated remit-to address in Woodland, California. The place of performance is Woodland, CA, with administrative oversight handled by the Yolo County Department of Community Services, the Office of Planning and Research, and the County Clerk’s Office. No federal contracting roles such as PCO, COR, or COTR are designated, and no UEI, CAGE, or small business certifications are required or submitted. The permit’s acceptance is formalized through County Board of Supervisors approval and filing of a Notice of Determination, with compliance monitored through regulatory enforcement rather than traditional contract inspection or performance evaluation criteria.
Administration of Housing Programs

POSTED

12 months ago

DEADLINE

N/A
View Details

Prepare for this forecast

Research this forecast and prepare for the solicitation

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS