Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, September 2 at 2:00 PM EDT

Register Free →

Request for Proposals - Construction Manager at Risk Commercial Terminal Area Expansion Project - Phase 1

Active
IFB-2026-0006State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The Greenville-Spartanburg Airport District is soliciting proposals for a Construction Manager at Risk (CMAR) to lead Phase 1 of the Commercial Terminal Area Expansion Project at Greenville-Spartanburg International Airport. With an estimated direct construction cost of 100 million dollars, the scope includes expanding the baggage handling system, constructing two new 10,000 square foot elevated buildings, expanding screening and ticket counter areas, and potentially adding a North Baggage Claim Hall and administration office expansion. The selected CMAR will provide pre-construction, construction management, and construction services, with a primary focus on maintaining active terminal operational continuity and safety. The procurement follows a two-step competitive process based on FAA guidelines, evaluating firms first on their Statement of Qualifications and subsequently on price and interviews for a shortlist of up to three firms. Award decisions are based on best value, considering technical expertise, safety records, and DBE participation. The contract will be governed by AIA A133 2019 and AIA A201-2017 agreements and requires a South Carolina BD-5 general contractor license. Compliance with the Davis-Bacon Act, Buy American requirements, and 49 CFR Part 26 for DBE goals is mandatory. Proposals are due by September 11, 2026, with the goal of concluding negotiations by December 18, 2026.

General Info

Greenville-Spartanburg Airport seeks CM at Risk for Phase 1 terminal expansion including new gates, baggage system, and security upgrades by September 11, 2026.

Agency

South Carolina → Greenville-Spartanburg Airport DistrictView Agency

NAICS

237990 - Other Heavy and Civil Engineering ConstructionView NAICS

Place of Performance

SC, USA

Set-Aside

NONE

Documents

(1)

GSP CTEP CMAR RFP 080426f - Construction Manager at Risk Services for Commercial Terminal Area Expansion Phase 1

PDFrfp

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseSolicitation
Posted

Solicitation

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencySouth Carolina → Greenville-Spartanburg Airport District
Contacts1 person available
OfficeSC, USA
Organization / Agency
South Carolina → Greenville-Spartanburg Airport District
View Agency Profile
Office AddressSC, USA

Full Description

Show more
The Greenville-Spartanburg Airport District (District) is seeking to receive Statements of Qualifications (SOQs) and Price Proposals from Construction Managers at Risk (CMAR) to provide pre-construction, construction management and construction services for the Commercial Terminal Area Expansion Project. The project is located at the Greenville-Spartanburg International Airport (GSP) in Spartanburg County, South Carolina. The Commercial Terminal Area Expansion Project contemplates expanding the terminal to provide a new Baggage Handling System (BHS), new north bag claim hall, seven (7) additional aircraft gates, enlarged concession areas, expanded security checkpoint area, upgraded and expanded central utility plant, expanded administration offices, a new Federal Inspection Station (FIS) and international arrivals curb, apron construction, and the completion of other miscellaneous terminal improvements. The Commercial Terminal Area Expansion Project will be implemented in four phases as depicted in Figure 2 on the following page and in Attachment A. This RFP is intended to result in the selection of a CMAR for Phase 1 of the Commercial Terminal Area Expansion Project.

Similar Contracts

Same NAICS industry code

NAICS: 237990
New
North of River Sanitary District No. 1 WRRF Upgrades and Expansion
Solicitation # north-river-sanitary-district-no-1-wrrf-upgrades-expansion
Kiewit Infrastructure West Co. is soliciting sub-quotes for the North of River Sanitary District No. 1 Water Resource Recovery Facility Upgrades and Expansion project located in Bakersfield, California. The scope of work is extensive, covering civil and site work such as aggregates, trucking, asphalt paving, and curb and gutter, as well as structural and finishing tasks including concrete reinforcing, masonry, welding, roofing, and electrical work. The bid deadline is September 17, 2026, at 10:00 a.m., and interested firms must contact Kiewit to receive an Invitation to Bid through the Building Connected system. Because the project is partially financed by the Water Infrastructure Finance and Innovation Act administered by the EPA, it must comply with the American Iron and Steel provisions, Davis-Bacon Related Acts, and DBE Program requirements. Eligible bidders include certified DBE, MBE, WBE, SBE, and other disadvantaged or small business enterprises. Qualified subcontractors must possess a valid California Contractor's license, provide acceptable insurance, and may be required to provide bonding for 100 percent of their contract value, with bond premiums reimbursed by Kiewit. Kiewit also emphasizes the importance of labor harmony and will consider quotes from bidders capable of maintaining positive human relations on the project.
Kiewit Infrastructure West Co.

POSTED

about 12 hours ago

DEADLINE

in 18 days
View Details
NAICS: 237990
New
Haleiwa Small Boat Harbor Maintenance Dredging and Revetted Mole Repair
Solicitation # W9128A26BA002
The Haleiwa Small Boat Harbor Maintenance Dredging and Revetted Mole Repair project, solicitation W9128A26BA002, is a firm-fixed-price contract issued by the U.S. Army Corps of Engineers Honolulu District. The project is located in Haleiwa, Oahu, Hawaii, and is set aside for small businesses, including SDB, WOSB, HUBZone, and VOSB certifications. The estimated contract value ranges from 1,000,000 to 5,000,000 dollars, with a performance period of 200 calendar days from the date of the Notice to Proceed. The scope of work is divided into three primary components: mobilization and demobilization, the dredging and ocean disposal of approximately 4,260 cubic yards of material, and the repair of the revetted mole, which includes clearing, grubbing, and stone rework. The contract requires strict adherence to USACE EM 385-1-1 safety standards and ASTM international standards for stone materials. Key personnel requirements include a Project Manager, Project Superintendent, Quality Control System Manager, and Site Safety and Health Officer, all of whom must be approved by the Contracting Officer. Bidders must provide a bid guarantee and subsequent performance and payment bonds. Liquidated damages for construction delays are set at 2,297 dollars per calendar day. Quality control is managed through a three-phase inspection process, and final acceptance is contingent upon a certificate from the QC Manager attesting that all work complies with the contract specifications. Payment is handled via monthly invoices, and the contract is subject to Davis-Bacon Act prevailing wage requirements.
Healy Tibbitts Builders, Inc.

POSTED

about 12 hours ago

DEADLINE

in about 1 month
View Details