Central Utility Plant Mechanical Upgrades

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

General Info

Agency

South Carolina → Greenville-Spartanburg Airport DistrictView Agency

NAICS

238220 - Plumbing, Heating, and Air-Conditioning ContractorsView NAICS

Place of Performance

SC, USA

Set-Aside

NONE

Documents

This scope was carved out of IFB-2026-0006.

The full solicitation package (1 document), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

Request for Proposals - Construction Manager at Risk Commercial Terminal Area Expansion Project - Phase 1

AI Contract Breakdown

Uniform Contract Format

No contract breakdown available.

Cannot generate Contract Breakdown because no documents were found from this contract's source.

Timeline

Posted

subcontract

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencySouth Carolina → Greenville-Spartanburg Airport District
ContactsNo contacts available
OfficeN/A
Organization / Agency
South Carolina → Greenville-Spartanburg Airport District
View Agency Profile
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Upgrades to chillers, boilers, pumps, and piping systems to support expanded terminal HVAC loads.

Similar Contracts

Same NAICS industry code

NAICS: 238220
New
CBP5933 Bldg. 225 HVAC Replacement
Solicitation # CBP5933
Management & Training Corporation (MTC) is seeking bids for a fixed-price, single lump sum subcontract to replace six split-system heat pump HVAC systems at Building 225 of the San Diego Job Corps Center in Imperial Beach, California. The scope of work includes the installation of three 2-ton and three 1.5-ton Payne heat pump systems with matching indoor air handlers, as well as the removal and disposal of old equipment. The contractor is responsible for all labor, materials, tools, and the procurement of all necessary permits and certifications. All work must comply with the California Mechanical and Electrical Codes, OSHA standards, and U.S. Department of Energy efficiency requirements. The estimated contract value ranges from 25,000 to 100,000 dollars. Bids are due by September 11, 2026, and will be evaluated based on overall best value, considering price, quality, and delivery schedule. This opportunity is set aside for various small business categories, including SDB, WOSB, HUBZone, and Veteran-Owned businesses. Because the project is subject to the Davis-Bacon Act, contractors must adhere to prevailing wage rates and provide certified payroll reports. For bids equal to or exceeding 25,000 dollars, a bid bond of 20 percent is required, along with performance and payment bonds from an A-rated surety company upon award. Required submission documents include the MTC Bid for Lump Sum Contract form, a detailed cost breakout on company letterhead, and a Unique Entity Identification number. Work must commence within 30 calendar days of the Notice to Proceed.
San Diego Job Corps Center

POSTED

about 12 hours ago

DEADLINE

in 12 days
View Details

More opportunities from South Carolina → Greenville-Spartanburg Airport District

Same awarding agency

NAICS: 237990
SLED
Request for Proposals - Construction Manager at Risk Commercial Terminal Area Expansion Project - Phase 1
Solicitation # IFB-2026-0006
The Greenville-Spartanburg Airport District is soliciting proposals for a Construction Manager at Risk (CMAR) to lead Phase 1 of the Commercial Terminal Area Expansion Project at Greenville-Spartanburg International Airport. With an estimated direct construction cost of 100 million dollars, the scope includes expanding the baggage handling system, constructing two new 10,000 square foot elevated buildings, expanding screening and ticket counter areas, and potentially adding a North Baggage Claim Hall and administration office expansion. The selected CMAR will provide pre-construction, construction management, and construction services, with a primary focus on maintaining active terminal operational continuity and safety. The procurement follows a two-step competitive process based on FAA guidelines, evaluating firms first on their Statement of Qualifications and subsequently on price and interviews for a shortlist of up to three firms. Award decisions are based on best value, considering technical expertise, safety records, and DBE participation. The contract will be governed by AIA A133 2019 and AIA A201-2017 agreements and requires a South Carolina BD-5 general contractor license. Compliance with the Davis-Bacon Act, Buy American requirements, and 49 CFR Part 26 for DBE goals is mandatory. Proposals are due by September 11, 2026, with the goal of concluding negotiations by December 18, 2026.
Other Heavy and Civil Engineering Construction

POSTED

26 days ago

DEADLINE

in 12 days
View Details