Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, December 9 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Texas was posted on September 26, 2025. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Central Wastewater Treatment Plant Final Clarifier 3 Rebuild

Closed
RFB 2025-073State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 236220
New
SLED
Building 262 Renovations FLETC Glynco
Solicitation # 70LGLY27RSSB00001
Solicitation 70LGLY27RSSB00001 is a total small business set-aside for a single firm fixed price contract to perform comprehensive interior renovations of Building 262 at the Federal Law Enforcement Training Center in Glynco, Georgia. The scope of work includes replacing corridor and classroom flooring with LVP and carpet tiles, fully remodeling restrooms, updating doors and life-safety components, and repainting interior surfaces. Technical upgrades involve installing raised flooring with integrated electrical distribution for classrooms, replacing variable air volume systems, and updating lighting controls and plumbing. The project is scheduled for a period of performance from January 11, 2027, to March 11, 2028, with a total duration of 425 calendar days after the notice to proceed. The procurement is managed by the Department of Homeland Security, with proposals due by November 18, 2026. Award evaluation is based on three factors of equal importance: past performance, corporate relevant experience, and price. Successful offerors must provide payment and performance bonds, as well as a bid guarantee of 20 percent of the bid price or 3 million dollars. Strict security protocols are in place, requiring background checks, FBI fingerprinting, and adherence to DHS non-disclosure agreements for personnel. All work must comply with ADA accessibility guidelines and prevailing wage determinations for the Georgia region.
Bristol Alliance of Companies

POSTED

about 2 hours ago

DEADLINE

in 15 days
NAICS: 236220
New
SLED
Repair Auto Maintenance Bldg 575
Solicitation # N40085-27-R-9000
Solicitation N40085-27-R-9000 is for the repair and modernization of the Auto Maintenance Facility, Building 575, at Marine Corps Base Camp Lejeune, North Carolina. The project scope is comprehensive, involving selective demolition, building envelope repairs, new roofing, and interior reconfiguration. Key technical upgrades include the installation of new HVAC systems, rooftop air-handling units, air-cooled water chillers, exhaust extraction, compressed air systems, and a full NFPA-compliant fire suppression system. Additionally, the work covers the replacement of electrical distribution, lighting, low-voltage systems, building automation controls, and site improvements such as paving, drainage, and hazardous materials abatement. The contract is estimated between 10 million and 25 million dollars with a performance period of 730 days after award. Award will be based on the lowest price for two primary exhibit line items: building renovation and paving removal and replacement. Proposals are due by November 23, 2026. Depending on the proposal value, contractors may be required to provide bid, payment, and performance bonds, with bid bonds set at 20 percent of the proposal amount. The project is subject to the Davis-Bacon Act and Buy American requirements, and all work must comply with ADA accessibility guidelines. Invoicing is processed monthly via Wide Area Work Flow (WAWF) using NAVFAC Form 7300/30.
Bristol Alliance of Companies

POSTED

about 2 hours ago

DEADLINE

in 6 days
NAICS: 236220
New
Springdale JCC –Dormitory Interior Renovation & Repairs
Solicitation # springdale-jcc-dormitory-interior-renovation-repairs
The Springdale Job Corps Center, operated by Career Systems Development Corporation for the U.S. Department of Labor, is soliciting proposals for the interior renovation and repair of its North Wing dormitory in Troutdale, Oregon. The project aims to restore residential rooms, bathrooms, common areas, and mechanical rooms that suffered extensive interior damage due to water intrusion. The scope of work includes drywall installation, joint finishing, and painting, as well as the temporary removal and re-installation of HVAC equipment. The selected contractor must provide all labor, materials, equipment, and supervision to return the affected spaces to safe residential use, ensuring proper protection of the occupied building and minimal service interruptions. This solicitation is set aside for small businesses, including VOSB, SDVOSB, WOSB, and HUBZone certified firms. Proposals must include detailed relevant experience, a comprehensive work plan with project phasing, and itemized pricing by room and trade. The project is subject to the Davis Bacon Act under wage determination OR20260100, requiring the submission of weekly certified payrolls. Awardees must provide payment and performance bonding for the full project value, along with liability and worker's compensation insurance, within ten days of award. Final acceptance by CSD is contingent upon the correction of all deficiencies and the provision of a minimum one-year workmanship warranty.
Career Systems Development Corporation

POSTED

about 2 hours ago

DEADLINE

in 2 days
NAICS: 236220
New
SLED
MTU Building Upgrades – Various Sites
Solicitation # 26.27.0938
The San Bernardino County Superintendent of Schools is soliciting bids for solicitation number 26.27.0938 to perform building upgrades at four school sites: Judson and Brown Elementary School in Redlands, San Salvador Pre-School in Colton, Moreno Elementary School in Montclair, and Crestline Elementary School in Barstow. The scope of work includes HVAC replacement, roofing improvements, and related enhancements to concrete, drainage, grading, parking lots, and accessibility. The project has a duration of 420 calendar days and will commence upon the receipt of a written Notice to Proceed. Bidders must possess a valid California Class B General Building Contractor license and be registered with the California Department of Industrial Relations. Mandatory requirements for a responsive bid include attending the entire job walk, signing in at each site, and acknowledging all issued addenda. Sealed bids must be submitted by December 17, 2026, at 2:00 p.m. Pacific Time to the Front Desk Receptionist in San Bernardino. Submissions must include a bid security of at least 10 percent of the total base bid, and the successful contractor must provide performance and payment bonds equal to 100 percent of the contract price. Required documentation includes various certifications such as a Drug-Free Workplace Certification, Non-Collusion Declaration, and DVBE Participation Statement.
San Bernardino County Superintendent of Schools

POSTED

about 2 hours ago

DEADLINE

in about 1 month

AI Contract Overview

Show more

The project involves the comprehensive reconstruction of Secondary Clarifier #3 at the Central Wastewater Treatment Plant in Waco, Texas. The selected contractor is responsible for providing all labor, equipment, materials, and incidentals necessary to demolish, remove, dispose of existing components, and install new mechanical and structural elements in accordance with Evoqua specifications. Key tasks include replacing worn or damaged mechanical parts such as the center column, rake arms, nuts, bolts, skimmers, gearboxes, motors, and hardware previously purchased from Evoqua. The scope also encompasses restoring electrical and process water plumbing to their original operational status, performing adjustments to ensure proper functionality, and coordinating inspection and startup testing with Evoqua representatives at the City’s expense. The work must adhere to OSHA safety standards, municipal codes, and environmental regulations, with the contractor required to submit as-built drawings, a completion report, and a standard labor warranty upon project completion. The contract emphasizes that the general contractor must self-perform at least 51% of the work, with a liquidated damages fee of $1,000 per day for delays. The project’s estimated value ranges from $500,000 to $1,500,000, and it is managed by the Water Utilities department of the City of Waco. The solicitation, issued under RFB 2025-073 on September 26, 2025, includes detailed instructions for bid submission via the City’s electronic portal, with a response deadline of October 23, 2025. Notably, Texas Department of Transportation qualifications are not required for this project. Overall, the project aims to restore the clarifier to full operational capacity, ensuring compliance with all relevant standards and specifications, and completing all site work, labor, and materials as specified.

General Info

Documents

1
PDF, High priority: read this first169 pages · ifb
High

Read the document

Every page of every file, in your free workspace.

Read the document

AI Contract Breakdown

Uniform Contract Format

Contract not broken down yet

CLEATUS splits the solicitation into Uniform Contract Format (UCF) sections: scope, pricing, deliverables, and evaluation criteria.

This one is closed. Find the next one like it.

Open contracts like this one, right now:

  • Building 262 Renovations FLETC GlyncoOpen now, due in 16 days
  • Repair Auto Maintenance Bldg 575Open now, due in 7 days
See open contracts like this

Ask CLEATUS

I've read this contract. Ask me anything.

Timeline

1 update
PhaseClosed
Posted

Solicitation

Notice updated

Response deadline changed from May 29, 2025 to Oct 23, 2025. The notice title changed. NAICS code changed from 561720 to 236220. The notice description changed. The point of contact changed.

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyTexas → Water Utilities
ContactsNo contacts available
OfficeN/A
Organization / AgencyTexas → Water Utilities
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
The selected contractor shall provide all labor, equipment, materials, appurtenances, and incidentals necessary to complete the demolition, removal, disposal, and installation work required to fully rebuild the Secondary Clarifier #3 at the Central Wastewater Treatment Plant in accordance with Evoqua specifications. The scope includes removing and replacing worn or damaged mechanical components which include center column, rake arms, nuts, bolts, other hardware, skimmers, gear box, motor, and large lower gear box previous purchased by the City of Waco from Evoqua and ensuring existing electrical and process water plumbing are returned to original functioning status. The contractor must perform all necessary adjustments to ensure the clarifier functions per manufacturer standards, coordinate inspection and startup testing with an Evoqua authorized representative (at the City of Waco’s cost), and ensure the unit passes all functionality tests. All work shall comply with applicable OSHA safety standards, municipal codes, and environmental regulations. At project close-out the contractor shall submit as-built drawings, a completion report, and provide a standard labor warranty. The project requires all site work, labor, equipment, and materials complete and in place as stated in the RFB, shown on the plans, and specified herein. General Contractor shall self-perform 51% of this project. Liquidation Fee is $1,000.00 for each day of delay. TxDot Qualifications are NOT Required for this project.

More opportunities from Texas → Water Utilities

Same awarding agency

NAICS: 237110
New
SLED
Yarrington Water Treatment Plant Disinfection Modification
Solicitation # IFB-2026-072
The City of Kyle, Texas, is soliciting bids for the Yarrington Water Plant Disinfection Improvements project under solicitation IFB-2026-072. The primary scope of work involves the removal and replacement of the existing chlorine gas system and all associated appurtenances, including gas cylinders, analyzers, and yard piping, alongside miscellaneous building improvements. Bidders may also provide an alternate bid for the demolition of the chlorine gas system to install an Onsite Sodium Hypochlorite Generation system, which includes a new Fiberglass Reinforced Polymer building and related equipment. The project is expected to be completed within 230 calendar days, with substantial completion required within 200 days and final completion within 30 days thereafter. The contract will be awarded to the responsible bidder with the lowest bid, evaluated based on responsiveness, qualifications, and financial ability in accordance with Chapter 2269 of the Texas Government Code. Bids are due by December 1, 2026, and must be submitted via the OpenGov portal. Required submission materials include a completed bid form, bid security of at least five percent of the total bid amount, and current insurance certificates. The selected contractor must provide performance and payment bonds for 100 percent of the contract amount and adhere to minimum prevailing wage standards. All work must comply with City of Kyle construction standards and Texas Commission on Environmental Quality regulations.
Water and Sewer Line and Related Structures Construction

POSTED

5 days ago

DEADLINE

in 14 days
View Details
NAICS: 237110
SLED
Lehman Rd Pump Station Improvements
Solicitation # 2026-076
The City of Kyle is soliciting proposals for the Lehman Rd Pump Station Improvements to address increased water storage and pumping needs in Pressure Plane 1. The project scope includes the development of a 3.0 MG concrete ground storage tank, a new pump station, and a disinfection room, as well as the rehabilitation of an existing 0.5 MG ground storage tank. The work encompasses multidisciplinary construction, including civil site work, earthwork, utilities, and the installation of concrete sidewalks and steps. The project is designed to consolidate pumping operations and improve system redundancy to support the city's rapid growth in the southeastern region. The contract requires substantial completion within 510 calendar days, with final payment readiness by day 540. Award evaluation is based on a weighted scoring system: contract price (50 points), contractor experience and qualifications (30 points), proposed schedule (20 points), and an optional interview (10 points). Bidders must provide a bid bond of at least 5% of the total proposal price and provide performance and payment bonds upon execution. Technical requirements include strict adherence to ASME A13.1 for piping identification, ADA accessibility guidelines, and NIST 800-171 cybersecurity standards for camera systems. All laborers must be paid according to specified wage rate determinations, and the contractor must be authorized to do business in Texas.
Water and Sewer Line and Related Structures Construction

POSTED

8 days ago

DEADLINE

in about 1 month
View Details

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS