Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, August 5 at 2:00 PM EDT

Register Free →

Independence Rock Creek Wastewater Treatment Plant Sludge Thickening Improvements

Active
26046State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The City of Independence is soliciting bids for improvements at the Rock Creek Wastewater Treatment Plant, specifically focused on sludge thickening upgrades. The project includes the demolition of existing Dissolved Air Flotation units and the installation of new Rotary Drum Thickeners along with associated polymer and transfer pump systems. Electrical supply upgrades will be made to power each new thickener and related equipment, and piping modifications will be implemented to accommodate system changes. Additional work involves installing new HVAC systems and performing wall and ceiling painting throughout the affected areas. All bids must be submitted online through the Public Purchase website, and paper, fax, or email submissions will not be accepted. A virtual bid opening will be held via Microsoft Teams on the specified date and time, with access details provided for both online participation and phone dial-in. Questions regarding the solicitation must be directed through the Public Purchase portal. The response deadline is August 28, 2026, and the point of contact for inquiries is Richelieu Sese at the City of Independence.

General Info

City seeks bids for sludge thickening upgrades at Rock Creek Wastewater Plant, due August 28, 2026.

Agency

Missouri → City of IndependenceView Agency

NAICS

237990 - Other Heavy and Civil Engineering ConstructionView NAICS

Place of Performance

MO, USA

Set-Aside

NONE

Documents

(4)

Independence RCWWTP Sludge_Vol 3_Drawings_Bid.pdf

PDF

Instructions for Responding to Bid

PDFspecial-notice

Independence RCWWTP Sludge_Vol 1_Specifications_Bid_UPDATED.pdf

PDF

Independence RCWWTP Sludge_Vol 2_Standard Details_Bid.pdf

PDF

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseSolicitation
Posted

Solicitation

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyMissouri → City of Independence
Contacts1 person available
OfficeN/A
Organization / Agency
Missouri → City of Independence
View Agency Profile
Office AddressN/A

Full Description

Show more
The Project consists of improvements at the Rock Creek Wastewater Treatment Plant (RCWWTP) including the following: • Demolition of existing Dissolved Air Flotation (DAF) Units. • Installation of new Rotary Drum Thickeners and associated polymer and transfer pump systems. • Installation of new electrical supplies to each Rotary Drum Thickener and associated equipment. • Piping modifications. • Installation of new HVAC systems. • Wall and ceiling painting Questions should be submitted to the Public Purchase website, www.publicpurchase.com Bids must be submitted online via www.publicpurchase.com. Paper, fax, or email bids will NOT be accepted and will not be returned to sender. There will be a virtual bid opening. The url for this event will be: Microsoft Teams meeting Join: https://teams.microsoft.com/meet/267162748574485?p=CCJYNW21ihLVGSblbm Meeting ID: 267 162 748 574 485 Passcode: cZ7no7Xm or Dial in by phone +1 660-631-8082,,52056462# United States, Marshall Find a local number Phone conference ID: 520 564 62#

Similar Contracts

Same NAICS industry code

NAICS: 237990
New
SLED
AIRFIELD 2030 ALL PROJECTS (AIP / AUI / CIRCUITS / FOD) CombinedThe contract encompasses a broad range of airfield infrastructure upgrades at the Port of Seattle, focusing on enhancing safety, efficiency, and compliance. Key components include replacing aging airfield lighting circuits with low megger readings with modern LED fixtures and signs to improve visibility and reduce maintenance costs. Concurrently, failing pavement sections and critical utilities will be removed and replaced to ensure structural integrity and operational reliability. Wildlife hazard mitigation measures involve removing turf edge dams along runways, taxiways, and access roads, installing anti-perching devices on signs to deter birds, and addressing ponding issues through regrading and new storm drainage infrastructure. Additionally, deteriorating flush fire hydrant access hatches will be replaced to ensure rapid access for emergency response teams. The project is categorized under NAICS code 237990 and falls under the Aviation Project Management Group, with the Port of Seattle as the overseeing agency. The solicitation is posted as a forecast with no set-aside classification, indicating it is open to all eligible contractors. Primary point of contact for inquiries is Yanet Maldonado, reachable via email or phone, and additional details can be accessed through the provided portal link. The project is anticipated to begin after the posted date in July 2026, with all work taking place at the airport facility.
Aviation Project Management Group

POSTED

about 3 hours ago

DEADLINE

N/A
View Details
NAICS: 237990
New
SLED
AIRFIELD 2029 ALL PROJECTS (AIP / AUI / CIRCUITS / FOD) CombinedThe contract encompasses a broad range of airfield infrastructure improvements at the Port of Seattle, focusing on modernization and safety enhancements across multiple systems. Key components include replacing airfield lighting circuits with low megger readings with new LED fixtures and signs to improve reliability and energy efficiency, replacing deteriorating pavement and critical utilities to maintain operational integrity, and implementing comprehensive wildlife hazard management measures such as removing turf edge dams, installing anti-perching devices on signs, and regrading areas with new storm drainage to eliminate ponding and reduce bird attractants. Additionally, failing flush fire hydrant access hatches will be replaced to ensure rapid and unobstructed access for emergency response. The project is part of the AIRFIELD 2029 ALL PROJECTS initiative, classified under NAICS code 237990 for other heavy and civil engineering construction, and is managed by the Aviation Project Management Group under the Port of Seattle. Solicitations are open with a posted date of July 31, 2026, and inquiries should be directed to Yanet Maldonado, the primary point of contact. The work is critical to maintaining airfield safety, regulatory compliance, and long-term operational readiness, with all efforts centered on upgrading aging infrastructure to meet current aviation standards.
Aviation Project Management Group

POSTED

about 3 hours ago

DEADLINE

N/A
View Details
NAICS: 237990
New
45th Ave SW Culvert Replacement and Habitat Restoration
Solicitation # 45th-ave-sw-culvert-replacement-habitat-restoration
The City of Seattle is seeking contractors for the replacement of a culvert along 45th Avenue SW and the accompanying restoration of surrounding habitat, with the project located in King County, Washington. The solicitation, identified by bid number 2025-017, is open to Minority Business Enterprises certified by NMSDC and Woman Business Enterprises certified by WBENC, with no federal set-aside provisions applying. The work involves removing and replacing the existing culvert infrastructure while implementing ecological restoration measures to enhance local waterways and natural habitats. The project falls under NAICS code 237990, indicating it is classified as other heavy and civil engineering construction, and is being managed directly by Shimmick Construction Company, Inc. as the responsible organization. All proposals must be submitted by the deadline of August 12, 2026, with the solicitation posted on August 5, 2026. The primary point of contact for questions or clarification is Jamie Miranda of Shimmick Construction, reachable via phone or email. The project’s performance location is in Seattle, Washington, and interested parties are encouraged to review additional details through the provided link. The contract emphasizes environmental stewardship alongside civil infrastructure improvement, requiring contractors to comply with local regulations and restoration standards to ensure long-term ecological benefits alongside functional infrastructure upgrades.
Shimmick Construction Company, Inc

POSTED

about 3 hours ago

DEADLINE

in 7 days
View Details

More opportunities from Missouri → City of Independence

Same awarding agency

NAICS: 238990
SLED
Traffic Control Device Installation & Removal ServicesThe City of Independence is soliciting bids for subcontracted services related to the on-site installation, maintenance, and removal of temporary traffic control devices within designated work zones along city-maintained roadways. This contract encompasses all necessary activities to ensure safe and compliant traffic management during construction, maintenance, or utility operations, requiring adherence to state and federal standards for traffic control. Contractors must be prepared to respond promptly to work zone schedules, operate safely in active roadway environments, and maintain equipment and personnel to support round-the-clock or time-sensitive deployment as needed. The opportunity is open as a subcontract and has a response deadline of August 25, 2026, with the solicitation posted on July 27, 2026. The North American Industry Classification System code listed is 238990, indicating it falls under other specialty trade contractors, typically covering specialized construction services not classified elsewhere. The place of performance is limited to roadways under the jurisdiction of the City of Independence in Missouri, and bidders must comply with all local regulations and safety protocols. While no set-aside designation or specific point of contact details are provided, interested parties should access the official bid page via the provided link for full submission requirements and terms.
All Other Specialty Trade Contractors

POSTED

8 days ago

DEADLINE

in 20 days
View Details
NAICS: 238320
SLED
Protective Coatings Replacement: Filter No. 10 Courtney Bend Water Treatment Plant
Solicitation # 26037
The City of Independence, Missouri, is seeking qualified firms to perform protective coating replacement on Filter No. 10 at the Courtney Bend Water Treatment Plant. The scope of work requires comprehensive surface preparation and application of new protective coating systems to both interior and exterior surfaces of the filter, including all necessary equipment, materials, labor, and workmanship to ensure durable, high-quality results. Bids must be submitted electronically through the publicpurchase.com portal by the deadline of August 25, 2026, with no paper, fax, or email submissions accepted. A virtual bid opening will be conducted on the same date via Microsoft Teams, with access details provided for participants. The place of performance is clearly defined as the Filter No. 10 facility located in Independence, Missouri. The contract is issued as an Invitation to Bid under solicitation number 26037, with a NAICS code of 238320, indicating a focus on specialized trade contracting. While the estimated contract value is not specified, the solicitation implies a firm-fixed-price structure typical of public works bids. The contractor must comply with Missouri Revised Statute § 34.600, certifying that they do not participate in any boycott of Israel, and must submit a signed affidavit affirming this compliance. Labor compensation must adhere to prevailing wage requirements under Missouri state law, with no additional details provided regarding payment terms, accounting codes, invoicing systems, or inspection criteria beyond general compliance with public works regulations. No formal contract clauses, evaluation factors, packaging standards, or detailed inspection procedures are included in the solicitation materials. Contract administration information such as the Contracting Officer, COR, COTR, or payment office details is not provided. All submissions must be uploaded through the online portal using any acceptable file type, with no restrictions on format, number of files, or document length.
Painting and Wall Covering Contractors

POSTED

15 days ago

DEADLINE

in 20 days
View Details
NAICS: 541211
SLED
Prevailing Wage Compliance and Payroll ReportingThe contract requires the administration of certified payroll services in full compliance with the prevailing wage regulations set by the Missouri Department of Labor and Industrial Relations. This includes accurate tracking of employee hours, proper classification of job roles according to prevailing wage schedules, timely submission of certified payroll reports, and adherence to all state-mandated documentation and reporting procedures. The work must be performed in alignment with the legal and procedural standards applicable to public works projects under Missouri law, ensuring transparency, accuracy, and audit readiness throughout the contract period. This is a subcontract for services associated with the City of Independence in Missouri, with a focus on payroll compliance for projects subject to state prevailing wage laws. The solicitation was posted on July 21, 2026, and responses are due by August 26, 2026. The North American Industry Classification System code 541211 indicates this involves accounting, tax preparation, bookkeeping, or payroll services. All performance is expected to occur within the jurisdiction of Missouri, and compliance with state labor standards is mandatory. There is no set-aside designation specified, and the contract does not include details about the point of contact or physical location of performance beyond the state level.
Offices of Certified Public Accountants

POSTED

15 days ago

DEADLINE

in 21 days
View Details